My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Inc. 11/3/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Inc. 11/3/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:50 AM
Creation date
11/10/2022 10:24:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Inc.
Approval Date
11/3/2022
Council Approval Date
2/3/2021
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th ST Detailed Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002775
Total Compensation
$2,814,996.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Jacobs Engineering Group Inc. 2/8/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Meetings in this task will be attended by up to 7 Consultant staff. Labor effort will include 4 <br /> hours per person per meeting for periodic review workshops and 6 hours per technical <br /> coordination meetings for preparation, attendance, and summary activities. <br /> Activities: <br /> Client Meetings.The Consultant will prepare for and attend technical coordination meetings with the <br /> City during the detailed design activities.The Consultant will prepare for and attend workshops to <br /> review the design progress, receive feedback, and provide responses.The Consultant will prepare and <br /> distribute meeting summaries. Budget for this task is based on two-hour meetings to discuss design <br /> issues and design review comments. <br /> Outside Agencies. Meetings with outside agencies (utilities or regulatory), as requested by the City,will <br /> be covered under Task 2900, Supplemental Services. However,this does not include meetings with <br /> utilities to gather"as-built" information and utility design criteria,which will be covered under design <br /> tasks. <br /> Deliverables: <br /> 1. Design Meeting agendas and meeting notes—electronic files (PDF). <br /> Task 2200—Survey& Mapping Services <br /> This task covers detailed engineering survey for the approximately 3.5 acre CSO storage site adjacent to <br /> 36th Street, refer to Exhibit Map 1,and approximately 1,500 lineal foot pipeline corridor along Pacific <br /> Ave, refer to Exhibit Map 2.Jacobs intends to contract with Metron and Associates, Inc (Subconsultant) <br /> to perform field survey activities. <br /> April 2022 Page 6 of 35 Jacobs Engineering Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.