My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
518 E BEECH ST 2025-06-09
>
Address Records
>
E BEECH ST
>
518
>
518 E BEECH ST 2025-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 1:50:36 PM
Creation date
11/29/2022 9:37:38 AM
Metadata
Fields
Template:
Address Document
Street Name
E BEECH ST
Street Number
518
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC LID BMP <br />T5.13: Post Construction Soil Quality and Depth <br />This section applies to lawn and landscape areas. <br />On your site plan, show the edge of all ground and vegetation that will be disturbed by the project. <br />1. Total Disturbed Area: ...................................................................................... 8,939--- ft2 <br />(Should match line 1 on the Stormwater project, page 2) <br />2. Onsite hard surfaces: ....................................................................................4836 <br />----- <br />ft2 <br />(Should match line 5 on the Stormwater project information, page 2): <br />3. Area of lawn or turf: ....................................................................................... <br />4,103--- <br />ft2 <br />4. Area of landscaping and planting beds: ............................................................. <br />0-------- <br />ft2 <br />5. Areas exempted from soil amendment requirements: .......................................... <br />0-------- <br />ft2 <br />(Due to existing tree roots, steep slopes, or wetland soils) <br />6. CHECK: The total of lines 2 through 5 should equal line 1. 8,939 = 8,939 <br />Calculate the Amendment Amount Needed <br />TURF/LAWN AREA <br />7. Area of lawn or turf (from line 3 above)........................................................... 580------ ft2 <br />Multiply by conversion factor from 1.75 inches to cubic yards (yd3): x 0.0054 <br />8. Amendment quantity needed for lawn or turf .................................................... 5.5------- yd3 <br />9. Area of landscaping and planting beds (from line 4 above) ................................. 3155 ft2 <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />10. Amendment quantity needed for landscaping/planting beds ............................... 88------- yd3 <br />11. TOTAL AMENDMENT QUANTITY NEEDED <br />(total of lines 8 and 10) 5.5 + 88 - 93.5 ___ yd3 <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.