Laserfiche WebLink
7' <br />Q R S T <br />F1 <br />LP1A <br />AFG 36TIA LCP2 <br />T7 <br />40'-6" <br />AFG <br />LP1A <br />36 <br />LP1A-- <br />17.6 <br />VIA LCP2 <br />36 <br />AFG VIA LCP2 <br />1 630� ut" <br />RP2A: 384.J <br />00 <br />W <br />Lu <br />LL <br />Z11 <br />W1 <br />Z <br />00 <br />alp <br />0 <br />Lj- <br />U <br />17' <br />F1 <br />F1 <br />AFG <br />LP1A <br />36 <br />LP1A <br />17' <br />VIA LCP2 <br />AFG VIA LCP2 <br />9, <br />o <br />IOU <br />17' <br />AFG <br />F1 <br />LP1A <br />36 <br />F1 <br />17' LP1A <br />36 <br />VIA LU/- <br />t' <br />AFG <br />VIA LCP2 <br />1 Rot <br />16('1 <br />/-r, X <br />- ----- --- ------ <br />NORTH <br />CANOPY FLOOR <br />PLAN - LIGHTING <br />& POWER <br />1/81f = 11-01, <br />j <br />10 <br />18.51 <br />AFG F1 <br />INV-1 <br />2 )('% ,a <br />F1 <br />LP1A <br />36 <br />-- - --- - ------ <br />GENERAL NOTES: <br />A. THE ELECTRICAL EQUIPMENT SHOWN ON <br />THIS SHEET IS DIAGRAMMACTICAL IN <br />023 <br />NATURE AND REPRESENTS APPROXIMATE <br />LOCATIONS IN OR ON SPACE/ROOM/AREA <br />18.6 OR EQUIPMENT. CONTRACTOR TO VERIFY <br />AFG F1 THE EXACT LOCATION AND COORDINATE <br />IN INV-1 WITH NECESSARY TRADES. <br />VAA t "0 763.559.9100 <br />16 <br />VIA LCP2 SPECIFIC NOTES: <br />2300 Berkshire Lane N, Suite 200 www.vaseng.com <br />Plymouth, MN 55441 <br />WA Firm Registration No. 3035 <br />1 . PROVIDE 277V CONNECTION TO LED <br />NOTICE:THEDESIGN SHOWN AND DESCRIBE) HEREIN INCLUDING ALL MCHNICAL <br />DRAWINGS, DET,1dLS, DEVELOPMENTS, GRAPHICS AND MODELS THEREOF, ARE THE <br />EXCLUSIVE PROPERTY OF VAlk U.C. AND GABE COPIED, DUPLICATED, REPRODUCED <br />DIRECTIONAL SIGNAGE. INTERCONNECT <br />OR COMMERCIALLY EXPLOITED, IN WHOLE OR IN PART, NOCAN ANY DERIVA nVE <br />WORK BE WOE UNLESS EXPRESSLY AUTHORIZED IN WRITING BY VAA, U.C. <br />WITH CONTROL LOCATED AT THE YARD <br />COPYRIGHT VAA, ULC 2M - ALL RIGHTS RESERVED. <br />MARSHALL KIOSK (MODULE 2343), <br />COORDINATE WITH OWNER FOR <br />DWS5 <br />CONTROL OF SIGNS AND ALL REQUIRED <br />INTERCONNECTIONS. <br />6617 ASSOCIATED BLVD. <br />2. RACEWAY AND CONDUCTORS FOR <br />BUILDING B, SUITE 100 <br />EMERGENCY LIGHTS SHALL BE ROUTED <br />F1 SEPERATELY FROM NORMAL LIGHTING <br />EVERETT, WA 98203 <br />LP1A CIRCUITS. THESE CIRCUITS SHALL NOT <br />17.5' <br />36 BE COMBINED OR RUN IN COMMON <br />AFG \/lA I rP9 RACEWAY PER NEC 700.10. <br />0�' <br />----------- -- ---- ---- - - - ------- - ---- - - - — -- <br />Z <br />-Z <br />STIAY CLEAR <br />W <br />Lu <br />1W <br />F1 F1 (n <br />18.5' LP1A LP1A 0 <br />LL <br />AFG 36 36 W I <br />-j <br />AFG AFG5' i� z <br />VIA LCP2 VIA LCP2 Z <br />LP1A <br />< <br />36 <br />VIA LCP2 <br />U— <br />C13) <br />(TYP) <br />...... . ... ..... ...... <br />Branch Panel: LP1A <br />Location: <br />Volts: 480/277 Wye <br />A.I.C. Rating: 65KAIC <br />Supply From: MDS-1 <br />Phases: 3 <br />Mains Type: MCB <br />Mounting: Surface <br />Wires: 4 <br />Mains Rating: 225 A <br />Enclosure: Type 1 <br />MCB Rating: 225 A <br />Notes: <br />CKT <br />Circuit Description <br />Trip <br />Poles <br />A <br />B C <br />Poles <br />Trip <br />Circuit Description <br />CKT <br />1 <br />Lighting - Parking <br />20 A <br />2 <br />1800 VA <br />482 VA <br />1 <br />1 <br />20 A <br />Lighting - Parking Restroorns <br />2 <br />3 <br />1800 VA <br />286 VA <br />1 <br />20 A <br />Lighting - Office <br />4 <br />5 <br />7 <br />Lighting - Office <br />Lighting - Warehouse <br />20 A <br />20 A <br />1 <br />2 <br />983 VA <br />490 VA <br />1022 VA <br />898 VA <br />1 <br />2 <br />20A <br />20 A <br />Lighting - Office <br />Lighting - Warehouse <br />6 <br />8 <br />9 <br />983 VA <br />490 VA <br />10 <br />11 <br />Lighting - Warehouse <br />20 A <br />2 <br />784 VA <br />585 VA <br />1 <br />20 A <br />Lighting - AR Maintenance <br />12 <br />13 <br />6 VA <br />1 <br />20 A <br />Lighting - AR Stations <br />14 <br />15 <br />Lighting - AR Stations <br />20 A <br />1i <br />624 VA <br />507 VA <br />1 <br />20 A <br />Lighting - AR <br />16 <br />17 <br />Lighting - AR Stations <br />20 A <br />1 <br />819VA <br />702 VA <br />1 <br />20A <br />Lighting - AR Stations <br />18 <br />19 <br />Lighting - AR Stations <br />20 A <br />1 <br />624 V�A312 <br />VA <br />1 <br />20 A <br />Lighting - AR <br />20 <br />21 <br />Lighting - AR Stations <br />20 A <br />1 <br />312 VA <br />1 100 VA <br />1 <br />20 A <br />Master Relay Panel <br />22 <br />23 <br />LCP1 & LCP2 <br />20 A <br />1 <br />200 VA <br />343 VA <br />2 <br />20 A <br />Lighting - AR Field <br />24 <br />25 <br />Lighting - AR Field <br />20 A <br />2 <br />343 VA <br />343 VA <br />26 <br />27 <br />343 VA <br />343 VA <br />2 <br />20 A <br />Lighting - AR Field <br />28 <br />29 <br />Lighting -Parking <br />20A <br />30 <br />31 <br />11800 VA <br />� 1539 VA <br />1 <br />20 A <br />Lighting - Exterior <br />32 <br />33 <br />Lighting - Exterior <br />20 A <br />1 <br />652 VA <br />0 VA <br />1 <br />20 A <br />Spare <br />34 <br />35 <br />Spare <br />20A <br />1 <br />0 VA <br />12052 VA <br />1 <br />20 A <br />Canopy Lighting <br />36 <br />37 <br />Canopy Lighting <br />20A <br />1 <br />324 VA <br />0 VA <br />i <br />0 VA <br />1 <br />20 A <br />Spare <br />38 <br />39 <br />Spare <br />20 A <br />1 <br />0 VA <br />1 <br />20 A <br />Spare <br />40 <br />41 <br />Spare <br />20 A <br />1 <br />0 VA <br />1 0 VA <br />I <br />20A <br />Spare <br />42 <br />Total Load: <br />10370 VA j 6440 VA 9548 VA <br />Total Amps: <br />39 A 23A 36 A <br />Legend: <br />Load Classification <br />Connected Load <br />Demand Factor <br />Estimated Demand <br />Panel Totals <br />Lighting <br />12286 VA <br />100.00% <br />12286 VA <br />Lighting <br />- Warehouse <br />13772 VA <br />95.38% <br />13136 VA <br />Total Conn. Load: <br />26058 VA <br />Total Est. Demand: <br />25422 VA <br />Total Conn. Current: <br />31 A <br />Total Est. Demand Current: <br />31 A <br />Notes: <br />PANEL <br />SCHEDULE SHALL SUPERSEDE THE PANEL <br />SCHEDULES <br />FROM THE BUILDING IT PACKAGE. <br />Branch Panel: INV-1 <br />Location: <br />Supply From: MDS-1 <br />Mounting: Surface <br />Enclosure: Type 1 <br />Notes: <br />Volts: 480/277 Wye <br />Phases: 3 <br />Wires: 4 <br />A.I.C. Rating: 65KAIC <br />Mains Type: MCB <br />Mains Rating: 100 A <br />MCB Rating: 30 A <br />CKT <br />Circuit Description <br />Trip <br />Poles <br />A B <br />C <br />Poles <br />Trip <br />Circuit Description <br />CKT <br />1 <br />Lighting -Exit <br />20 A <br />1 <br />.,0 VA 1 900 VA J <br />2 <br />20 A <br />Lighting - EM Parking <br />2 <br />3 <br />Lighting - EM Parking <br />20 A <br />I <br />242VA <br />900 VA <br />1 <br />4 <br />5 <br />Lighting - EM Office <br />20 A <br />1 <br />740 VA i <br />11 VA <br />1 <br />20 A <br />Exterior Egress Lighting <br />6 <br />7 <br />Exterior Egress Lighting <br />20 A <br />1 <br />158 VA 491 VA <br />2 <br />20 A <br />Lighting - Warehouse EM Lights <br />8 <br />9 <br />AR EM Lighting <br />20 A <br />1 <br />78 <br />491 VA <br />10 <br />11 <br />Lighting EM Warehouse <br />20A <br />2 <br />-VA- <br />392 VA <br />0%/A <br />2 <br />20 A <br />Spare <br />12 <br />13 <br />392 VA 0 VA <br />14 <br />15 <br />17 <br />Spare <br />Space & Bus <br />20A <br />1 <br />0 VA <br />324 VA <br />0 VA <br />0 VA <br />1 <br />20 A <br />Canopy Lighting <br />Space & Bus <br />16 <br />18 <br />19 <br />Space & Bus <br />OVA ©-VA <br />Space & Bus <br />20 <br />21 <br />Space & Bus <br />OVA <br />0 VA <br />Space & Bus <br />22 <br />23 <br />25 <br />Space & Bus <br />Space & Bus <br />0 VA 0 VA <br />0 VA <br />0 VA <br />Space & Bus <br />Space & Bus <br />24 <br />26 <br />27 <br />ISpace &- Bus <br />0 VA <br />0 VA <br />Space & Bus <br />28 <br />29 <br />1 Space & Bus <br />0 VA <br />0 VA <br />Space & Bus <br />30 <br />Total Load:1 <br />Total Amps: <br />1991 VA 2035 VA 1249 VA <br />8 A 8 A 5 A <br />Legend: <br />Load Classification <br />Connected <br />Load <br />Demand Factor <br />Estimated Demand <br />Panel Totals <br />Lighting <br />1709 VA <br />100.00% <br />1709 VA <br />Lighting - Warehouse <br />3566 VA <br />100.00% <br />3566 VA <br />Total Conn. Load: <br />5275 VA <br />Total Est. Demand: <br />5275 VA <br />Total Conn. Current: <br />16 A <br />Total Est. Demand Current: <br />6 A <br />Notes: <br />PANEL SCHEDULE SHALL SUPERSEDE THE PANEL <br />SCHEDULES FROM THE BUILDING IT PACKAGE. <br />Branch Panel: RP2A <br />Location: <br />Volts: 120/208 Wye <br />AI.C. Rating: 10KAIC <br />Supply From: (T2) 45 KVA XFMR <br />Phases: 3 <br />Mains Type: MCB <br />Mounting: Surface <br />Wires: 4 <br />Mains Rating: 150 A <br />Enclosure: Type 1 <br />MCB Rating: 150 A <br />Notes: <br />CKT <br />Circuit Description <br />Trip <br />Poles <br />A B <br />C <br />Poles <br />Trip <br />Circuit Description <br />CKT <br />1 <br />Module 2777 Receptacle <br />20 A <br />1 <br />360 VA <br />360VA <br />1 <br />20 A <br />2912 Receptacle <br />2 <br />3 <br />Module 20185 Receptacle <br />20 A <br />1 <br />360 VA <br />360 VA <br />1 <br />20 A <br />Module 21501 Receptacles <br />4 <br />5 <br />Dsp Management Desk <br />20A <br />1 <br />1080 VA <br />+ <br />720 VA <br />1 <br />20 A <br />DSP Device Charging Station <br />6 <br />7 <br />DSP Device Charging Station <br />20 A <br />1 <br />720 VA <br />j 720 VA <br />1 <br />20 