I. GENERAL PROVISIONS
<br />A. GENERAL CONDITIONS, CODES & STANDARDS
<br />1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, GENERAL
<br />AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) (NSPE)(NEC) AND ANY OF THE
<br />TENANT'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE,
<br />2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL
<br />AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS REGARDING; SAFETY,
<br />COORDINATION & COOPERATION, WORKMANSHIP, PROTECTION, CUTTING AND PATCHING, DAMAGE TO
<br />OTHER WORK, PRELIMINARY OPERATIONS, STORAGE, ADJUSTMENTS, CLEANING, ETC.
<br />3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL, STATE AND
<br />LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE TENANT REQUIREMENTS IN ADDITION TO
<br />THOSE SPECIFIED,
<br />4. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND
<br />INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REQUIRED COORDINATION
<br />WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS.
<br />1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF
<br />ALL EQUIPMENT WHICH IS APART OF THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS AND AS
<br />REQUIRED BY SIMILAR INSTALLATIONS, ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE
<br />DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO
<br />COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE
<br />FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE TENANT. GENERAL
<br />CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE TENANT A
<br />COMPLETE, CODE APPROVED AND OPERA T IONAL PLUMBING SYSTEMS.
<br />2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH
<br />ALL TRADES' WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID
<br />INTERFERENCES, ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE TENANT BEFORE WORK IS
<br />COMMENCED,
<br />3. ALL CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO
<br />WINGS AND SPECIFICATIONS COMPARE THEM WITH THE DRAWINGS , NOTE THE EXISTING CONDITIONS AND OTHER
<br />WORK THAT WILL BE REQUIRED, AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE
<br />PERFORMED. NO ALLOWANCE SHALL BE MADE TO ANY CONTRACTOR BY REASON OF THIS FAILURE TO HAVE
<br />MADE SUCH EXAMINATION OR OF ANY ERROR ON HIS PART.
<br />4. ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE
<br />DESIGN AND INS I ALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE TENANT.
<br />5. THIS GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS WITH THE GENERAL
<br />TRADES CONTRACTOR, THE FINAL LOCATIONS AND SIZES OF ALL DUCT AND LOUVER OPENINGS SHALL BE
<br />PROVIDED BY THIS CONTRACTOR.
<br />6. THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND MISCELLANEOUS EXPENSES
<br />REQUIRED FOR ALL REQUIRED PLUMBING DEMOLITION OF THE EXISTING AREAS BEING RENOVATED.
<br />a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY DISPOSED OFF
<br />SITE UNLESS OTHERWISE NOTED) OF ALL PLUMBING EQUIPMENT, PIPING, MATERIALS, ETC,
<br />NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE PLUMBING SYSTEMS FOR
<br />THE NEW RENOVATED AREAS.
<br />b. ALL UNDERGROUND SERVICES NOT BEING REUSED SHALL BE CAPPED BELOW THE FLOOR.
<br />c. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE MAIN AND
<br />CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN IT'S ENTIRETY.
<br />d. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE ARCHITECT
<br />AND THE TENANT'S GENERAL REQUIREMENTS.
<br />7. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE
<br />GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND TENANT. WHERE AN EQUIPMENT
<br />MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO
<br />THIS PROJECT.
<br />C. DOCUMENTS
<br />1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS INDICATED ON THE
<br />DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES
<br />SHALL BE MADE WITH NO ADDITIONAL COST TO THE TENANT,
<br />2. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS
<br />BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE
<br />INCLUDING IN BID.
<br />3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY
<br />MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH.
<br />4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR
<br />BETWEEN THE SAME, OR BETWEEN THE FIGURES ON THE DRAWINGS, AND THE SCALE OF SAME OR
<br />BETWEEN THE LARGER AND SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS
<br />SHALL BE REFERRED 10 THE TENANT FOR REVIEW AND FINAL DECISION PRIOR TO THE BID DUE DATE.
<br />5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY
<br />AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED.
<br />SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT
<br />AND MATERIAL.
