Laserfiche WebLink
• <br /> • <br /> • <br /> •••,Start'l ere ' . <br /> Does the site have See Redevelopment <br /> 35%ormoxe of . $ Minimum <br /> • • �.edistuig1mpervlous" Requirements and <br /> coverage? Flow Chart <br /> Does the project convert . (Figure 2,4.2) • <br /> • <br /> • ; %acres or more of • . <br /> • • Does the project . vegetation to lawn or <br /> • result in 5,000 • • y landscaped areas,or • <br /> . • square feet,or . No convert 2.5 acres or more • <br /> . greater,of new plus, of native vegetation to ' <br /> .. :replaced.hard. .. , . .• • . ..pasture? . . '. <br /> surface area? • <br /> Does the project ' <br /> s • No result in 2,090 square <br /> . • • • 'feet,or greater;of <br /> v new plus replaced . <br /> '111 4inimurn• - .yhard-surface area? • <br /> Requirements apply , <br /> to the new and <br /> replaced hard surfaces ' • • cm) • <br /> _ <br /> aii converted • <br /> • • vegetation areas. <br /> Minimum Requirements Does the project have <br /> • • #1 through#5 apply to land disturbing • • <br /> •• the new and replaced activities of 7,000 <br /> • hard surfaces and the Yes square feet or•greater? • • <br /> • land disturbed.. <br /> No <br /> • <br /> • <br /> Minimum <br /> ' • , • •• Requirement#2 • <br /> • amines... • •• <br /> ,•iguie .4:9 .Flow Chart1or Determining Requirements for'Neyi►Development ' <br /> • <br /> •• • Volume X—Minimum Technical Requirements•,�December 2014 - <br /> 2-5 <br /> . <br />