Laserfiche WebLink
1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO <br />COMMENCEMENT OF WORK AND WILL IMMEDIATELY CONTACT ARCHITECT <br />FOR ANY DISCREPANCIES. <br />2. DO NOT DIMENSION DRAWINGS, CONTACT ARCHITECT OFFICE FOR ANY <br />CLARIFICATIONS. <br />3. ALL DIMENSIONS ARE SHOWN TO FACE OF FRAMING, UNLESS NOTED <br />OTHERWISE (UNO). <br />4. ADA COMPLIANCE PER ICC Al 17.1-2009 <br />5. FIRE EXTINGUISHERS SHALL BE PROVIDED BY CONTRACTOR, QUANTITIES <br />AND LOCATIONS TBD BY FIRE MARSHALL. <br />6. PER WASHINGTON STATE ENERGY CODE, ALL INSULATION MATERIALS TO <br />BE CLEARLY IDENTIFIED AND MARKED W/ LABELING VISIBLE FOR <br />INSPECTION. <br />1) REFER TO REFLECTED CEILING PLAN SHEET A202 FOR LIGHTING SCHEDULE.. <br />2) REFER TO ELEVATIONS FOR ADDITIONAL EXTERIOR LIGHTS. <br />3) ELECTRICAL CONTRACTOR (EC) SHALL COORDINATE EXACT ROUTING OF ALL <br />NEW AND RELOCATED CIRCUITS & FIELD VERIFY EXISTING CONDITIONS. ALL <br />WORK AND WIRING PER NEC INSTALLATION REQUIREMENTS. ALL WORK TO <br />BE CONCEAL: SURFACE MOUNT RACEWAYS ARE NOT PERMITTED. <br />4) RELOCATED DEVICES TO BE ROUTED IN FLEXIBLE METAL CONDUIT. <br />5) PROVIDE ESCUTCHEON PLATES AND SEALANT AT ALL UTILITY <br />PENETRATIONS OF WALLS, CEILING, AND FLOORS. DO NOT USE CAULK OR <br />EXPANDING FOAM SEALANT. <br />6) EC TO PROVIDE J-BOX FOR SIGNAGE BY VENDOR. FINAL CONNECTION TO <br />BUILDING POWER BY EC <br />7) EC TO PROVIDE J-BOX FOR NEW EXTERIOR LIGHT FIXTURE. FINAL <br />CONNECTION TO BUILDING POWER BY EC. <br />8) EXISTING ELECTRICAL PANEL LOCATIONS & NEW CIRCUITS SHALL BE <br />VERIFIED BY EC. EC SHALL COORDINATE & VERIFY FINAL ELECTRICAL WITH <br />LIGHTING AND/OR SIGNAGE SUPPLIERS. <br />9) CONNECT LIGHTING CIRCUITS TO EXISTING LIGHTING CONTROL PANEL. <br />COORDINATE CONTROL SEQUENCE AND TIME OF DAY SCHEDULING WITH <br />FRANCHISEE AND PER WSEC. <br />10) EXISTING ROOFING MEMBRANE TO BE PROTECTED DURING CONSTRUCTION. <br />INCIDENTAL DAMAGE TO BE PATCHED AND REPAIRED ACCORDING TO <br />MANUFACTURER REQUIRED METHOD. <br />Mark I Description <br />O EXISTING AWNINGS / CANOPIES TO BE REMOVED - RETAIN CIRCUITS FOR <br />REUSE - PATCH, REPAIR, AND PREP SURFACES <br />REMOVE EXISTING PYRAMID ROOF, FRAMING & SKIRT, LIGHT FIXTURES <br />AND FRAMING - RETAIN CIRCUITS FOR RE -USE <br />O REMOVE EXISTING AWNING & ATTACHMENT ASSEMBLY - PATCH AND <br />REPAIR SURFACE BELOW, PREP FOR NEW FINISH <br />G) EXISTING ROOF MEMBRANE AND INSULATION TO REMAIN - PATCH AND <br />REPAIR AS NEEDED <br />Mark Description <br />NEW EXTERIOR ROOF MOUNT LIGHT FIXTURE (E-02) - REUSE EXISTING <br />CIRCUIT WHERE POSSIBLE I <br />O NEW EXTERIOR ROOF MOUNT LIGHT FIXTURE (E-01) - REUSE EXISTING <br />CIRCUIT WHERE POSSIBLE <br />NEW DRIVE-THRU CANOPY - VERIFY SIZE WITH VENDOR - REUSE EXISTING <br />CIRCUIT FOR NEW LIGHTING <br />NEW PARAPET WALL FISHING AND METAL COPING TO MATCH EXISTING <br />O VERIFY EXISTING ROOF MEMBRANE BELOW DEMO'D PYRAMID STRUCTURE <br />- PATCH EXISTING OR PROVIDE NEW TO MATCH EXISTING. INSTALL PER <br />MANUFACTURER REQUIRED METHOD <br />NEW LOUVERED AWNING - REFER TO A201 FOR SIZING <br />New Roof Plan <br />r!^ M Aff M All ^1 ^11 ^1 All no ^tv r- r% F_^ r-r% r_^ r 1 ^11 r-^ <br />NORTH <br />Scale: 1/4"=1'-0" ID <br />Mel <br />1 \ <br />V) 0 <br />It <br />0 <br />z <br />0 <br />rn <br />z <br />0 <br />(D <br />o N <br />> <br />(A <br />00 <br />CD N <br />0 IN <br />Z <br />x <br />LU <br />M <br />LL <br />M <br />N <br />t <br />0 N <br />z 00 <br />0 N LO ^ <br />N <br />00 <br />N <br />5506 \ REGISTERED <br />IN ARCHITECT <br />s; 'q <br />A <br />AEI. C. PER <br />STATE OF WASHINGTO <br />VR <br />7& <br />C) <br />C) <br />Uj <br />(D <br />00 <br />0 <br />0 <br />E <br />cu <br />Lo <br />2 <br />W <br />a) <br />00 <br />M <br />:> <br />.CU <br />CIE; <br />E <br />o(D <br />E <br />co <br />ICU <br />C) <br />z Z <br />cn ig <br />z 'n <br />0 - Le z <br />Lu <br />in <br />LL <br />S <br />Job #: <br />2019-17 <br />Drawn: <br />KJH JRS <br />Checked: <br />MCP <br />Issue Date: <br />10.14.2019 <br />Submittal: <br />11.01-2019 <br />W <br />06 <br />z <br />0 <br />W <br />Of <br />Demo Roof Plan <br />New Roof Plan <br />Demo Roof Plan <br />NORTH <br />V-797 I <br />Scale: 1/4"=V-0" 11, i-Y pan, <br />� , I <br />