1. INTRODUCTION <br />1.1 THE CONTRACTING FOR INSTALLATION OF PLUMBING SYSTEMS WILL BE ACCOMPLISHED IN THE <br />FIELD AT THE DIVISION LEVEL (IN CASE OF A CONFLICT BETWEEN THIS SPECIFICATION AND THE CONTRACT <br />DOCUMENTS AND/OR WRITTEN OR VERBAL INSTRUCTIONS PROVIDED BY THE CONSTRUCTION MANAGER, <br />THE DIVISION'S INSTRUCTIONS SMALL PREVAIL). HEREAFTER IN THIS SPECIFICATION, THE WORD "PLUMBING <br />CONTRACTOR" SHALL REFER TO THE INSTALLING PLUMBING CONTRACTOR AND "OWNER" SHALL REFER TO <br />7-ELEVEN. <br />1.2 SCOPE OF WORK <br />1.2.1 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PLUMBING FIXTURES, ACCESSORIES, <br />AND ATTENDANT PIPING AS STATED HEREIN. REFER TO THE PLUMBING PLANS AND THE "MATERIALS" <br />PORTION OF THIS SPECIFICATION FOR EQUIPMENT TO BE FURNISHED. EXACT LOCATION OF ALL EQUIPMENT <br />SHALL BE DETERMINED BY REFERENCE TO THE PLANS AND MEASUREMENTS AT THE BUILDING SITE AND IN <br />COOPERATION WITH OTHER CONTRACTORS AND IN ALL CASES SHALL BE SUBJECT TO THE OWNERS <br />APPROVAL, <br />1.3 GENERAL <br />1.3.1 ALL SAFETY PRECAUTIONS SHALL BE TAKEN TO PROTECT PERSON, PROPERTY, AND <br />EQUIPMENT. <br />`l .3.2 NO COMPENSATION FOR WORK PERFORMED OVER AND ABOVE PROJECTS SUM SHALL BE <br />ALLOWED DUE TO CONDITIONS WITH WHICH THE PLUMBING CONTRACTOR SHOULD HAVE BEEN FAMILIAR. <br />1.3.3 ANY DEVIATION BY PLUMBING CONTRACTOR FROM THE PLANS AND SPECIFICATIONS, OR <br />ANY SUBSTITUTION OF EQUIPMENT FROM THAT SPECIFIED, SHALL FIRST RECEIVE OWNER'S APPROVAL. <br />1.4 OPERATIONS AND INSTALLATION <br />1.4.1 ALL DELIVERIES TO COINCIDE WITH CONSTRUCTION SCHEDULE. MATERIALS SHALL BE <br />STORED WHERE AND/OR AS DIRECTED BY THE GENERAL CONTRACTOR. STORAGE MUST BE IN SUCH A <br />PLACE AS TO AVOID ACCIDENTAL MUTILATION BY EQUIPMENT BY ANY CONTRACTOR WHILE PERFORMING <br />THEIR WORK, WHETHER ON SITE OR OFF. <br />1.4.2 ALL UNDER FLOOR PIPING SHALL BE INSTALLED IN CONJUNCTION WITH THE GENERAL <br />CONTRACTOR'S WORK SCHEDULE. NO UNDERGROUND WORK SHALL BE COVERED OR ENCLOSED UNTIL IT <br />HAS BEEN INSPECTED AND TESTED. <br />1.4.3 PLUMBING CONTRACTOR SHALL DO THE NECESSARY TRENCHING, SHORING AND <br />BACKFILLING REQUIRED TO FULFILL_ HIS CONTRACT, BOTTOMS OF TRENCHES SHALL_ BE CUT TO GRADE. <br />1.4.4 ALL OPENINGS AND STUB -UP FOR PLUMBING PIPING AND FIXTURES SHALL BE CAREFULLY <br />LOCATED AND COORDINATED, OTHERWISE, PLUMBING CONTRACTOR SHALL CUT NEW OPENINGS AT HIS <br />OWN EXPENSE, AND REIMBURSE OTHER SUBCONTRACTORS FOR ANY DAMAGE DONE TO THEIR WORK. <br />1.5 CODE AND PERMIT REQUIREMENTS <br />1.5.1 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL LAWS, <br />REGULATIONS, ORDINANCES, STATUTES, AND CODES, WHICH SHALL BE DELINEATED, AND ALL <br />MODIFICATIONS REQUIRED BY THE INSPECTION AUTHORITIES SHALL BE MADE BY PLUMBING CONTRACTOR <br />WITHOUT ADDITIONAL COST TO OWNER. <br />1.5.2 PLUMBING CONTRACTOR SHALL OBTAIN, PAY FOR AND FURNISH ALL PERMITS REQUIRED BY <br />LOCAL OR STATE ORDINANCES OR CODES, AND THESE COSTS SHALL BE STATED SEPARATELY ON THE <br />PLUMBING CONTRACTOR'S INVOICES, <br />2. MATERIALS <br />2.1 DOMESTIC WATER PIPING <br />2.1.1 ABOVE AND BELOW GRADE WATER PIPING SHALL BE PEX TUBING CONFORMING TO ASTM <br />F877 CROSS -LINKED POLYETHYLENE TUBING HOT AND COLD WATER DISTRIBUTION SYSTEMS, ASTM F876 <br />CROSS -LINKED POLYETHYLENE TUBE, ASTM F1807 FITTING AND ASTM F2159 FITTINGS, COMPLY WITH NSF <br />STANDARD 14 AND 61, AND COMPLY WITH ASTM E84 AND CAN/ULC S102.2. PEX TUBING SHALL BE WATTS <br />WATERPEEX CROSS -LINKED POLYETHYLENE OR EQUAL. ALL PEX TUBING BELOW GRADE SHALL BE SLEEVED <br />WITH PVC PIPE. 2.1.1.1 FITTINGS: FITTINGS SHALL BE MECHANICAL CRIMP FITTINGS IN COMPLIANCE WITH <br />ASTM F1807 AND F2159. PEX FITTINGS SHALL BE WATTS BRASS CRIMPRING FITTINGS USING EITHER WATTS <br />COPPER CRIMPRING OR STAINLESS STEEL CINCHCLAMP OR EQUAL. INSTALLED IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS. <br />2.1.2 ABOVE AND BELOW GRADE WATER PIPING SHALL BE TYPE "L" AND I'M" HARD DRAWN <br />SEAMLESS COPPER TUBING CONFORMING TO ASTM B88. <br />2.1.2.1 COPPER UNIONS: CAST -COPPER -ALLOY, HEXAGONAL -STOCK BODY, WITH BALL-AND- <br />SOCKET, METAL -TO -METAL SEATING SURFACE AND SOLDER -JOINT. JOINING MATERIAL SHALL BE ASTM B813 <br />WATER-FLUSHABLE, LEAD-FREE FLUX ALLOY SOLDER. <br />2.2 FILTERED WATER PIPING <br />2.2.1 ABOVE AND BELOW GRADE FILTERED WATER PIPING SHALL BE CPVC TUBING CONFORMING <br />TO ASTM D2846 AND CSA B137 CHLORINATED POLY (VINYL CHLORIDE) PLASTIC HOT AND COLD WATER <br />DISTRIBUTION SYSTEMS, ASTM D1784 RIGID AND CHLORINATED PVC COMPOUNDS, ASTM F493 SOLVENT <br />CEMENTS, COMPLY WITH NSF STANDARD 14 AND 61, AND COMPLY WITH ASTM E84 AND CAN/ULC S102.2. <br />CPVC TUBING SHALL BE FLOWGUARD GOLD CPVC CTS OR EQUAL. <br />2.2.1.1 FITTINGS: FITTINGS SHALL BE SOCKET TYPE. JOINTS IN COMPLIANCE WITH ASTM <br />D2846 AND CSA B137. CPVC FITTINGS SHALL BE FLOWGUARD GOLD CPVC CTS FITTINGS OR EQUAL. <br />JOINING MATERIAL SHALL BE ASTM F493 SOLVENT CEMENT. INSTALLED IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS. <br />2.3 SOIL_, WASTE AND VENT PIPES <br />2.3.1 ABOVE AND BELOW GRADE: SOIL, WASTE AND VENT PIPING SHALL BE PVC PLASTIC, <br />SCHEDULE 40 DWV PIPE CONFORMING TO ASTM D2665 WITH PLAIN ENDS. CELLULAR (FOAM) CORE PVC NOT <br />ALLOWED. INSTALL PER ASTM D2665 AND ASTM D2321. <br />2.3.1.1 FITTINGS SHALL BE PVC SOCKET -TYPE DWV PIPE FITTINGS; ASTM D2665 MADE TO <br />ASTM D3311 DRAIN, WASTE AND VENT PATTERNS. <br />2.3.2 ABOVE AND BELOW GRADE SOIL, WASTE AND VENT PIPING SHALL BE HUB -AND -SPIGOT CAST- <br />IRON SOIL PIPE AND FITTINGS CONFORMING TO ASTM