Laserfiche WebLink
• I <br /> Element 12.Manage the Project: <br /> ® BM P C1S0:Materials On Hand <br /> ❑ BM PC160:Certified ErosionandSedimentControl Lead <br /> (CESCL not required on-site for sites<lacre) <br /> ❑ BMP C162:Scheduling <br /> ❑Other PertheSWM MWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 13.Protect low impact development: <br /> ❑ BMP C102: BufferZones <br /> ❑ BMP C103:High Visibility Plastic or Metal Fence <br /> ❑ BMP C200:Interceptor Dike and Swale <br /> ❑ BMP C207:CheckDams <br /> ❑ BM P C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> • BMP C233 Silt Fence I <br /> ❑ BMP C 234:Vegetated Strip <br /> ❑OtherPertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control(TESC)plan for your project. <br /> El Show on yourTESC Plan all BM Ps selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> El See City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must be prepared by orunderthe direction of a <br /> Washington State professional licensed engineer. <br /> CITY OF EVERETT <br /> REVIEWED FOR PERMIT <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 6 of 6 <br /> (SWPPP)Template for Small Projects <br />