My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
910 SE EVERETT MALL WAY 2022 PEARLE VISION Plans 2023-01-09
>
Address Records
>
SE EVERETT MALL WAY
>
910
>
PEARLE VISION
>
Plans
>
910 SE EVERETT MALL WAY 2022 PEARLE VISION Plans 2023-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 8:00:38 AM
Creation date
12/15/2022 1:19:58 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
910
Tenant Name
PEARLE VISION
Permit
B2204-058
Year
2022
Notes
REMODEL OF FORMER T MOBILE INTO A PEARLE VISION CENTER
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HANGER ROD <br />LOCKING NUT <br />SUPPORT NUT <br />HEAVY DUTY CLEVIS <br />HANGER. MATERIAL TO <br />MATCH PIPE <br />PIPE <br />FIBERGLASS <br />INSULATION <br />PER SPECS <br />180° RIBBED 18GA, <br />SHIELD SIMILAP <br />TO ANVIL #168 <br />gL <br />;TRIP <br />AL) <br />YPICAL) <br />SUPPORT <br />iit <br />w. INSULATED � iw DETAIL <br />mm <br />WALL FOR SECURING WATER HEATER <br />MOUNTING FRAME/BRACKET <br />ATIm <br />HANGER ROD <br />LOCKING NUT <br />SUPPORT NUT <br />WALL <br />1ALL CLEAN OUT DETA[L <br />HOT WATER SUPPLY OUTLET, SEE <br />PLANS HW <br />CW <br />COLD WATER SUPPLY INLET, SEE <br />PLANS <br />SHUT-OFF VALVES <br />UNION OR APPROVED FLEX _ <br />CONNECTOR, TYPICAL <br />PT <br />FULL LINE SIZE COPPER RELIEF <br />DRAIN TO HUB DRAIN OR MOP <br />SINK <br />� I <br />101 <br />HOSE BIB DRAIN <br />VALVE BEYOND <br />ASME PRESSURE & TEMP- <br />ERATURE RELIEF VALVE <br />3ALVANIZED SHEET METAL OR OTHER <br />>ORROSION-RESISTANT MATERIAL CONSTRUCTION <br />NATERTIGHT PAN. <br />SUPPORT WATER HEATER ASSEMBLY FROM PLATFORM, <br />REFER TO ARCHITECTURAL DRAWINGS FOR ADDVTIONAL <br />INFORMATION. COORDINATE WITH GENERAL TRADES <br />CONTRACTOR <br />WATER HEATER PIPING DETAIL <br />SEALANT <br />FINISHEEIC <br />FURNISH WI <br />TYPICAL FLOOR DRAIN DETAIL <br />BRONZE TOP <br />PROVIDE EWH WITH EXPANSION <br />TANK ON COLD WATER SUPPLY <br />SIDE, AMTROL OR EQUAL <br />UNISTRUT P-1000T CHANNEL, <br />BOLT TO WALL STRUCTURE <br />WITH (2) 3/8" BOLTS, MINIMUM <br />P1458 BRACKET, (3)1/2" BOLTS <br />AND NUTS, TYPICAL OF 2 <br />LOCATIONS <br />2°" X16 GA. GALVANIZED SHEET <br />METAL STRAP <br />FULL UNE SIZE COPPER RELIEF <br />DRAIN TO MOP SINK <br />CONCRETE SLAB <br />SAVV-OUT 24"X24" <br />ARE OF EXISTING <br />CONCRETE, CENTERED <br />ON DRAIN AND RE -POUR <br />W/ SLOPING SURF. <br />TO DRAEN <br />FLUSH WITH <br />FINISHED FLOOR <br />FINISHED FLOOR <br />OR WALK <br />._ L'4 "2 <br />MAXIMUM HW BRANCH PIPE LENGTHS <br />DISTANCE IS TO BE MEASURED FROM <br />PIPINGTHE SUPPLY <br />THE FIXTURE. <br />DISTANCE SHOWN -NOTE 2 <br />X NOTES <br />1. HOT WATER PIPING SHOWN ON FLOOR PLANS AND ISOMETRIC IS SHOWN FOR PLAN CLARITY. <br />HOT WATER PIPING SHALL LOOP DOWN INTO WALL AS SHOWN. <br />2. SEE TABLE FOR MAXIMUM ALLOWED DISTANCE OF PIPING FROM HOT WATER MAIN TO FIXTURE. <br />3. PIPE SIZE TO FIXTURE PER PLANS. <br />4. PIPE SIZE FOR HOT WATER DISTRIBUTION PIPING PER PLANS. <br />Polo HOT WATER SUPPLY PIPING AT POINT OF USE <br />o <br />01 <br />Revisions: <br />Mark Date <br />A <br />A <br />x <br />I <br />Date <br />0M 9/2022 <br />Drawn By <br />TBA <br />Checked By <br />TBA <br />_j <br />
The URL can be used to link to this page
Your browser does not support the video tag.