Laserfiche WebLink
SOURCES:Portion of total amendment quantity (from line 11)that is: <br /> 12. Purchased from off-site sources 100 % <br /> 13. Stockpiled soil and duff from on-site <br /> 14. Chipped and stockpiled woody material from on-site <br /> 15. Imported topsoil <br /> 16. CHECK:_The total of lines 12 through 15 should total 100% 100°(0__ <br /> PLANTING BEDS <br /> 17. Area of landscaping and planting beds (from line 4 above) 0 _ft 2 <br /> a. Multiply by conversion factor from 3 inches to cubic yards (yd 3): x 0.0093 <br /> 18. MULCH QUANTITY NEEDED 0 yd3 <br /> SOURCES:Portion of total mulch quantity(from line 18)that is: <br /> 19. Purchased from off-site sources 0 <br /> 20. Chipped and stockpiled woody material from on-site 0 <br /> 21. CHECK:The total of lines 19 and 20 should total 100°% 100% <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 43 <br />