A74 WITH ASTM C564 RUBBER GASKETS. INSTALL <br />CAST-IRON SOIL PIPING ACCORDING TO CISPI'S "CAST IRON SOIL PIPE AND FITTINGS HANDBOOK." CHAPTER <br />IV, "INSTALLATION OF CAST IRON SOIL PIPE AND FITTINGS." <br />2.3.3 ABOVE GRADE SOIL, WASTE AND VENT PIPING SHALL BE ALLOWED TO BE COPPER DRAINAGE <br />TUBING CONFORMING TO ASTM B306 AT PLUMBING CONTRACTOR'S OPTION. <br />2.4 FLASHING: SHEET LEAD. 4 POUNDS PER SQUARE FOOT, MINIMUM. <br />2.5 INSULATION <br />2.5.1 DOMESTIC COLD WATER (WITHIN BUILDING): <br />COPPER PIPE: 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT <br />EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS <br />VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING <br />INSULATION REQUIREMENTS) <br />PEX TUBING: IN CLIMATES WHERE TEMPERATURES CAN DROP BELOW FREEZING (0°C / <br />32°F) INSTALL 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 <br />WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY <br />CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE_ BELOW FOR PLUMBING FITTING INSULATION <br />REQUIREMENTS). <br />EXCEPTION: FOR NON -RECIRCULATING HOT WATER SYSTEM, PROVIDE 1/2" WALL ONE-PIECE <br />FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH <br />SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR <br />ARMSTRONG ON THE FIRST 8 FEET OF INLET PIPING AT WATER HEATER. <br />CPVC TUBING: IN CLIMATES WHERE TEMPERATURES CAN DROP BELOW FREEZING (0°C / <br />32°F) INSTALL 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 <br />WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY <br />CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION <br />REQUIREMENTS). <br />2.5.2 DOMESTIC HOT WATER: <br />COPPER PIPE: 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT <br />EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS <br />VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING <br />INSULATION REQUIREMENTS) <br />PEX TUBING: 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT <br />EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS <br />VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR ARMSTRONG, (SEE BELOW FOR PLUMBING FITTING <br />INSULATION REQUIREMENTS) <br />FOR HOT WATER PIPING BEING SERVED BY SYSTEM WITH RECIRCULATING PUMP, PROVIDE 1" <br />WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE: <br />RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY <br />CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION <br />REQUIREMENTS) <br />2.5.3 INDIRECT AND CONDENSATE DRAIN PIPING (WITHIN BUILDING): <br />COPPER PIPE: PROVIDE 1" FLEXIBLE UNICELLULAR INSULATION BY ARMACELL. <br />PVC PIPING: NO INSULATION REQUIRED. <br />FOR PIPING AT HANGERS, PROVIDE 8" LONG SECTIONS OF HIGH DENSITY, HIGH TEMPERATURE CALCIUM <br />SILICATE BY JOHNS-MANVILLE, FIBERGLASS BY