Laserfiche WebLink
The soils on the site are Alderwood series (5)per the SCS Soil Map and a soil <br /> investigation by Cobalt GeoSciences found the soils to be infeasible for the use of total <br /> infiltration for the disposal of storm runoff. <br /> Infiltration and Dispersion cannot be implemented based on the Geotechnical Report <br /> submitted by Cobalt Geosciences, LLC. <br /> There is a storm drain in the area so a direct connection is practical. <br /> Erosion Control can be provided by a construction entrance and silt fence around the <br /> north and west sides of the property. <br /> Section 3 Site Development <br /> The site was visited on March 1,2017. The downstream drainage system was field. <br /> verified and the drainage patterns and ground cover were observed. The site consists of a <br /> vacant lot with grass,brush, ivy and few trees. The site slopes down to the southwest at • <br /> 20%to 40%. To the north is Darlington Beach. To the Southeast is Narbeck Ave., <br /> which has drainage, curbs and gutters and slopes down to the northeast. There is a SFR <br /> to the west which does not appear to drain any significant amount of water onto the <br /> property. To the west is Narbeck Rd that does not appear to drain onto the site. The site <br /> slopes down to the southeast. <br /> The site will be developed with a new 1,910sf Single Family Residence and a1,697sf <br /> driveway, sidewalk and porch for a total impervious area of 3,607sf or 25.10%. See site <br /> plan. <br /> A quarter mile downstream inspection was performed. The inspection concluded no <br /> visual impacts or potential problems will occur from the development of the subject site. <br /> The downstream course consists of sloping roadways (+/-20% )wooded hillsides and <br /> Narbeck creek approximately 250 ft from the site. <br /> The driveway and roof downspouts will be routed to the existing drainage ditch which <br /> will drain into the existing catch basin along W Mukilteo Blvd in between Narbeck rd <br /> and Narbeck Ave. The driveway will be sloped 15%to flow toward Narbeck Rd. This is <br /> the only practical method of storm water control as the site is not suitable for either <br /> dispersion or infiltration per the Geotechnical Report see attached at end of report. <br /> Section 4 Stormwater Pollution Prevention Plan <br /> The site does not require any special stormwater pollution prevention. See SPPP. <br /> Section 5 Source Control of Pollution <br /> Due to the small size of this project and residential nature of this project no <br /> significant amount of Pollution will be generated. <br /> The roof downspouts will be connected to the existing roadside ditch with a 6" <br /> PVC pipe. The ditch drains to the existing catch basin along W Mukilteo Blvd in between <br /> Narbeck Road and Narbeck Ave. <br /> Section 6 Special Reports and Studies <br /> No special reports or studies are available on this site. <br /> A Geotechnical report has been submitted by Cobalt Geosciences, LLC. See <br /> attached. <br /> r)2/ AE2018-97 <br />