Laserfiche WebLink
CITY OF EVERETT <br />EVERETT <br />WASHINGTON <br />Permit Services <br />Construction Stormwater Pollution Prevention Plan (SWPPP) for <br />Single Family Residential / Duplex / Small Projects <br />This Small Project Construction Stormwater Pollution Prevention Plan (SWPPP) provides a simplified <br />template to assist small projects in meeting the City of Everett's erosion and sedimentation control <br />requirements. <br />This template is for projects not triggering a drainage report (installing less than 2000sf of new plus <br />replaced hard surfaces in the separated stormwater basins), as projects that do trigger a drainage report <br />will have a SWPPP section included within the drainage report. <br />Project name: Cypress ADU <br />Project address: 6531 Cyprus St Permit number: PW2109-017 6531 <br />Prepared by: J Jones Date: 10/07/2021 <br />Primary contact name: Primary contact phone: (425) 200-7661 <br />J Jones Primary contact email: jayrefing@hotmaii.com <br />re:48 <br />1�_D) U 12 <br />OCT 15 2021 <br />CITY OF <br />Permit eVERETT <br />I Reserved for City of Everett Public Works Approval Stamp I <br />PUBLIC W01DvS CEPARTMEN!".. <br />By <br />DATE 3 Z�z <br />CITY OF EVER EI T REVIEWED FOR PEkfv i I' <br />Construction Stormwater Pollution Prevention Plan (SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and other pollutants into receiving waters. AConstruction Stormwater Pollution Prevention Plan <br />(Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br />management concerns. Acopy of this SWPPP is requiredto be kept bythecontractor perform i ngthe work at <br />the jobsite for reference and updated during the duration of construction. <br />