Laserfiche WebLink
o Identify preferences for shelter requirements. <br /> Mechanical and Odor Control <br /> o Develop plans and equipment selection for mechanical components: <br /> • Basin drain pumps <br /> • Gates <br /> • Tipping buckets <br /> • Utility water system <br /> • Odor control System <br /> - Fan <br /> - Mist eliminator <br /> - Odor Control Vessel <br /> - Silencer <br /> - Discharge stack <br /> o Develop equipment list. <br /> o Prepare fan and pump sizing calculations. <br /> Electrical <br /> o Utility coordination with Snohomish PUD. <br /> o Develop one-line diagram. <br /> o Develop equipment layout schematic. <br /> o Identify specifications required. <br /> l&C <br /> o Develop preliminary P&IDs. <br /> o Develop preliminary Instrument and I/O list. <br /> o Identify specifications required. <br /> Deliverables.The following deliverables are included. <br /> 1. 30% Design Technical Memorandum—1 electronic file(PDF). <br /> 2. 30% Design Drawings—1 electronic file (PDF). <br /> 3. 30% Design Specifications (index only)—1 electronic file (PDF). <br /> 4. Updated Preliminary Engineering Report. <br /> 5. Review Comment Responses—1 electronic file (PDF). <br /> 6. Excavation quantity-take-off to support SEPA checklist preparation by the City. <br /> 7. Updated Model files. <br /> Subtask 2410P—Pacific Avenue (30%) <br /> Assumptions: <br /> • Pipeline will primarily be installed in the northern half of Pacific Avenue. <br /> April 2022 Page 18 of 35 Jacobs Engineering Group <br />