My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 10/6/2022 (2)
>
Contracts
>
6 Years Then Destroy
>
2023
>
HDR Engineering Inc. 10/6/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 10:26:46 AM
Creation date
10/14/2022 10:26:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
10/6/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Jamielee Graves
Subject / Project Title
Water Sewer Surface Water Connection Charge
Tracking Number
0003504
Total Compensation
$34,945.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY <br /> HDR will have developed a surface water connection charge per impervious surface unit <br /> (ISU). <br /> Expected City Staff Support for Task 4: <br /> • Respond to additional data requests or provide information as needed <br /> • Review technical analysis and provided feedback on an initial draft of the connection charge <br /> analysis. <br /> • Participate in a three-hour virtual meeting, to review the draft connection charge results. <br /> Deliverables as a Result of Task 4: <br /> • Draft connection charge analysis for the water, sewer and surface water utilities <br /> • A three-hour virtual meeting, to discuss the draft connection charge analysis. <br /> Task 5 — Study Documentation — After the technical analysis has been completed, HDR will <br /> prepare a written report documenting the steps taken in the development of the technical <br /> analysis, calculation of the connection charges and the study's findings and conclusions. HDR will <br /> provide the report in electric format to the City to review and provide comments, corrections or <br /> additions to be incorporated into the final report. The final report will be provided to the City in <br /> electronic format. <br /> Expected Commission Staff Support for Task 5: <br /> • Review and comment on the draft written report for the water rate study. <br /> Deliverables as a Result of Task 5: <br /> • An electronic version (e.g., Microsoft Word, PDF) of the draft written report. <br /> • An electronic version (e.g., Microsoft Word, PDF) of the final connection charge study. <br /> The above tasks conclude the proposed scope of services to assist the City in the development of <br /> the proposed connection charges. At this time the study assumes all virtual project meetings and <br /> no public presentations have been included. If City staff request additional services, such as <br /> public presentations, they will be provided on a time and material basis at current hourly rates <br /> and as agreed to in writing between HDR and the City. This proposed scope of services can be <br /> modified to meet the specific needs of City. <br /> Key Project Team Members <br /> Provided below is a brief discussion of each of the project team members for City's analysis. <br /> Kevin Lorentzen, Project Manager—Kevin will provide overall project management, review and <br /> of the analyses, as well as provide analytical support and guidance for the development of the <br /> proposed connection charges. Kevin has been involved in the past rates and charge studies HDR <br /> has conducted for the City in the since 2016. <br /> Judy Dean, Task Lead — Judy will be the task lead for the development of the proposed <br /> connection charges. Judy has assisted the City with the last connection charge study. In this role, <br /> Judy will lead the analytical tasks to develop the connection charges. <br /> Shawn Koorn, Project QA/QC - Shawn will provide quality assurance/quality control for this <br /> hdrinc.com 929 108th Avenue NE Suite 1300 Bellevue,WA 98004-4361 <br /> (425)450-6200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.