<br />a. SUBSTITUTIONS
<br />L THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT DOCUMENTS ARE
<br />FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL OF QUALITY. THE
<br />GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE EQUIPMENT AND
<br />MATERIALS EXACTLY AS INDICATED.
<br />ii. THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL., WITH HIS BID QUOTATION, A LIST
<br />OF ANY PROPOSED SUBSTITUTIONS OF MATERIALS AND EQUIPMENT FOR THOSE ON WHICH
<br />THE ORIGINAL DESIGN WAS BASED. A FULL DESCRIPTION OF ALL PROPOSED SUBSTITUTED
<br />ITEMS, THE CHANGE TO THEIR BID PRICE OR OTHER REASONS FOR SUCH SUBSTITUTIONS
<br />SHALL ACCOMPANY THE BID. ALL ACCESSORIES, FEATURES, ETC., SUPPLIED WITH THE
<br />SUBSTITUTED MANUFACTURER'S PRODUCT SHALL ALSO BE INCLUDED IN THE BID.
<br />iiL IF THE GENERAL CONTRACTOR DOES NOT SUBMIT PROPOSED SUBSTITUTIONS WITH THEIR
<br />BID THE TENANT SHALL CONSIDER THE BIDDER TO BE PROPOSING THE MANUFACTURERS AND
<br />MODEL NUMBERS SPECIFIED HEREIN AND SHOWN ON THE CONTRACT DRAWINGS.
<br />iv. SUBSTITUTIONS AFTER CONTRACT AWARD SHALL NOT BE PERMITTED.
<br />6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY RECOGNIZED
<br />MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE SPECIFICATIONS.
<br />REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS.
<br />1. GENERAL CONTRACTOR SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE INTO CONSIDERATION
<br />MECHANICAL, ELECTRICAL AND GENERAL TRADE WORK CURRENTLY EXISTING AND WORK WHICH MAY BE
<br />INSTALLED PRIOR TO CONTRACT AWARD. RELOCATION OF DUCTWORK, PIPING AND EQUIPMENT, AS
<br />REQUIRED, TO AVOID THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE TENANT,
<br />2. GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING SITE BEFORE
<br />STARTING ANY FABRICATION OR DOING ANY WORK IN THE FIELD AND SHALL BE RESPONSIBLE FOR THE
<br />CORRECT AND PROPER MEASUREMENTS OF HIS WORK ALONG WITH RESOLUTIONS FOR ANY CONFLICT OF
<br />SPACE WITH OTHER TRADES.
<br />3. WHERE THE WORK OF TWO OR MORE TRADES INTERFERE WITH EACH OTHER AND A DEVIATION
<br />FROM DESIGN IS NECESSARY, NEITHER WORK SHALL PROCEED UNTIL THE TENANT HAS BEEN NOTIFIED OF
<br />THE CONFLICT AND THEY HAVE RENDERED A DECISION AS TO WHAT CHANGES SHOULD BE MADE.
<br />4. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES WHICH
<br />ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE
<br />PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES, ALL COSTS FOR REPAIR OF
<br />DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE DAMAGE.
<br />5, IT IS ESSENTIAL THAT ALL WORK AT THE PROJECT BE DONE AS SUCH TIME AND IN SUCH MANNER AS
<br />NOT TO INTERFERE WITH THE NORMAL OPERATIONS OF THE FACILITY. A WORK SCHEDULE SHALL BE
<br />ARRANGED WITH THE TENANT TO FACILITATE WORK WITH A MINIMUM OF INTERFERENCE WITH THE
<br />TENANT'S OPERATIONS.
<br />6. AREAS TO BE USED FOR STORAGE SHALL BE ONLY AS DIRECTED BY THE TENANT, ALL STORED
<br />MAT ERIAL SHALL BE RELOCATED OR REMOVED FROM THE SITE AS DIRECTED BY THE TENANT.
