My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4909 NARBECK RD 2023-06-22
>
Address Records
>
NARBECK RD
>
4909
>
4909 NARBECK RD 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 11:35:58 AM
Creation date
10/28/2022 2:30:13 PM
Metadata
Fields
Template:
Address Document
Street Name
NARBECK RD
Street Number
4909
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC LID BMP <br /> T5.13: Post Construction Soil Quality and Depth <br /> This section applies to lawn and landscape areas. <br /> On your site plan,show the edge of all ground and vegetation that will be disturbed by the project. <br /> 1. Total Disturbed Area: 14374.8 ft 2 <br /> (Should match line I on the Stormwater project,page 2) <br /> 2. Onsite hard surfaces: 4190 ft 2 <br /> (Should match line 5 on the Stormwater project information,page 2): <br /> 3. Area of lawn or turf: 10,184.8 ft 2 <br /> 4. Area of landscaping and planting beds: 0 ft 2 <br /> 5. Areas exempted from soil amendment requirements: 0 ft 2 <br /> (Due to existing tree roots,steep slopes,or wetland soils) <br /> 6. CHECK:The total of lines 2 through 5 should equal line 1. 14,374.8 = 14,374.8 <br /> Calculate the Amendment Amount Needed <br /> TURF/LAWN AREA <br /> 7. Area of lawn or turf(from line 3 above) 10,184.8 ft 2 <br /> Multiply by conversion factor from 1.75 inches to cubic yards (yd 3): x 0.0054 <br /> 8. Amendment quantity needed for lawn or turf 55 yd <br /> 9. Area of landscaping and planting beds (from line 4 above) _ 0 ft 2 <br /> a. Multiply by conversion factor from 3 inches to cubic yards (yd 3): x 0.0093 <br /> 10. Amendment quantity needed for landscaping/planting beds 0 yd 3 <br /> 11. TOTAL AMENDMENT QUANTITY NEEDED <br /> (total of lines 8 and 10) 55 + 0 = __ 55 yd 3 <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.