SPECIALTY PLUMBING FIXTURE SCHEDULE(NOT ALL FIXTURES MAY B
<br />USED)
<br />TAG
<br />FIXTURE
<br />MODEL
<br />DESCRIPTION
<br />NOTES
<br />WHA
<br />WATER HAMMER
<br />SIOUX CHIEF
<br />652-A
<br />CONFORM TO PDI
<br />A
<br />ARRESTOR
<br />WH-201, ASSE 1010;
<br />TEMP TO 250°F, MAX 350
<br />PSIG WORKING
<br />PRESSURE
<br />TMV
<br />TEMPERATURE
<br />WATTS
<br />LFUSG-B-M1
<br />+/- 3°F UP TO 120°F,
<br />MIXING VALVE
<br />WITH BUILT-IN CHECK
<br />VALVES, BRASS BODY,
<br />AND COPPER
<br />THERMOSTAT.
<br />---
<br />TRAP PRIMER
<br />SIOUX CHIEF
<br />695
<br />BRONZE PRIMER VALVE
<br />WITH REMOVABLE
<br />OPERATING PARTS
<br />INTEGRAL VACUUM
<br />BREAKER,AND
<br />GASKETED ACCESS
<br />COVER,
<br />RPZ
<br />REDUCED
<br />WILKINS
<br />975XL
<br />BRONZE BODY, WITH
<br />PRESSURE
<br />SHUT-OFF VALVES,
<br />BACKFLOW
<br />Y STRAINER,
<br />PREVENTER
<br />A 7 C S.
<br />FD
<br />FLOOR DRAIN
<br />SIOUX CHIEF
<br />822-M3PNQ
<br />3" LIGHT DUTY DRAIN
<br />WITH 5 f" SQUARE TOP,
<br />PVC BODY WITH
<br />NICKEL BRONZE RING
<br />AND STRAINER.
<br />PROVIDED WITH 3"
<br />DRAIN AND 1 1/2" VENT.
<br />FFD
<br />FUNNEL FLOOR
<br />SIOUX CHIEF
<br />822-863-
<br />LIGHT DUTY DRAIN
<br />WITH 5 ROUND TOP,
<br />1
<br />DRAIN
<br />FNM3PNR
<br />PVC BODY WITH
<br />B
<br />NICKEL BRONZE RING
<br />AND STRAINER.
<br />PROVIDED WITH 3"
<br />DRAIN AND 1 1/2" VENT.
<br />4" NICKEL -BRONZE
<br />FUNNEL
<br />F
<br />L S
<br />S UX I
<br />861-C
<br />WHITE PVC 12" X 12"
<br />FLOOR SINK WITH 3/4"
<br />HEAVY DUTY PVC HALF
<br />GRATE, SEDIMENT
<br />BUCKET, PVC CLAMPING
<br />COLLAR WITH SCREWS.
<br />PROVIDED WITH 3"
<br />DRAIN
<br />AND 1 112" VENT.
<br />FCO
<br />FLOOR CLEANOUT
<br />SIOUX CHIEF
<br />8
<br />HEAVY-DUTY CASTIRON
<br />B
<br />TOP, POLYPROPYLENE
<br />OR ABS PLUG,
<br />ADJUSTABLE TO
<br />FINISH SURFACE
<br />YCO
<br />YARD CLEANOUT
<br />SIOUX CHIEF
<br />834
<br />DURA-COATED CAST
<br />B
<br />IRON, DOUBLE -FLANGED
<br />HOUSING, AND
<br />HEAVY-DUTY
<br />SCORIATED
<br />DUCTILE IRON COVER.
<br />WCO
<br />WALL CLEANOUT
<br />SIOUX CHIEF
<br />873
<br />THREADED,
<br />COUNTERSUNK BRONZE
<br />CLEANOUT PLUG.
<br />PROVIDE DRILLED TAP
<br />FOR CENTER SCREW
<br />AND STAINLESS
<br />NOTES
<br />STEEL COVER.
<br />B. CLEANOUT SHALL BE SAME SIZE AS PIPE BEING SERVED.
<br />C. THIS SCHEDULE IS COMPREHENSIVE. ALL MARKS MAY OR MAY NOT BE USED ON PLANS.