<br />7. DAILY, AND AT THE COMPLETION OF THE WORK, EACH GENERAL CONTRACTOR SHALL REMOVE ALL
<br />EXCESS MATERIALS AND DEBRIS CAUSED BY HIS WORK. UPON COMPLETION OF EACH GENERAL
<br />CONTRACTOR'S WORK, CONDITIONS OF THE SPACE(S) SHALL BE THE SAME AS FOUND PRIOR TO
<br />COMMENCEMENT OF THE WORK. FAILURE TO DO SO MAY RESULT IN THE TENANT'S EMPLOYMENT OF A
<br />SEPARATE SERVICE TO OBTAIN THIS CONDITION AND REDUCING THE FACTOR'S CONTRACT AMOUNT BY THE
<br />COST OF SUCH A SERVICE.
<br />8. EACH GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK
<br />CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR HIS SUB -TRADE'S PERSONNEL. ALL
<br />PATCHING, REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE TENANT
<br />BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE PAID BY THE
<br />CONTRACTOR CAUSING THE DAMAGE.
<br />E. METHODS
<br />1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW CUT. PIPING SHALL BE
<br />LAID ON AN APPROPRIATELY GRADED 6" BED OF CLEAN AND DRY SAND. ENGINEERED FILL SHALL BE USED
<br />TO BACKFILL TO 6" ABOVE THE PIPING, BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE
<br />EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE TENANT. IF THE EXCAVATED MATERIALS
<br />ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL
<br />THE REMAINDER OF THE TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9" LIFTS WITH ALL LIFTS
<br />COMPACTED TO 95% PROCTOR. PATCH FLOOR TO MATCH EXISTING.
<br />2, EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM ANY CEILINGS, OTHER
<br />PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM
<br />ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL
<br />ENGINEER,
<br />3. ALL ROOF PENETRA T IONS, FLASHING AND COUNTER FLASHING SHALL BE PERFORMED BY THE
<br />TENANT'S ROOFING CONTRACTOR AT THE REQUESTING GENERAL CONTRACTORS COST.
<br />II. INSULATION
<br />A. GENERAL
<br />1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS, AND IN
<br />ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES,
<br />2. CLEAN AND DRY SURFACES PRIOR TO INSULATING.
<br />3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, HANGERS AND SIMILAR
<br />PENETRATIONS.
<br />4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED.
<br />5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. SEAL ALL
<br />PENETRATIONS OF THE VAPOR BARRIER BY STAPLES, HANGERS OR WHERE OTHERWISE DAMAGED.
<br />6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES.
<br />7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE.
<br />1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING INSULATION WITH AN
<br />ALL SERVICE JACKET AND SELF SEALING LAP (ASJ/SSL).
<br />a. DOMESTIC HOT AND COLD WATER PIPING UP TO 314 INCH DIAMETER - 1/2 INCH THICK.
<br />2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED FIBERGLASS FITTINGS AND
<br />COVERED WITH A PRE -FORMED PVC FITTING COVER,
<br />111. PLUMBING
<br />A. GENERAL
<br />1. THE ENTIRE PLUMBING INSTALLATION, MATERIALS, EQUIPMENT, ETC. SHALL CONFORM TO THE
<br />REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING CODE, THE PLUMBING CODE, THE AMERICAN
<br />DISABILITIES ACT GUIDELINES, ANSI Al17.1 REQUIREMENTS FOR THE PHYSICALLY CHALLENGED AND THE
<br />UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) GENERAL CONTRACTOR TO VERIFY ALL PLUMBING
<br />ROUGH IN DIMENSIONS MEET THE ABOVE NOTED REQUIREMENTS, VERIFY FINAL ROUGH IN WITH
<br />ARCHITECT PRIOR TO BACKFILLING OR WALL INSTALLATION.
<br />2. TEST ALL SEWER AND WATER PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES,
<br />3. FURNISH ACCESS DOORS FOR WALL CLEAN OUTS AND VALVES IN WALLS.