KNAUF, OR 8" LONG STYROFOAM BILLETS BY DOW. <br />INSULATION SHALL BE CONTINUOUS ALONG THE PIPE SURFACE, EXCEPT AT VALVES, UNIONS, AND WHERE <br />PIPING IS EXPOSED AT FIXTURES. <br />FOR HOT AND COLD WATER PIPING EXPOSED, CONCEALED IN WALLS, AND/OR INSTALLED INSIDE MASONRY <br />UNITS OF WALLS, COVER FITTINGS WITH ZESTON, KNAUF, OR EQUAL ONE-PIECE PVC PREMOL DED <br />INSULATING COVERS. FITTING COVERS, JACKETS AND ADHESIVES SHALL NOT EXCEED FLAME SPREAD <br />RATING OF 25 AND SMOKE DEVELOPMENT RATING OF 50 PER ASTM E84. AT ALL ELBOWS AND TEES, FILL <br />VOIDS BETWEEN COVERS AND PIPING WITH FIBERGLASS INSULATION AND TAPE JOINTS. INSTALL PIPE <br />INSULATION IN COMPLIANCE WITH MANUFACTURER'S RECOMMENDATIONS, WHERE PREMOLDED <br />INSULATING FITTINGS ARE NOT APPROVED BY LOCAL AUTHORITIES, MITER INSULATION AT FITTINGS. <br />2.6 INDIRECT AND CONDENSATE DRAIN LINES: <br />PROVIDE HARD DRAWN, TYPE I'M" OR "L" COPPER PIPE FOR ALL CONDENSATE DRAIN PIPING FROM COOLER <br />AND FREEZER EVAPORATORS. PROVIDE HEAT TRACE FOR ALL CONDENSATE DRAIN PIPING LOCATED IN <br />FREEZERS, AND ROUTE TO FLOOR DRAIN IN BUILDING. <br />PROVIDE PVC PIPE FOR ALL OTHER INDIRECT AND CONDENSATE DRAIN PIPING FROM HVAC, PLUMBING, AND <br />BEVERAGE EQUIPMENT, AND ROUTE TO FLOOR DRAIN IN BUILDING. <br />3. TESTING AND INSPECTION: <br />3.1 THE ENTIRE PLUMBING SYSTEM SHALL BE `VESTED BEFORE COVERING OR ENCLOSING. <br />3.2 INSPECTION: <br />WORK SHALL BE INSPECTED FOR COMPLIANCE WITH CODES, ORDINANCES, REGULATIONS AND ADHERENCE <br />TO CONTRACT DOCUMENTS. PLUMBING CONTRACTOR SHALL SUPPLY OWNER WITH SIGNED FORMS OR <br />PROOF OF ACCEPTANCE BY THE LOCAL AUTHORITY BEFORE CONTINUING FROM ONE STAGE TO ANOTHER. <br />FINAL APPROVAL SHALL BE OBTAINED BEFORE FINAL PAYMENT IS MADE ON THE CONTRACTA <br />3.3 PERFORMANCE REQUIRED: <br />3.3.1 PLUMBING CONTRACTOR SHALL INSTALL ALL PLUMBING SYSTEMS LEAK FREE AND AS <br />PER PLANS AND SPECIFICATIONS. <br />3.3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLED IN A WORKMANLIKE MANNER AND <br />WILL BE SUBJECT TO ARCHITECTURAL INSPECTION FOR AESTHETIC APPEARANCE. <br />4. CUTTING AND CLEANING: <br />4.1 PLUMBING CONTRACTOR SHALL CLEAN ENTIRE SITE OF DEBRIS, TOOLS AND EQUIPMENT <br />RELATED TO THIS WORK. <br />4.2 PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF HIS <br />WORK WHICH MAY BE REQUIRED TO RELIEVE THE WORK OF OTHER CONTRACTORS. <br />5. GUARANTEES: <br />5.1 PLUMBING CONTRACTOR SHALL GUARANTEE ALL OF THE WORK AND THE COMPLETE <br />OPERATION WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. PLUMBING CONTRACTOR <br />AGREES TO REPLACE, WITHOUT EXPENSE TO THE OWNER, ANY PART OF HIS WORK ON THIS INSTALLATION <br />WHICH PROVES TO BE DEFECTIVE WITHIN ONE (1) YEAR AFTER ACCEPTANCE OF THE WORK. <br />REV 03/03/15 <br />r <br />R. Y.a'Y2 <br />k <br />ASSE 1013 COMr <br />CASH ACME RP2 <br />BACKFLOW PRE` <br />DO NOT MOUNT <br />THAN 5-0" <br />3/4" SUPPLY <br />3/4" Y-STR <br />ROUT <br />TO M <br />RECE <br />CPVC BEVERAGE TUBING <br />TAG SLURPEE <br />3/4" REINFORCED PLASTIC LINE TO <br />SLURPEE/LEMONADE ABOVE CEILING, PROVIDE <br />CHECK VALVE CONFORMING TO ASSE 1022 <br />TAG POST MIX <br />3/4" REINFORCED PLASTIC LINE TO <br />POST MIX ABOVE CEILING. PROVIDE CHECK <br />VALVE CONFORMING TO ASSE 1022 <br />1/2" LINE TO ICE MAKER ABOVE CEILING. PROVIDE <br />CHECK VALVE CONFORMING TO ASSE 1022 <br />TAG ICE MAKER <br />-REGULATOR @ ICE MAKER <br />TO < 60 PSI <br />TAG COFFEE <br />3/4" LINE TO COFFEE, TEA, CAPPUCCINO <br />MACHINES. PROVIDE CHECK VALVE <br />CONFORMING TO ASSE 1022 <br />SHUT OFF VALVE (TYP.) <br />AND <br />,HINE. <br />PENTAIR EVERPURE FILTER SYSTEM MODEL <br />COFFEE FILTER LINE: <br />_1' <br />1. WATER SUPPLY MUST BE 3/4" INCH. <br />REQUIREMENTS <br />FOR COFFEE RELATED EQUIPMENT: <br />2. WATER SHUT-OFF VALVE SHALL BE "BALL LOCK" TYPE. POSITIVE ON -OFF. <br />A. <br />%" FILTERED WATERLINE TO COFFEE RELATED EQUIPMENT IS IN THE FOLLOWING ORDER OF <br />CONNECTION: <br />3. DRAIN MUST BE PROVIDED TO PERMIT FLUSHING OF NEW FILTERS, <br />1. <br />MELLTTA BEAN TO CUP <br />2. <br />FRANKE BEAN TO CUP <br />4. WATER FOR ICE MAKERS, COFFEE MAKERS, AND CAPPUCCINO MACHINES SHALL BE ROUTED THROUGH THE SS -IMF UNITS. <br />3. <br />CURTIS CAPPUCCINO <br />5. WATER FOR FSD AND FCB EQUIPMENT SHOULD NOT BE ROUTED THROUGH THE SS -IMF UNITS (WILL REDUCE CARBONATION). <br />4. <br />BUNN NITRO <br />5. <br />BUNN COFFEE BREWERS <br />6. 4FC OR 7FC (CARBON) FILTERS MUST BE REPLACED IN SETS AS REQUIRED BASED ON GALLONAGE. <br />6. <br />LANCER ICED TEA <br />B. <br />FOR LOCATIONS WITH LOWER STATIC OR DYNAMIC PRESSURES, REQUIREMENT IS THE USE OF THE 4FC <br />7. COARSE FILTER AND SS -IMF UNITS MAY BE CHANGED INDIVIDUALLY. <br />FILTER CARTRIDGE OR THE 7FC FILTER CARTRIDGE IN PLACE OF THE XC FILTER CARTRIDGES BASED <br />ON THE GALLONAGE RATE AS STATED BELOW. BOTH FILTERS HAVE EQUAL MICRON RATING WITH MORE <br />8. HONEYWELL PRESSURE REDUCING VALVE MODEL DSO5C1030 (SET AT 55 PSI) INSTALLED AFTER TEE TO SURGE TANK AND <br />GALLONAGE CAPACITIES THAN THE PRESENT XC CARTRIDGES USED IN THE SYSTEM. <br />BEFORE FIRST TEE TO BEVERAGE EQUIPMENT. <br />C, <br />THE 4FC AND 7FC FILTER CARTRIDGES HAVE A HIGHER RATED FLOW RATE THAN THE PRESENT XC FILTER <br />CARTRIDGES WHICH WOULD ALLOW FOR LESSER FILTER PRESSURE DROPS DURING THE SERVICE CYCLE. <br />1. <br />4FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 15,000 GALLONS AT 2.5 GPM. <br />2. <br />7FC FILTER CARTRIDGE RATING IS 0.5 MICRON, 25,000 GALLONS AT 2.5 GPM <br />PURIFICATIONEVERPURE WATER <br />ECOLAB SYSTEM <br />ON SIDE WALL. <br />0 <br />P-TRAP <br />2" W, I - - �, - - � - �- � � mix, m- <br />GREASE TRAP NOTES: <br />• LISTED B IAPMO TO ASME GREASE <br />INTERCEPTOR STANDARD #A112A4.3 <br />AND CSA B481.1. <br />• FACTORY INSTALLED, BUILT-IN FLOW <br />CONTROL. <br />® INTEGRAL AIR RELIEF / ANTI -SIPHON. <br />S3 0 THREE OUTLET OPTIONS FOR EACH <br />ROUGH -IN. UNIT SHIPPED WITH <br />OUTLET DIFFUSER IN OUTLET "B" <br />TWIST HANDLE WASTE <br />DRAIN VALVE SIMILAR TO <br />T&S B-3940, TYP. OF 3 <br />DRAIN 3-COMP SINK <br />INDIRECTLY TO FLOOR <br />SINK WITH AIR GAP <br />PER IECC 2015 SECTION C404.7, P1 RECIRCULATING <br />PUMP CONTROLS SHALL ACTIVATE UPON SENSING <br />HOT WATER DEMAND FROM THE FLOW SENSOR, <br />AND SHALL LIMIT THE TEMPERATURE OF THE WATER <br />ENTERING THE COLD -WATER PIPING TO 104°F. <br />rL`Jv <br />SENSOI <br />HW SUPPLY <br />TO SYSTEM <br />BALL VALVE, T`L <br />SET <br />DISCHARGE <br />TEMPERATURE <br />TO 120°F <br />WATER HEAT <br />N.T.S. <br />I <br />I <br />LO <br />EXPANSION TANK. RE: <br />WATER HEATER SCHEDULE <br />HW <br />RETURN <br />0 i <br />UUM <br />_:LIEF RECIRCULATING <br />'\LVE T PUMP (P1) <br />-- -- - ---� TEMPERATURE <br />SENSOR <br />I 6 � v - - - CW SUPPLY TO <br />� <br />WATER HEATER <br />CHECK <br />VALVE,TYP <br />- FLEXIBLE CONNECTOR TYP <br />® T & P RELIEF <br />WATER <br />HEATER <br />I <br />I <br />GALVANIZED SHEET METAL <br />DRAIN PAN 4" DEEP <br />PIPE FULL SIZE DN TO <br />FUNNEL FLOOR DRAIN <br />WITH AIR GAP <br />1 <br />Corporate Office: <br />25 Highland Parkway, Suite 850 <br />Downers Grove, IL 60515 <br />Phone: 312.756.7778 <br />info@sevansolutions.com www.sevansolutions.corn <br />Regional office: <br />37704 Hills Tech Drive <br />Farmington Hills, MI 4 331 <br />INTEGRITY I RESPECT I TEAMWpRK I EXCELLENCE I CHARITY <br />REVISIONS <br />NO. DATE DESCRIPTION <br />1 11/04/20 OWNER/PEER REVIEW COMMENTS <br />II CONSULTANT II <br />Engineers, Inc. <br />760 Creel Drive <br />'good Cagle, Illinois, GO 194 <br />Tel. 630/59 d-f3800 <br />Fax 63 W59 5-3818 <br />SEAL <br />Wit, <br />V <br />L <br />We 4:,a:. <br />wl <br />ISSUED DATE: 11/04/20 <br />I CUSTOMER I <br />1PROJECT DESCRIPTION11 <br />6 <br />SIB , <br />aIS <br />41564 <br />I I PROJECT LOCATION I I <br />607 SE EVERETT MALL <br />S <br />WA 98208 <br />I I SHEET TITLE I I <br />, HEET MANAGEMENT <br />PROJECT NO.: 41564 <br />DATE ISSUED: ^08-07-20 <br />DRAWN BY: JS <br />REVIEWED BY: JT <br />THIS DOCUMENT IS AND SHALL, REMAIN THE PROPERTY OF <br />SEVAN MULTI -SITE SOLUTIONS, INC. <br />REPRODUCTION OR ALTERATION OF THIS DOCUMENT WI IHOUTTHE EXPRESSEI <br />WRITTEN PERMISSION OFSEVAN MULTI -SITE SOLUTIONS, INC. IS PROHIBITED. <br />(NOTPUBLISHED: ALL RIGHTS RESERVED.) <br />COPYRIGHT BY SEVAN MULTI -SITE SOLUTIONS, INC. 2013 <br />I SHEET DUMBER <br />