<br />PLUMBING FIXTURE SCHEDULE (NOT ALL FIXTURE MAY BE USED)
<br />JAQ,F
<br />T
<br />C
<br />C
<br />W
<br />S
<br />FIXTURE AND HARDWARE PROVIDED BY FERGUSON ENTERPRISES,LLC. ATTN:
<br />naspoc@ferguson.com - CONTACT: DEAN ARMSTRONG (949) 289-3058. FIXTURE AND
<br />WC
<br />WATER CLOSET
<br />AMERICAN
<br />MADERA
<br />HARDWARE INSTALLED BY PLUMBING CONTRACTORA 2" ROUGH -IN, COLOR: WHITE
<br />STANDARD
<br />3461.001 (BOWL)
<br />1"
<br />---
<br />4"
<br />2"
<br />AMERICAN STANDARD MADERA OPEN FRONT SEAT, NO COVER. 16-1/2"RIM HEIGHT, FOR
<br />606B.111(FLUSHVAVLE)
<br />HANDICAPPED. HARD WIRED SENSOR OPERATED FLUSH VALVE 1.1 GPF WITH VACUUM
<br />BREAKER. MOUNT CONTROLS ON ACCESSIBLE SIDE OF TOILET. CONTRACTOR TO
<br />COORDINATE WITH FIXTURE SUPPLIER FOR LEFT/RIGHT HAND FLUSH LEVER TO COMPLY
<br />WITH ADA REQUIREMENTS.
<br />TU A D N S L Y M T T
<br />WALL -MOUNT 1231 CONCEALED ARM CARR S WITH CHROME
<br />BRENHAM
<br />T&S MODEL EC-3103-TMV OTION ACTIVATED FAUCET EF-1 ITEM 479 B-0199-03-N05
<br />LAV
<br />LAVATORY
<br />KOHLER
<br />K-1997-4
<br />1/2"
<br />1/2"
<br />1 1/4"
<br />1 1/4"
<br />T INCLUDES AC/DC CONTRO IN EGRAL FLOW
<br />AERATOR( ET'
<br />CONTROL SETTING, T RATURE CONTROL MIXING VALVE SE Q 05°F W/INTEGRAL
<br />CHECK VALVES, 18" 41 ESS STEEL FLEXIBLE HOSES. INST L K LER BRENHAM
<br />SHROUD K-199 HITECTURAL DRAWINGS FOR R EVATIONS.
<br />MS
<br />MOP SINK
<br />FIAT
<br />MSB-2424
<br />1/2"
<br />1!2"
<br />3"
<br />1 1/2"
<br />FIXTURE AND HARDWARE PROVIDED AND INSTALLED BY PLUMBING
<br />CONTRACTOR. NO. 830AA FAUCET WITH INTEGRAL VACUUM BREAKER, NO.832-
<br />AAHOSE AND BRACKET, NO.1453BB FLOOR STRAINER AND NO. 899-CC MOP HANGER
<br />FIXTURE AND HARDWARE OWNER FURNISHED, INSTALLED BY PLUMBING CONTRACTOR.
<br />ADA COMPLIANT, STAINLESS STEEL FIXTURE, BRASS FAUCET & P-TRAP. PROVIDED WITH
<br />S1
<br />HAND SINK
<br />---
<br />---
<br />1/2"
<br />1/2"
<br />1 1/2"
<br />1 112"
<br />STOP VALVES, FLEXIBLE SUPPLY RISERS, TRUBRO LAV GUARD 2 PROTECTIVE PIPE
<br />COVERS ON EXPOSED HOT WATER AND DRAIN LINES AND TEMPERATURE -ACTUATING
<br />FIXTURE AND HARDWARE OWNER FURNISHED, INSTALLED BY PLUMBING
<br />CONTRACTOR, ADA COMPLIANT, CUSTOM WALL MOUNT 10" FRONT TO BACK X 14"W
<br />X 5"D HAND SINK (PRODUCTION LINE. PROVIDED WITH BRASS FAUCET SUPPLIER
<br />S2
<br />HAND SINK
<br />SELECT STAINLESS
<br />PBHS-WO1410-SSLR
<br />1/2"
<br />1/2"
<br />1 112"
<br />1 1/2"
<br />PART #B-1146 & P-TRAP, INSTALL TRUEBRO LAV GUARD 2 PROTECTIVE PIPE COVERS
<br />ON EXPOSED HOT WATER AND DRAIN LINES, STOP VALVES AND TEMPERATURE -
<br />ACTUATING MIXING VALVE & SET TO 105° F.
