Laserfiche WebLink
Element 6.Protect slopes: <br /> ❑ BMP C 120:Temporary and Permanent Seeding <br /> ❑ BMP C 130: Surface Roughening <br /> ❑ BMP C 13 1: GradientTerraces <br /> ❑ BMP C200:Interceptor Dike and Swale <br /> ❑ BMP C20 I: Grass-Lined Channels <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C204:Pipe Slope Drains <br /> ❑ BMP C205:Subsurface Drains <br /> ❑ BMP C206: Level Spreader <br /> ❑ BMP C207: Check Dams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑Other Per the SWMMWW: <br /> of applicable to my proposed project <br /> Explain: <br /> .?; Element 7.Protect drain inlets: <br /> ❑ BMP C220:Storm Drain Inlet Protection <br /> ❑Other PertheSWMMWW: <br /> pot applicable to my proposed project <br /> Explain: <br /> Element 8.Stabilize Channels and Outlets: <br /> ❑ BMP C202: Channel Lining <br /> ❑ BMP C 209:Outlet Protection <br /> ❑ Other PertheSWMMWW: <br /> of applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 12 <br /> the Combined Sewer Area April 2021 <br />