<br />4. ALL FIXTURES AND EQUIPMENT NOT SPECIFIED HERE -IN ARE BEING PROVIDED BY OTHERS. THIS
<br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ROUGHING IN ALL SERVICES FOR ALL EQUIPMENT
<br />WHETHER PROVIDED BY THIS GENERAL CONTRACTOR OR OTHERS. GENERAL CONTRACTOR SHALL
<br />COORDINATE HIS INSTALLATION WITH THE APPROPRIATE EQUIPMENT SUPPLIER FOR PROPER ROUGH IN
<br />INFORMATION AND SHALL REVISE THE DESIGN AS REQUIRED TO MATCH THE EQUIPMENT BEING SUPPLIED.
<br />THIS GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL
<br />FIXTURES TO THE PLUMBING SYSTEMS INCLUDING BUT NOT LIMITED TO; ALL WATER OR NATURAL GAS
<br />CONNECTIONS FROM APPROPRIATE STOP OR VALVE, ALL DIRECT SANITARY CONNECTIONS, ALL INDIRECT
<br />WASTE CONNECTIONS TO FLOOR DRAINS OR SINKS FROM SINKS OR EQUIPMENT, COOLER AND FREEZER
<br />COIL CONDENSATE DRAIN PIPING, ETC.
<br />5. FIRE STOPPING - REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL CONSTRUCTION
<br />DESIGN NUMBER. FOR RATED MASONRY WALL AND FLOOR ASSEMBLIES, PROVIDE A UL APPROVED
<br />THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES,
<br />PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER W-L-1003.
<br />B. PIPING
<br />1. PIPE HANGERS FOR THE PLUMBING SYSTEM SHALL BE ADJUSTABLE CLEVIS MANGERS WITH
<br />APPROPRIATE CLAMP. ALL PIPING SHALL BE SUPPORTED ON A MAXIMUM SPACING OF:
<br />a. U CENTERS FOR PIPING 3/4" AND SMALLER.
<br />b. 8' CENTERS FOR I" PIPING.
<br />c. 10' CENTERS FOR PIPING LARGER THAN 1".
<br />d. DOMESTIC WATER PIPING TO BE TYPE L COPPER.
<br />e. PIPING ABOVE THE ROOF SHALL BE SUPPORTED PER THE DETAIL ON THE DRAWINGS.
<br />f, PIPE HANGERS FOR INSULATED PIPING SYSTEMS SHALL BE SIZED FOR THE GROSS OUTSIDE
<br />DIMENSION OF THE PIPE AND INSULATION, SEE INSULATION SPECIFICATIONS FOR INSULATION
<br />REQUIREMENTS.
<br />C. SANITARY AND VENT
<br />1. ALL PIPING SHALL PITCH TO ITS APPROPRIATE MAIN AT NO LESS THAN 114" PER FOOT SLOPE.
<br />2, UNDERGROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON HUB AND SPIGOT
<br />PIPE WITH COMPRESSION GASKET JOINTS.
<br />3. ABOVE GROUND WASTE AND VENT PIPING (3" AND LARGER) SHALL BE HUB AND SPIGOT CAST IRON
<br />PIPE WITH LEAD AND OAKUM JOINTS AND BE HUNG PER CJ.S.PJ. REQUIREMENTS.
<br />1. GENERAL CONTRACTOR SHALL COORDINATE WITH THE BUILDING TENANT AND THE LOCAL WATER
<br />COMPANY FOR THE INSTALLATION OF A NEW WATER METER, THIS SHALL INCLUDE THE FEES/COSTS AND
<br />INSTALLATION OF A NEW WATER METER AS SHOWN ON THE PLANS AND THE ASSOCIATED REMOTE READER.
<br />THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL WATER COMPANY.
<br />LOCATE REMOTE READER AT BUILDING TENANT'S AND WATER COMPANY'S DIRECTION.
<br />2. TEST WATER PIPING TO HYDROSTAT IC PRESSURE OF 100 PSIG. FOR TWO HOURS. STERILIZE ALL
<br />DOMESTIC WATER PIPING IN ACCORDANCE WITH A.W.W.A. STANDARDS.
