My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 10/6/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
HDR Engineering Inc. 10/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 10:18:22 AM
Creation date
10/14/2022 10:16:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
10/6/2022
Council Approval Date
10/5/2022
End Date
12/31/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Lexington-Broadway Drainage Improvements
Public Works WO Number
UT3792
Tracking Number
0003503
Total Compensation
$1,299,908.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> SUBCONSULTANTS <br /> City of Everett: Lexington Avenue Storm Drainage Imp.Preliminary Design <br /> I.) David Evans Associates HWA c a <br /> m <br /> x _ m a <br /> I Fes- co .0 F C <br /> SUBCONSULTANTS o � <br /> V7 a <br /> co <br /> 5.00% <br /> 200 Survey <br /> Task Total $146,000.00 $0.00 $146,000.00 $7,300.00 $153,300.00 <br /> 300 Geotechnical <br /> Task Total $0.00 $104,149.00 $104,149.00 $5,207.45 $109,356.45 <br /> Total Subconsultantsll$ 146,000.00 I $ 104,149.00 0I$ 250,149.00 II$12,507.45 Il$ 262,656.45 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.