<br />x1 27, T A 0'7M9 E S
<br />S3
<br />3-COMPARTMENT
<br />TURBO AIR
<br />TSA-3-D1-711
<br />1/2"
<br />1/2"
<br />3"
<br />2"
<br />PLUMBING CONTRACTOR. PROVIDED WITH T&S MODEL MPY8WLN-08CR 8" FAUCET
<br />SINK
<br />(EF-1 ITEM #600), P-TRAP AND STOP VALVES.
<br />FIXTURE AND HARDWARE PROVIDED AND INSTALLED BY PLUMBING CONTRACTOR.
<br />FREEZE -PROOF
<br />BOX TYPE, CAST BRONZE, INTEGRAL VACUUM BREAKER-BACKFLOW PREVENTER, "T"
<br />FPWH
<br />WALL
<br />JOSAM
<br />71000
<br />3/4"
<br />---
<br />---
<br />---
<br />HANDLE, POLISHED FACE, HINGED LOCKING COVER, BRONZE WALL CASTING,
<br />HYDRANT
<br />RENEWABLE SEAT, BRONZE OPERATING PARTS, 1" N.P.T. INLET, AND 3/4" H.P.T. OUTLET.
<br />FIXTURE AND HARDWARE PROVIDED AND INSTALLED BY PLUMBING
<br />CONTRACTOR. CAST BRASS THREADED SILLCOCK WITH FLANGE, CAST IRON HANDWHEEL,
<br />Hg
<br />HOSE BIBB
<br />WATTS
<br />SCS
<br />3/4"
<br />--
<br />--
<br />AND TAMPER -PROOF VACUUM BREAKER. 3/4" N.P.T. INLET, AND 3/4" H.P.T. OUTLET.
<br />PROVIDED WITH 25 FOOT HOSE AND SPRAY GUN. MOUNT 24" AFF.
<br />SEAMLESS MOLDED POLYETHYLENE TANK, 3" FPT INLET / OUTLET WITH 3"X2" FPT
<br />GREASE
<br />FITTINGS, 25 GPM, 10 GALLON LIQUID CAPACITY, 64.9 LBS GREASE CAPACITY,
<br />GI
<br />INTERCEPTOR
<br />SCHIER PRODUCTS
<br />GB1
<br />---
<br />---
<br />3"
<br />---
<br />FACTORY BUILT-IN FLOW CONTROL, INTEGRAL AIR RELIEF / ANTI -SIPHON, ASME
<br />Al12.14.3 AND CSA B481.1 CERTIFIED.
<br />REFERENCE PLUMBING FIXTURE
<br />SCHEDULE FOR CONCEALED
<br />ARM CARRIER TO BE INSTALLED
<br />FOR WALL MOUNTING
<br />LAVATORY, REFER TO 8 & 9/A5.1.
<br />/ / 0 2" -- 3" VTR
<br />/
<br />/ 2" I e \ 2" 3"
<br />1 _
<br />�2"
<br />CONNECT TO I _ I r I WCO \ ( I \ /
<br />EXISTING SAN. N r 3" a 2" / o i�
<br />3" VTR S2 I /
<br />N
<br />i I I I FS FCO A .`
<br />(V
<br />o J1' I I 3„ 3° '
<br />FS 3" 4" / FS
<br />2"
<br />3 3„ FS FS 3" 4" r 2„
<br />I I � II �
<br />3 3" F 4. 3" MS
<br />I� I GI -RE ESS D ®FC U
<br />WC GREASE
<br />II� INTERCEPTOR I 3„ FFD
<br />FD FCO 4" J 3 VTR
<br />A t FCO P FCO
<br />LAV L� t' 4, ��I 4"
<br />U
<br />4" FS 3„ 3
<br />all 3" 4"
<br />2" 4" e
<br />� 1
<br />FCO
<br />4"
<br />IN
<br />r F 2"
<br />S1
<br />SANITARY RISER
<br />D
<br />R
<br />N.T.S.