<br />3. ABOVE GROUND WATER PIPING, 3" AND SMALLER, SHALL BE TYPE "L" HARD DRAWN COPPER PIPE
<br />WITH WROUGHT COPPER FITTINGS AND 95-5 SOLDERED JOINTS. AS AN ALTERNATE THE GENERAL
<br />CONTRACTOR MAY UTILIZE COPPER PRESS FITTINGS (PROPRESS SYSTEM) AS MANUFACTURED BY VIEGA.
<br />FITTINGS SHALL CONFORM TO THE MATERIAL AND SIZING REQUIREMENTS OF ASME B16.18 OR ASME B16.22.
<br />O-RINGS FOR FITTINGS SHALL BE EDPM. INSTALLATION OF FITTINGS SHALL CONFORM TO CODE AND THE
<br />MANUFACTURER'S SPECIFICATIONS/REQUIREMENTS. WATER PIPING JOINTS BETWEEN DIFFERENT
<br />MATERIALS SHALL BE PER THE LOCALLY ENFORCED PLUMBING CODE SECTION 605.22.
<br />4. DOMESTIC WATER VALVES SHALL BE MILWAUKEE VALVE #BA-100 OR #BA-150 BALL VALVE. ALL
<br />VALVES SHALL BE LEAD-FREE.
<br />NOTE: ALL SPECS MAY NOT BE USED IN EVERY STORE.
<br />PLUMBINGT SCHEDULE CD
<br />GENERAL NOTE: FOLLOW ALL MANUFACTURERS INSTALLATION AND MAINTENANCE INSTRUCTIONS.
<br />SUPPLIED/
<br />ITEM
<br />MARKT
<br />INSTALLED BY
<br />MANUF
<br />MODEL#/COLOR
<br />REMARKS
<br />SINK: CLF-ADA-10-1 HOLE CENTERED
<br />*SELECT 1-HOLE DRILLING CONFIGURATION. GC TO MAKE FINAL CONNECTIONS. INSTALL
<br />SK3.1
<br />ROUND SINK FOR CONTACT LENS
<br />PC / PC
<br />JUST SINKS & SLOAN
<br />FAUCET: Sloan EBF-415-BAT-TEE-SF-0.5GPM-MLM-IR-FCT
<br />THERMOSTATIC MIXING VALVE BELOW FIXTURE, CONNECT TO SUPPLY PIPING AT FIXTURE, SET
<br />SINKS
<br />WATER TEMP. ['7a 110- F USING TM 1 (WATTS OR EQUAL),
<br />SK7.1
<br />SINGLE BOWL DROP IN SINK FOR OD CABINET
<br />P PC
<br />C /
<br />€LKAY & SLOAN
<br />SINK: ASANA RLR9-1 HOLE, STRAINER: LK36,
<br />*SELECT 1-HOLE DRILLING CONFIGURATION. G.C. TO MAKE FINAL CONNECTIONS. INS I ALL
<br />FAUCET: Sloan EBF-415-BAT-TEE-SF-0.5GPM-MLM-IR-FCT
<br />MIXING VALVE BELOW FIXTURE, CONNECT TO SUPPLY PIPING AT FIXTURE, SET WATER
<br />TEMP. @ 110- F USING TMV-1
<br />ONE PIECE MOLDED STONE MOP BASIN W/ 10" HIGH SIDES FOR
<br />SINK: MSB2424, FAUCET: #830-AA W/ WALL
<br />COORDINATE LOCATION OF MOP HOLDER. THE SPECIFIED FAUCET HAS A
<br />MOP SINK
<br />MS
<br />RECESSED INSTALLATION, 3" BASIN DRAIN W/ SERVICE SINK
<br />FIAT PRODUCTS
<br />GRACE, 30" HOSE BRACKET: #932-AA, MOP
<br />VACUUM BREAKER INTEGRAL WITH THE UNIT.
<br />STRAINER
<br />PC / PC
<br />HANGER: #889-CC
<br />WATER HEATER
<br />WH
<br />STORAGE WATER HEATER. TANK SHALL BE GLASS LINED, 150 PSI
<br />AO SMITH
<br />#DEL-20, 20 GALLONS, 6.0KW HEATING
<br />REFER TO PLUMBING FLAN FOR LOCATION
<br />WORKING PRESSURE, DRAIN INDIRECTLY TO MOP SINK BELOW.
