My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1029 52ND ST SW 2022-10-31
>
Address Records
>
52ND ST SW
>
1029
>
1029 52ND ST SW 2022-10-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 12:12:26 PM
Creation date
10/31/2022 12:01:23 PM
Metadata
Fields
Template:
Address Document
Street Name
52ND ST SW
Street Number
1029
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. SWPPP NARRATIVE (MR #2) <br /> The intent of this section is to provide the information necessary to support the <br /> engineering plans to implement a design that will; reduce, eliminate or prevent the <br /> discharge of stormwater pollutants, meet or exceed the water quality and sediment <br /> management standards for the City and State, and prevent adverse impacts to the <br /> receiving waters for this project. Note; this narrative is intended to support the SWPPP <br /> that is included with the Targeted Drainage Plans also a part of this submittal package to <br /> the City. <br /> A. SITE!GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.55 acres <br /> Average slope for the short plat: 10% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Moderate <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the short plat to be disturbed <br /> is moderate and construction site runoff will pass through silt fencing or other perimeter <br /> filtration features prior to leaving the short plat, and that if site conditions warrant, <br /> additional BMP's can be implemented as corrective measures the Risk Category for this <br /> site is Low-Moderate Risk. <br /> B.-SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the.construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP.C1.0.3) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the proposed short plat. 0.55 acres of the site and <br /> frontage R/W will be cleared or disturbed for this project. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance(BMP C105) to be installed as <br /> the second step after the staking of clearing limits. The construction entrance for this <br /> project will be along the southern property line in the back of Lot 4 and just east of Lot 3. <br /> At`this°utime winter work is-expected.Auring the wet season. <br /> 3: Control Flow Rates <br /> The runoff from site will be collected in interceptor swales and directed to a sediment trap <br /> that will discharge into the existing ditch system along the east side of this property and <br /> the west side of 51 st PI SW. <br /> Seatiursf 18-0727'SP Page 8 <br /> September 2019 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.