My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
220 OLYMPIC BLVD 2021 VA OUTPATIENT CLINIC Plans 2022-12-15
>
Address Records
>
OLYMPIC BLVD
>
220
>
VA OUTPATIENT CLINIC
>
Plans
>
220 OLYMPIC BLVD 2021 VA OUTPATIENT CLINIC Plans 2022-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 9:18:09 AM
Creation date
12/15/2022 9:09:02 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
220
Tenant Name
VA OUTPATIENT CLINIC
Permit
M2101-027
Year
2021
Notes
MECH FOR NEW VA OUTPATIENT CLINIC
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 Revised Dec 2019 <br />General Info Project <br />Title: 120019 VA CBOC Everett WA — - - Date 12/11/2020 <br />PROD -SUM form shall Project Street Address: 220 Olympic Blvd For Building Department Use <br />be provided as a Project City, County, Zip: Everett, Snohomish County, 98203 <br />cover sheet for all <br />_ <br />compliance form Project Owner or Rep: Roth Sheppard Architects, LLP (303) 534-7007 <br />submittals. Project <br />Title shall match Jurisdiction: City of Everett Building Department <br />project plans title _ _ __— <br />block. <br />Project Description <br />New Construction and Additions <br />Select ag that apply to the <br />New Building Building Addition <br />scope of project. <br />Select Addition + Existing or <br />Existing Building Retrofit <br />Alteration + Existing if the <br />existing building will be <br />Alteration Change of Occupancy Change in Space Conditioning <br />combined with the addition <br />or alteration to demonstrate <br />compliance per Section <br />Historic Building <br />C502.1 or C503.1. <br />Building Elements Scope - Select all that apply <br />All ® Building Envelope Mechanical Systems <br />Service Hot Water Systems R1 Lighting Systems ® Electrical Systems <br />D All Commercial 0 Group R - R2, R3, & R4 0 Mixed Use <br />over 3 stories and all R1 <br />Occupancy Type <br />Mixed Use - Building is greater than three stories above grade and 4 has both Commercial and Group R <br />occupancies. <br />Mixed Occupancy - Building is three stories or less above grade and it has both Commercial and Group <br />RZ R3 or R4 occupancies, Select All Commercial to document compliance for the commercial areas of <br />the building. The residential spaces shall comply with the WSEC Residential Provisions. <br />Select all that apply to the scope of project <br />Fully Conditioned FA/ Semi-heated2 Refrigerated Spaces <br />(Warehouse and/or Walk-in') <br />Low Energy Space Category3 <br />Space Conditioning® <br />Eligible Low Energy Spaces <br />Categories <br />Unconditioned Low energy heating/cooling capacity <br />Wireless service Greenhouse4 [ Equipment building <br />equipment shelter <br />- - --- - <br />Floor Area aid <br />Floors Above <br />Grade Building Gross Conditioned Floor Area Project Gross Conditioned Floor Area <br />Stories <br />2 29,066 29,066 — - <br />Compliance Method 1 - General 0 Compliance Method 2 - Total Building <br />Compliance Method 9 - Projects shall demonstrate compliance with all applicable mandatory and <br />General Compliance <br />prescriptive requirements of this code. Refer to C401.2, Item 1 for more information. Compliance forms to <br />include with a Prescriptive submittal., All applicable ENV, LTG, and MECH. <br />Path <br />Compliance Method 2 - Projects complying via total building performance (TSP) shall include a summary of <br />results from a whole building energy model per Section C407 and shall demonstrate compliance with all <br />applicable mandatory provisions in this Code. Refer to Section C401.2, Item 2 for more information. <br />Compliance forms to include with a TBP submittal: PROD -SUM, ENV -CHI{, LTG-EXT, LTG-CHK, and all <br />MECH forms except MECH-ECONO and MECH-VENT (pending). <br />Note 1 - Refrigerated Spaces - They shag comply with the envelope and refrigeration equipment requirements in Section C410. Warehouse <br />coolers and freezers shag also comply with the envelope requirements in C402. C410 takes precedent for overlapping requirements. <br />Note 2 - Semi -heated Spaces - if heated with equipment other than electric resistance may take an exemption for wall insulation. All other <br />envelope assemblies shall comply with the thermal envelope provisions. <br />Note 3 - Exemptions For Low Energy Spaces - Low Energy spaces are exempt from all provisions in WSEC Section C402 Building Envelope, <br />however all other applicable provisions in the Code do apply including lighting, mechanical, service water heating, etc. <br />Note 4 - Eligible Space Conditioning For Low Energy Greenhouses - Greenhouses are defined as spaces that maintain a specialized sunlit <br />environment that is used exclusively for cultivation, protection and maintenance of plants. Cooling with outside air and/or evaporative <br />cooling, and any form of heating equipment, are allowed under the Low Energy Greenhouse category. Greenhouses with cooling <br />equipment that re wires a condensin unit are AIOT eligible. <br />P R E I` T <br />2015 WSEC Compliance Forms for Commercial Buildings including R2, R3, & R4 over 3 stories and all R1 <br />Revised tier. 2019 <br />Project Title: 120019 VA C OC Everett WA <br />Date 12/11 J2020 <br />406 Additional <br />Building level efficiency options: <br />Current Scope <br />Previous Projects <br />C406.8 Enhanced envelope performance <br />0 <br />Efficiency Package <br />Options Summary <br />C406.9 Reduced air infiltration <br />0 <br />� <br />A minimum of two Options are <br />required for new construction, <br />C406.5 On -site renewable energy <br />and change in space <br />conditioning or occupancy <br />Building area level efficiency options <br />C406.2 More efficient HVAC equipment <br />0 <br />_ <br />13 <br />projects. <br />Select all Options included in <br />C406.6 Dedicated outside air systems (DOHS) <br />the current project scope. <br />Also select Options complied <br />C406.7 Reduced energy use in service water heating <br />with under previous projects <br />(shell and core, other tenant <br />C406.3 Reduced lighting power <br />d <br />spaces in building, etc) <br />Buildings with multiple tenant <br />C406.4 Enhanced digital lighting controls <br />spaces may comply with <br />different options (mix & <br />match). <br />C406 Comments: <br />Options are required for all <br />See architectural and electrical lighting plans for additional building data and energy code <br />space conditioning categories. <br />compliance notes (by others). <br />Include discipline specific <br />information for C406 options <br />in ENV -SUM, LTG -SUM and <br />MECH-SUM. <br />Refer to SBCC website for <br />official interpretations <br />regarding C406 provisions. <br />COPYRIGHT NOTICE <br />THIS LAYOUT/DESIGN IS A <br />COPYRIGHTED WORK OWNED BY <br />COMFORT SYSTEMS USA <br />(NORTHWEST), INC. (°'COMFORT <br />SYSTEMS NORTHWEST") AND <br />COMFORT SYSTEMS NORTHWEST <br />HEREBY RESERVES ITS RIGHT TO <br />PREVENT UNAUTHORIZED COPYING, <br />PUBLICATION OR USE OF THIS <br />LAY ®UT1DESIGN AND TO OBTAIN <br />DAMAGES THEREFORE. <br />SIGNED: 12/11 /2020 <br />AE" <br />REVISIONS <br />1. PERMIT SET 12-11-2020 <br />2. v <br />3. e <br />4. o <br />5. <br />MUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.