A <br />DSP Device Charging Station <br />8 <br />9 <br />CF-06 <br />20 A <br />1 <br />180 VA <br />180 VA <br />1 <br />20A <br />CF-07 & CF-08 <br />10 <br />11 <br />CF-09 <br />20 A <br />1 <br />180 VA <br />180 VA <br />1 <br />20 A <br />CF-1 1 <br />12 <br />13 <br />CF-10 <br />20 A <br />+20 <br />1 <br />180 VA <br />180 VA <br />1 <br />20 A <br />CF-12 <br />14 <br />15 <br />UH-03 <br />A <br />1 <br />360 VA <br />360 VA <br />1 <br />20 A <br />UH-04 <br />16 <br />17 <br />Spare <br />20 A <br />1 <br />OVA <br />360 VA <br />1 <br />20 A <br />UH-06 <br />18 <br />19 <br />AAHX-01 <br />20 A <br />2 <br />374 VA <br />374 VA <br />2 <br />20 A <br />AAHX-02 <br />20 <br />21 <br />374 VA <br />374 VA <br />22 <br />23 <br />AAHX-03 <br />20 A <br />2 <br />374 VA <br />187 VA <br />2 <br />20 A <br />AAHX-04 <br />24 <br />25 <br />374 VA <br />187 VA <br />27 <br />EF-02 <br />20 A <br />1 <br />75 V <br />VA <br />1 <br />20A <br />--26 <br />High Speed Roll -up Door Wireless Controller <br />28 <br />29 <br />EF-03 <br />20 A <br />75 VA <br />100 VA <br />1 <br />20 A <br />High Speed Roll -up Door Wireless Controller <br />30 <br />31 <br />EF-04 <br />20A <br />1 <br />75 VA <br />360 VA 1 <br />1 <br />1 <br />20 A <br />PSCs - Receptacles <br />32 <br />33 <br />360 VA <br />1 <br />20 A <br />PSCs - Receptacles <br />34 <br />35 <br />UH-08 <br />20 A <br />2 <br />1000 VA <br />540 VA <br />1 <br />20 A <br />PSCs - Receptacles <br />36] <br />37 <br />1OOOVA <br />100VA <br />1 <br />20 A <br />Canopy Signage <br />38 <br />39 <br />UH-07 <br />20 A <br />2 <br />1040 VA <br />:j 0 VA <br />1 <br />20 A <br />Spare <br />40 <br />41 <br />1040 VA <br />0 VA <br />1 <br />20A <br />Spare <br />42 <br />Total Load: <br />L 5365 VA 4123 VA 5836 VA <br />Total Amps: <br />46 A 34 A 50 A <br />Legend: <br />Load Classification <br />Connected <br />Load <br />Demand Factor <br />Estimated Demand <br />Panel Totals <br />Motor <br />2844 VA <br />106.58% <br />3032 VA <br />i <br />Power <br />5460 VA <br />100.00% <br />5460 VA <br />Total Conn. Load: <br />115324 VA <br />Receptacle <br />7020 VA <br />100.0)% <br />7020 VA <br />Total Est. Demand: <br />,15512 VA <br />Total Conn. Current: <br />143 A <br />Total Est. Demand Current: <br />143 A <br />Notes: <br />PANEL SCHEDULE SHALL SUPERSEDE THE PANEL <br />SCHEDULES FROM THE BUILDING IT PACKAGE. <br />LIGHTING FIXTURE SCHEDULE <br />SYMBOL <br />DESCRIPTION <br />MFR./ CAT. NO. <br />LAMP TYPE <br />INPUT POWER/VOLT <br />REMARKS/ACCESSORIES <br />LITHIONIA LIGHTING <br />FURNISH AND INSTALL INTEGRAL OCCUPANCY SENSOR <br />EXTERIOR SURFACE MOUNT CANOPY LED <br />CAT, NO. <br />LED <br />108 WATTS <br />VCPG-LED-V4-P6-40K-80CRI-T5W- <br />(277V) <br />F1 <br />I <br />I <br />MVOLT-PM-NLTAIR2-PIRH-DNAXD <br />I <br />I <br />I <br />I I <br />REVISION I <br />I A I DATE <br />ISSUED FOR PERMIT 1 0 109/17/20 <br />SA <br />llt(Llls ?A�121020 <br />Slo) <br />JOB NUMBER <br />205013 <br />DRAWN BY CHECKED BY <br />TJD CTM <br />SHEET TITLE <br />CANOPY FLOOR PLAN - <br />LIGHTING & POWER <br />SHEET NUMBER <br />EO.11. <br />