My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 100TH CT SE 2024-03-08
>
Address Records
>
100TH CT SE
>
1202
>
1202 100TH CT SE 2024-03-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2024 2:55:06 PM
Creation date
11/17/2022 3:33:42 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH CT SE
Street Number
1202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section IV. Description of Permitted Units, Scope of the Permit, and Authorized <br /> Activities <br /> The Permittee is authorized to conduct the following activities during the specified times <br /> at municipal solid waste landfill(MSWLF)units as described below: <br /> a. i. MSWLF Unit Name/Description: 1-43 (entire 915 acre footprint) <br /> ii. Rule applying to this unit: 173-304 X 173-351 <br /> iii. Types of wastes authorized in this unit: <br /> MSW,industrial,commercial, other as approved by Klickitat County <br /> Health Department. <br /> iv. Authorized design volume:244,600,000 vd' <br /> v. Earliest authorized start of activity: upon permit issuance <br /> vi. Latest authorized completion date: December 31,2100 <br /> Section V. Pre-construction,Pre-operational,Pre-closure Review,and Cessation of <br /> Construction or Operation Activities. <br /> 1. For each new or laterally expanded unit, the permittee shall submit final design <br /> drawings, construction specifications and construction quality assurance manual <br /> at least 60 days prior to the beginning construction date specified in Section IV. <br /> The permittee shall not begin lines construction until the jurisdictional health <br /> department approves these documents in writing. <br /> 2. The permittee is authorized to accept solid waste at any new or laterally expanded <br /> unit, only after a licensed engineer, having supervised construction, certifies that <br /> the construction is in accordance with this permit and in accordance with the <br /> construction quality assurance plans. The operator must notify the jurisdictional <br /> health department in writing of the date when solid waste will be first received at <br /> the unit. The permittee shall not accept authorized solid waste until approved in <br /> writing by the jurisdictional health department. <br /> 3. One hundred and eighty(180)days prior to beginning closure activities,specified <br /> in Section IV, the permittee shall notify the jurisdictional health department and <br /> the financial assurance trustee and/or insurer of the intent to close each unit or all <br /> units according to the approved closure plan, and submit final engineering closure <br /> plans to the jurisdictional health department for review, comments, and approval. <br /> Closure activities shall not begin until approval in writing from the jurisdictional <br /> health department for closure has been received. <br /> 4. If construction or operation activities started under a permit issued pursuant to this <br /> chapter cease for a period of twelve consecutive months,the jurisdictional health <br /> department at its discretion revoke the permit. The jurisdictional health <br /> department shall provide notice to the owner or operator in writing explaining the <br /> reasons for revocation. The jurisdictional health department shall not revoke a <br /> permit where the cessation of construction or operation is caused by factors <br />
The URL can be used to link to this page
Your browser does not support the video tag.