<br />,-4" SEWER,
<br />FTT
<br />a�I o�
<br />II
<br />I� III
<br />I
<br />I
<br />IBM�
<br />ii
<br />j l0
<br />1. NOTES APPLY TO ALL PLUMBING SHEETS
<br />2. EACH CONTRACTOR IS RESPONSIBLE FOR HAVING
<br />THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />SPECIFICATIONS AS THEY RELATE TO THIS WORK. NO
<br />ADDITIONAL COMPENSATION SHALL BE ALLOWED DUE
<br />TO LACK OF THIS KNOWLEDGE.
<br />ALL MATERIAL 3 PROVIDE A S FOR A COMPLETE
<br />INSTALLATION IN ALL RESPECTS READY FOR INTENDED
<br />USE AND IN STRICT ACCORDANCE WITH STATE AND
<br />LOCAL CODES AND MANUFACTURER'S
<br />RECOMMENDATIONS.
<br />4. COORDINATE SEWER AND WATER CONNECTIONS
<br />WITH CIVIL AND AHJ: PROVIDE PRESSURE REDUCING
<br />VALVE AND BACKFLOW PREVENTER AS SHOWN OR
<br />REQUIRED BY AHJ. VERIFY INVERT AND SLOPE OF
<br />INCOMING SANITARY SEWER BEFORE TRENCHING.
<br />5. REFER TO RISER DIAGRAMS AND PLUMBING
<br />FIXTURE SCHEDULE FOR ALL PIPING AND PIPE SIZES
<br />NOT SHOWN ON PLAN.
<br />6. SANITARY AND STORM SEWER PIPING SHOWN IS
<br />BASED ON 1/4" PER FOOT FALL FOR ALL PIPE SMALLER
<br />THAN 3" DIAMETER AND 1/8" PER FOOT FALL FOR PIPE
<br />3" DIAMETER AND LARGER.
<br />7. ALL SEWER PIPING BELOW SLAB TO BE 2"
<br />DIAMETER MINIMUM.
<br />8. PROVIDE ACCESS DOORS TO ALL CONCEALED
<br />VALVES AND CLEAN -OUTS; AND NOT ABOVE AN
<br />ACCESSIBLE CEILING.
<br />9. PROVIDE TRAP SEAL PRIMERS AND 1/2" COPPER
<br />TUBING CONNECTION TO ALL FLOOR DRAINS AS SHOWN
<br />OR AS REQUIRED BY AHJ. CONTRACTOR SHALL VERIFY
<br />REQUIREMENTS.
<br />10. INSTALL VTR'S, EXHAUST FANS, AND FLUES A
<br />MINIMUM 6-0" FROM PARAPET OR OUTSIDE WALL AND
<br />10'-0" MINIMUM FROM EQUIPMENT WITH OUTSIDE AIR
<br />INTAKE.
<br />11. INSTALL WATER PIPE ON INSIDE OF EXTERIOR
<br />WALL INSULATION TO PREVENT FREEZING.
<br />12. WHEN DEEP FROST LOCATIONS ARE
<br />ENCOUNTERED, ROUTE SANITARY LINES UNDER
<br />BUILDING AS MUCH AS POSSIBLE.
<br />13. PROVIDE PVC SLEEVE FOR ALL COLD/HOT WATER
<br />FLOOR PIPE PENETRATIONS. MAKE SLEEVE LARGE
<br />ENOUGH FOR INSULATION. SEAL WITH GRAY MASTIC
<br />AND ENSURE OF NO WATER PENETRATIONS.
<br />14. PROVIDE AND INSTALL WATTS 8A VACUUM
<br />BREAKER ON ANY THREADED EXTERIOR OR INTERIOR
<br />FAUCETS.
<br />15. ALL WATER SHUT-OFF VALVES SHALL BE "BALL
<br />LOCK TYPE. PROVIDE SHUT-OFF VALVES AT EACH
<br />TERMINATION POINT OF ASSOCIATED EQUIPMENT.
