Laserfiche WebLink
WHERE FLOOR PENETRATIONS ARE OVER OPEN SPACE BELOW; FLOOR PENETRATIONS SHALL BE CORE -BORED, <br />SLEEVED, SEALED, FIRE STOPPED, AND WATER PROOFED. ALL PIPING SLEEVES SHALL EXTEND A MIN. OF FOUR <br />INCHES IN HEIGHT. PROVIDE TEMPORARY PROTECTION UNTIL CONSTRUCTION IS COMPLETE. <br />WATER PROOFING: <br />THE G.C. SHALL INSTALL A WATER PROOF MEMBRANE IN ALL WET AREAS, TOILET ROOMS, MOP SINK AND DRINKING <br />FOUNTAIN AND ALL OD SINK AREAS. THE SLAB SHALL BE WATER PROOFED USING A 30 MIL POLYETHYLENE <br />CLEAVAGE MEMBRANE EQUAL TO "NOBLESEAL TS INSTALLED T ALLED PER MANUFACTURES RECOMMENDATIONS AND <br />ANSI-A108 MEMBRANE SHALL EXTEND AROUND PERIMETER OF THE ROOM A MINIMUM OF (6") SIX INCHES IN <br />HEIGHT OR EQUAL TO THE HEIGHT OF THE BASE. SLEEVES AND FIXTURES MUST BE FLASHED INTO THE MEMBRANE. <br />ALL PENETRATIONS MUST BE SEALED IN ACCORDANCE WITH THE MFG'S RECOMMENDATIONS. BEFORE <br />INSTALLATION OF THE FINISHED FLOOR, THE FLOORING CONTRACTOR MUST DEMONSTRATE WATERTIGHT <br />INTEGRITY OF THE MEMBRANE TO THE LANDLORDS FIELD REPRESENTATIVE. <br />4-PVC30-A103-REV00 <br />CED <br />CED <br />EEH) <br />CEE) <br />CEH) <br />FLOOR <br />BASE <br />WALL <br />TRIM <br />CEILING (SEE RCP) <br />2-PVC30-A103-REV00 <br />x T. <br />A$ <br />x <br />�k <br />MATERIAL <br />FLAME SPREAD <br />SMOKE DENSITY <br />PLASTIC LAMINATE <br />80 (BONDED) <br />95 (BONDED) <br />CARPET <br />26 - 75 <br />450 OR LESS <br />VINYL TILE <br />0.45 <br />450 OR LESS <br />LAY -IN CEILING <br />25 <br />10 <br />FRP <br />150 <br />245 <br />VINYL BASE <br />0.45 <br />450 OR LESS <br />3-PVC30-A103-REV00 <br />W <br />P-182 <br />W <br />P-183 <br />LARGE <br />EXAM <br />F <br />C-800 <br />108 <br />B <br />MWB-181 <br />W <br />P-182 <br />W <br />P-183 <br />SMALL <br />EXAM <br />F <br />C-800 <br />109 <br />B <br />MWB-181 <br />1. EXISTING STOREFRONT TO REMAIN, <br />2. PAINT INTERIOR STOREFRONT AREA PARTITIONS (P-185) AS INDICATED, SEE SALES AREA <br />ELEVATIONS FOR EXTENTS OF WALL FINISHES. <br />3. START FULL TILE AT THIS LOCATION. ALIGN GROUT LINE WITH CORNER FINISH TRANSITION. <br />4. <br />5. INSTALL NEW F.R.P. (FRP-2) TO 4'-0" A.F.F. AT THE MOP SINK LOCATION AS INDICATED. ARROWS <br />AND INDICATES DIMENSI N 0 EXTENTS. TS. <br />6. INSTALL WATERPROOF T 00 MEMBRANE NE AT ALL WE AREAS WITHIN THE TOILET ROOM AND MOP SINK, <br />MEMBRANE MUST EXTEND A MIN. OF 6" UP THE WALL. SEE WATERPROOFING NOTE THIS SHEET. <br />7. 