Laserfiche WebLink
Element 3.Control flow rates: <br /> .� ❑ BMP C203:Water Bars <br /> Tr ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24I:Temporary Sediment Pond <br /> 0 Other Per the SWMMWW: <br /> plot applicable to my proposed project <br /> Explain: <br /> Element 4.Install sediment controls: <br /> ❑ BMP C23 I:Brush Barrier <br /> ❑ BMP C232:Gravel Filter Berm <br /> ❑ BMP C233:Silt Fence <br /> )423MP C234:Vegetated Strip <br /> ❑ BMP C235:Wattles <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C24 I:Temporary Sediment Pond <br /> ❑Other Per the SWMMWW: <br /> i ot applicable to my proposed project <br /> xplain: <br /> Element 5.Stabilize soils: <br /> ❑ BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 121:Mulching <br /> ❑ BMP C 122:Nets and Blankets <br /> ❑ BMP C 123:Plastic Covering <br /> \►',t:MP C 124:Sodding <br /> ❑ BMP C 125:Topsoiling/Composting <br /> ❑ BMP C 126:Polyacrylamide for Soil Erosion Protection <br /> ❑ BMP C 130:Surface Roughening <br /> ❑ BMP C 13 I:Gradient Terraces <br /> ❑ Other PertheSWMMWW: <br /> ot applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 11 <br /> the Combined Sewer Area-April 2021 <br />