My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
518 E BEECH ST 2025-06-09
>
Address Records
>
E BEECH ST
>
518
>
518 E BEECH ST 2025-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 1:50:36 PM
Creation date
11/29/2022 9:37:38 AM
Metadata
Fields
Template:
Address Document
Street Name
E BEECH ST
Street Number
518
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOURCES: Portion of total amendment quantity (from line 11) that is: <br />12. Purchased from off -site sources.....................................................................---_____ % <br />13. Stockpiled soil and duff from on-site................................................................ 100 ----- Rio <br />14. Chipped and stockpiled woody material from on -site ........................................... % <br />15. Imported topsoil..........................................................................................-------- % <br />16. CHECK: The total of lines 12 through 15 should total 100% Checked 100% <br />PLANTING BEDS <br />17. Area of landscaping and planting beds (from line 4 above) .................................... ----------- ft2 <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />18. MULCH QUANTITY NEEDED.............................................................................------------- yd3 <br />SOURCES: Portion of total mulch quantity (from line 18) that is: <br />19. Purchased from off -site sources............................................................................---------- % <br />20. Chipped and stockpiled woody material from on -site .............................................. _--------- % <br />21. CHECK: The total of lines 19 and 20 should total 100%......................................... 100% <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.