My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Inc. 11/3/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Inc. 11/3/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:50 AM
Creation date
11/10/2022 10:24:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Inc.
Approval Date
11/3/2022
Council Approval Date
2/3/2021
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th ST Detailed Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002775
Total Compensation
$2,814,996.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Jacobs Engineering Group Inc. 2/8/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Identify preferences for shelter requirements. <br /> Mechanical and Odor Control <br /> o Develop plans and equipment selection for mechanical components: <br /> • Basin drain pumps <br /> • Gates <br /> • Tipping buckets <br /> • Utility water system <br /> • Odor control System <br /> - Fan <br /> - Mist eliminator <br /> - Odor Control Vessel <br /> - Silencer <br /> - Discharge stack <br /> o Develop equipment list. <br /> o Prepare fan and pump sizing calculations. <br /> Electrical <br /> o Utility coordination with Snohomish PUD. <br /> o Develop one-line diagram. <br /> o Develop equipment layout schematic. <br /> o Identify specifications required. <br /> l&C <br /> o Develop preliminary P&IDs. <br /> o Develop preliminary Instrument and I/O list. <br /> o Identify specifications required. <br /> Deliverables.The following deliverables are included. <br /> 1. 30% Design Technical Memorandum—1 electronic file(PDF). <br /> 2. 30% Design Drawings—1 electronic file (PDF). <br /> 3. 30% Design Specifications (index only)—1 electronic file (PDF). <br /> 4. Updated Preliminary Engineering Report. <br /> 5. Review Comment Responses—1 electronic file (PDF). <br /> 6. Excavation quantity-take-off to support SEPA checklist preparation by the City. <br /> 7. Updated Model files. <br /> Subtask 2410P—Pacific Avenue (30%) <br /> Assumptions: <br /> • Pipeline will primarily be installed in the northern half of Pacific Avenue. <br /> April 2022 Page 18 of 35 Jacobs Engineering Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.