Laserfiche WebLink
0 <br />Task 1: Describe the project during construction <br />Nature and purpose of the construction project: <br />ADU on existing lot <br />Adjacent areas, including streams, lakes, wetlands, residential areas, and roadsthat <br />might be affected bythe construction project: <br />none <br />How upstream drainage areas may affect the site: <br />none <br />Downstream drainage leading from the site to a receiving body of water: <br />none <br />Critical areas that receive runoff from the site up to one -quarter mile away: <br />none <br />Special requirements and provisions for working near or within critical areas: <br />nore <br />Areas on the site that have potential erosion problems: <br />none, flat lot <br />Locations where surface water leaves the site: <br />none, drainage is accepted into existing lawn/ planing areas <br />City of Everett Public Works <br />Construction Stormwater Pollution Prevention Plan =2of <br />(SWPPP) Template for Small Projects <br />