Laserfiche WebLink
Element 9.Control pollutants: <br /> ❑ BMP C 15 I: Concrete Handling <br /> ❑ BMP C 152:Sawcutting and Surfacing Pollution Prevention <br /> ❑ BMP C 153:Material Delivery,Storage,.and.Containment <br /> 0 BMP C 154:Concrete Washout Area <br /> ❑ BMP C250:Concrete Stormwater Chemical Treatment <br /> ❑ BMP C25 I:Construction Stormwater Filtration <br /> y ❑ BMP C252:High pH Neutralization Using CO2 <br /> ❑ BMP C253:pH Control for High.pH_Water <br /> ❑Other PertheSWMMWW: <br /> )0Iot applicable to my proposed project <br /> Explain: <br /> Element 10.Control dewatering: <br /> BMP C236:Vegetative Filtration <br /> ❑Other Per theSWMMWW <br /> ,._ <br /> 1 \ of applicable to my proposed project <br /> xplain: <br /> Element 11.Maintain BMPs: <br /> ❑ BMP C 150:Materials Qn Hand <br /> .? 0 BMPC 160:Certified Erosion and Sediment Control Lead <br /> (CESCL not required on-site for<I acre). <br /> 0 Other PertheSWMMWW: <br /> p•lot <br /> applicable to my proposed project <br /> Explain: <br /> Element 12.Manage the Project: <br /> ❑ BMP C 150:Materials On Hand <br /> 0 BMPC 160:Certified Erosion and SedimentControl Lead <br /> (3. <br /> (CESCL not required on-site for sites<I acre) <br /> ❑ BMP C 162:Scheduling <br /> ❑Other Per the SWMMWW: <br /> lot applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 13 <br /> the Combined Sewer Area-April 2021 <br />