<br />16. PROVIDE SEISMIC BRACING BASED ON
<br />APPROPRIATE SEISMIC ZONE REQUIREMENTS PER
<br />LOCAL AND NATIONAL CODES. CONTRACTOR'S
<br />RESPONSIBILITY INCLUDES STRUCTURAL ENGINEER'S
<br />CERTIFICATION ON DETAILS SUBMITTED FOR
<br />PERMITTING.
<br />PLUMBING SYMBOLS
<br />SS
<br />SANITARY SEWER
<br />GW
<br />GREASE WASTE
<br />GI
<br />GREASE INTERCEPTOR
<br />-------
<br />DOMESTIC COLD WATER
<br />------
<br />DOMESTIC HOT WATER
<br />---
<br />DOMESTIC HOT WATER RETURN
<br />— — FW — —
<br />FILTERED WATER
<br />G
<br />NATURAL GAS
<br />CD
<br />CONDENSATE DRAIN
<br />— — — —
<br />PLUMBING VENT
<br />UNION
<br />--�
<br />�--
<br />C
<br />ELBOW - TURNED DOWN
<br />0 —
<br />ELBOW - TURNED UP
<br />TEE - TURNED DOWN
<br />TEE - TURNED UP
<br />BALL VALVE
<br />161
<br />H�
<br />SHUT-OFF VALVE IN VERTICAL LINE
<br />BACKFLOW PREVENTER
<br />a FD
<br />FLOOR DRAIN
<br />FS
<br />FLOOR SINK
<br />--0 FCO
<br />FLOOR CLEANOUT
<br />—'-0 YCO
<br />YARD CLEANOUT
<br />--+}- FPWH
<br />FREEZE PROOF WALL HYDRANT
<br />--�� HB
<br />HOSE BIBB
<br />---{ ( WCO
<br />WALL CLEANOUT
<br />GAS PRESSURE REGULATOR
<br />----®--
<br />GAS COCK
<br />sevar
<br />DESIGN SOLUTIONS, P.C.
<br />Corporate Office:
<br />3025 Highland Parkway, Suite 850
<br />Downers Grove, IL 60515
<br />Phone: 312.756.7778
<br />info@sevansolutions.com www,sevansolutions.com
<br />Regional Office:
<br />37704 Hills Tech Drive
<br />Farmington Hills, MI 48331
<br />INTEGRITY I RESPECT I TEAMWORK I EXCELLENCE I CHARITY
<br />A REVISIONS
<br />NO. DATE DESCRIPTION
<br />1 11/04/20 OWNER/PEER REVIEW COMMENTS
<br />II CONSULTANT II
<br />Engineers, Inc.
<br />760 Creel Drive
<br />Wood Dale, Illinois 60191
<br />Tel.630/595-8800
<br />Fax 630/595-8818
<br />w'ww, WCWengineers.cem
<br />I I CUSTOMER 11
<br />I I PROJECT DESCRIPTION
<br />' PROJECT '
<br />607 SE EVERETT MAL
<br />WAY
<br />EVERETT, WA • •
<br />SHEET TITLE I I
<br />DRAIN PIPING PLAN
<br />RISER AND
<br />SCHEDULES
<br />SHEET MANAGEMENT
<br />PROJECT NO.: 41564
<br />DATE ISSUED: 08-07-20
<br />DRAWN BY: 1S
<br />REVIEWED BY: 1T
<br />THIS DOCUMENT IS AND SHALL REMAIN THE PROPERTY OF
<br />SEVAN MULTI -SITE SOLUTIONS, INC.
<br />REPRODUCTION OR ALTERATION OF THIS DOCUMENT WITHOUT THE EXPRESSE
<br />WRITTEN PERMISSION OF SEVAN MULTI -SITE SOLUTIONS, INC. IS PROHIBITED.
<br />(NOT PUBLISHED: ALL RIGHTS RESERVED,)
<br />COPYRIGHT BY SEVAN MULTI -SITE SOLUTIONS, INC. 2013
<br />I I SHEET NUMBER I I
<br />cc
<br />W
<br />a
<br />oL
<br />c
<br />UJI
<br />M
<br />Ln
<br />Ln
<br />ui
<br />a
<br />J
<br />m
<br />
|