Laserfiche WebLink
• Meetings in this task will be attended by up to 7 Consultant staff. Labor effort will include 4 <br /> hours per person per meeting for periodic review workshops and 6 hours per technical <br /> coordination meetings for preparation, attendance, and summary activities. <br /> Activities: <br /> Client Meetings.The Consultant will prepare for and attend technical coordination meetings with the <br /> City during the detailed design activities.The Consultant will prepare for and attend workshops to <br /> review the design progress, receive feedback, and provide responses.The Consultant will prepare and <br /> distribute meeting summaries. Budget for this task is based on two-hour meetings to discuss design <br /> issues and design review comments. <br /> Outside Agencies. Meetings with outside agencies (utilities or regulatory), as requested by the City,will <br /> be covered under Task 2900, Supplemental Services. However,this does not include meetings with <br /> utilities to gather"as-built" information and utility design criteria,which will be covered under design <br /> tasks. <br /> Deliverables: <br /> 1. Design Meeting agendas and meeting notes—electronic files (PDF). <br /> Task 2200—Survey& Mapping Services <br /> This task covers detailed engineering survey for the approximately 3.5 acre CSO storage site adjacent to <br /> 36th Street, refer to Exhibit Map 1,and approximately 1,500 lineal foot pipeline corridor along Pacific <br /> Ave, refer to Exhibit Map 2.Jacobs intends to contract with Metron and Associates, Inc (Subconsultant) <br /> to perform field survey activities. <br /> April 2022 Page 6 of 35 Jacobs Engineering Group <br />