3/4" X 28 3/4" TRIM (LAM 181) SURROUNDING OPENING, SEE DETAIL 8/A401a. PROVIDED AND <br />INSTALLED BY G.C., SHALL HAVE NO VISIBLE FASTENERS. <br />8. WALL BASE DOES NOT NEED TO EXTEND BEHIND FIXTURES THAT ARE A SOLID FULL HEIGHT <br />FIXTURE. <br />O.D. W P-182 <br />RECEPTION <br />111 F TF-804 <br />B MWB-180 <br />2-PVC30-A103-REV00 <br />A. <br />G.C. IS RESPONSIBLE FOR ANY PREPARATION OF THE <br />H. <br />PRIOR TO INSTALLATION OF NEW FLOOR, GC TO VERIFY <br />FLOOR SLAB AND PROCUREMENT OF MATERIALS <br />EXISTING FLOOR CONDITIONS MEETS AND ARE IN <br />REQUIRED AT THE ENTRANCE TO PRODUCE A FLUSH <br />COMPLIANCE WITH ANSI STANDARD FOR THIN SET TILE <br />CONDITION BETWEEN THE STORE LEASE LINE AND THE <br />AND THE LATEST EDITION OF TILE COUNCIL OF <br />EXISTING MALL FLOORING. <br />AMERICA. IF THERE ARE ISSUES OR DEFICIENCIES, <br />B. <br />G.C. IS RESPONSIBLE FOR INSTALLING ALL FINISH <br />CONTACT NEXTORE PROJECT MANAGER PRIOR TO <br />FLOORING. G.C. IS ALSO RESPONSIBLE FOR ALL FINISH <br />INSTALLATION. <br />MATERIALS BEHIND AND UNDER ALL MILLWORK. <br />I. <br />ALLOW (2) WEEKS DRY TIME FOR ALL PAINTED WALLS <br />C. <br />REFER TO FINISH SCHEDULE ON SHEET G009 AND <br />BEFORE APPLYING GRAPHICS. <br />SPECIFICATIONS ON SHEETG003-0006. <br />J. <br />G.C. TOP REP CONCRETE FLOOR FOR NEW FLOORING <br />D. <br />REFER TO GENERAL NOTES ON SHEET 0001. <br />INSTALLATION, CLEAN, SCRAPE, GRIND, PATCH AND <br />REPAIR CONCRETE AS REQUIRED PER NEXTORE PROJECT <br />E. <br />ALL TENANT FURNISHED ITEMS (MATERIAL AND LABOR) <br />MANAGER'S APPROVAL. TYPICAL THROUGHOUT. <br />TO BE SCHEDULED, COORDINATED AND SUPERVISED BY <br />G.C. <br />K. <br />INSTALL NEW FLOOR TILE AS SHOWN, G.C. TO MAINTAIN <br />1/8" GROUT JOINT FOR FLOORING. PROVIDE ALL <br />F. <br />CAULK AROUND FRP TO THE WALLS WITH WHITE <br />FLOORING TRANSITIONS AS REQUIRED. <br />SILICONE CAULKING, <br />L. <br />PAINT ALL WALLS AS INDICATED, SEE INTERIOR <br />G. <br />REFER TO DOOR SCHEDULE ON SHEET G007a FOR DOOR <br />ELEVATIONS FOR ANY ADDITIONAL INFORMATION. <br />FINISHES. GO TO PREP EXISTING DOORS PRIOR TO <br />RE -FINISHING. <br />M. <br />INSTALL NEW CARPET FLOORING AS INDICATED. <br />N. <br />INSTALL NEW WALL BASE (MWB-180 & MWB-181). SEE <br />DETAILS 11 & 2/A401b. <br />1-PVC30-A103-REV01 <br />®ESIGN �X <br />CONSTRUCTION <br />MANAGEMENT <br />STORE 46261 <br />910 CENTER <br />910 SE EVERETT MALL WAY <br />EVERETT, WA 98208 <br />Construction for: <br />O <br />0 -Ct� <br />o Ln <br />-,;I- <br />® (3 <br />0 <br />O <br />4- <br />c <br />O 0 <br />J ,a O C6 <br />w � <br />m O <br />LLI �!, , <br />O <br />A 'x <br />n CD <br />N O <br />W ¢ O <br />d- <br />Revisions: <br />Mark Date <br />A <br />Architect of Record <br />C: m <br />C G R T LA N D <br />M 0 R G A N <br />ARCHITECT <br />711 N. FIELDER RD. <br />ARLINGTON, TX 76012 <br />PH: (817) 635-5696 <br />FAX: (817) 635-5699 <br />Seal <br />8897 <br />REGISTERED <br />A ITECT <br />CORTLAND MORGAN <br />STATE OF WASHINGTON <br />Architect Job No.: <br />33N2022 <br />Nextore Store Design Revision No.: <br />7 <br />Nextore Project <br />Number 86841 <br />Brand Design Type: <br />PV 3.0 <br />ISSUED FOR: <br />® CONSTRUCTION <br />Title <br />FINISH PLAN <br />at Sheet <br />04/19/2022 <br />Drawn By <br />STAFF A103 <br />Checked By <br />