<br />PC ( PC
<br />ELEMENT, 208V/1 P
<br />COMMERCIAL ELECTRIC WATER HEAT ER
<br />PIPING SUPPORTS
<br />WATER HAMMER ARRESTORS
<br />PC/PC
<br />WATTS/GRAINGER
<br />#3A559
<br />CLEANOUTS
<br />FCO
<br />REFER TO SHEET P-200
<br />____rFLOOR
<br />PC/PC
<br />J.R. SMITH
<br />4000 SERIES
<br />REFER TO PLUMBING PLAN FOR LOCATION
<br />WALL CLEANOUTS
<br />WCO
<br />REFER TO SHEET P-200
<br />PC/PC
<br />J.R, SMITH
<br />4400 SERIES
<br />REFER TO PLUMBING PLAN FOR LOCATION
<br />TRAP PRIMER VALVE
<br />TPV
<br />VALVE TO AUTOMATICALLY ADD WATER TO DRAIN LINE TRAP
<br />PC / PC
<br />PPP, INC
<br />PRO1-500 UNDER LAVATORY
<br />REFER TO PLUMBING PLAN FOR LOCA I ION
<br />RECIRCULATION PUMP
<br />RP1
<br />PUMP TO RECIRCULATE HOT WATER RETURN
<br />PC/PC
<br />BELL & GOSSETT
<br />NGF 22U
<br />=WATIT,1 PHASE, 3000 RPM, 4 GPM 12 FT WC, WITH AQUASTAT AND UNION. PROVIDE
<br />AND REQUIRED ACCESSORIES.
<br />RESPONSIBILITY SCHEDULE (PLUMBING)
<br />T= TENANT
<br />GC= GENERAL CONTRACTOR
<br />LL= LANDLORD
<br />ER
<br />N A= NOT APPLICABLE
<br />DIVISION 1500 - PLUMBING
<br />SUPL
<br />RCV.
<br />INSTL
<br />EX
<br />P & R
<br />RELO
<br />REMARKS
<br />ACCESS PANELS
<br />GC
<br />GC
<br />GC
<br />COORDINATE WITH TRADES FOR SIZE AND LOCATION.
<br />ROOF WORK
<br />PLUMBING FIXTURES
<br />GC
<br />GC
<br />GC
<br />GC
<br />GC
<br />GC
<br />GC TO COORD. W/ LANDLORD WHEN REQUIRED
<br />OD SINKS, DRAINS, FAUCETS
<br />GC
<br />GC
<br />GC
<br />GC TO MAKE FINAL CONNECTIONS
<br />FLOOR DRAINS / PIPING / SUPPORTS
<br />GC
<br />GCIGCI
<br />I GC TO CLEAN OUT EXISTING FLOOR DRAINS
<br />WATER AND SEWER CONNECTION
<br />GC
<br />GC
<br />GC19
<br />SEE PLUMBING DRAWINGS FOR SCOPE OF WORK _
<br />WATER HEATER
<br />GC
<br />GC
<br />GC11
<br />WATER METER
<br />GC
<br />GC
<br />GC
<br />SEE 'GENERAL CONTRACTOR NOTES' ON SHEET G001
<br />Mark Date
<br />A
<br />Associates
<br />C0INSULTING
<br />E N G IN E E R S
<br />3030 West Streetsboro Road
<br />Richfield, Ohio 44286
<br />(330) 659-6688 Phone
<br />(330) 659-6675 Fax
<br />Architect Job No.:
<br />33N2022
<br />Nextore Store Design Revision No.:
<br />ISSUE FOR:
<br />0 CONSTRUCTION
<br />IQ, 111=120m, MU
<br />SPECIFICATIONS
<br />Date
<br />04/19/2022
<br />Drawn By
<br />TBA
<br />Checked By
<br />TQA
<br />Sheet
<br />h � }
<br />
|