Laserfiche WebLink
I. GENERAL PROVISIONS <br />A. GENERAL CONDITIONS, CODES & STANDARDS <br />1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, GENERAL <br />AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) (NSPE)(NEC) AND ANY OF THE <br />TENANT'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE, <br />2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL <br />AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS REGARDING; SAFETY, <br />COORDINATION & COOPERATION, WORKMANSHIP, PROTECTION, CUTTING AND PATCHING, DAMAGE TO <br />OTHER WORK, PRELIMINARY OPERATIONS, STORAGE, ADJUSTMENTS, CLEANING, ETC. <br />3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL, STATE AND <br />LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE TENANT REQUIREMENTS IN ADDITION TO <br />THOSE SPECIFIED, <br />4. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND <br />INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REQUIRED COORDINATION <br />WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS. <br />1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF <br />ALL EQUIPMENT WHICH IS APART OF THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS AND AS <br />REQUIRED BY SIMILAR INSTALLATIONS, ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE <br />DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO <br />COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE <br />FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE TENANT. GENERAL <br />CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE TENANT A <br />COMPLETE, CODE APPROVED AND OPERA T IONAL PLUMBING SYSTEMS. <br />2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH <br />ALL TRADES' WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID <br />INTERFERENCES, ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE TENANT BEFORE WORK IS <br />COMMENCED, <br />3. ALL CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO <br />WINGS AND SPECIFICATIONS COMPARE THEM WITH THE DRAWINGS , NOTE THE EXISTING CONDITIONS AND OTHER <br />WORK THAT WILL BE REQUIRED, AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE <br />PERFORMED. NO ALLOWANCE SHALL BE MADE TO ANY CONTRACTOR BY REASON OF THIS FAILURE TO HAVE <br />MADE SUCH EXAMINATION OR OF ANY ERROR ON HIS PART. <br />4. ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE <br />DESIGN AND INS I ALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE TENANT. <br />5. THIS GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS WITH THE GENERAL <br />TRADES CONTRACTOR, THE FINAL LOCATIONS AND SIZES OF ALL DUCT AND LOUVER OPENINGS SHALL BE <br />PROVIDED BY THIS CONTRACTOR. <br />6. THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND MISCELLANEOUS EXPENSES <br />REQUIRED FOR ALL REQUIRED PLUMBING DEMOLITION OF THE EXISTING AREAS BEING RENOVATED. <br />a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY DISPOSED OFF <br />SITE UNLESS OTHERWISE NOTED) OF ALL PLUMBING EQUIPMENT, PIPING, MATERIALS, ETC, <br />NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE PLUMBING SYSTEMS FOR <br />THE NEW RENOVATED AREAS. <br />b. ALL UNDERGROUND SERVICES NOT BEING REUSED SHALL BE CAPPED BELOW THE FLOOR. <br />c. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE MAIN AND <br />CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN IT'S ENTIRETY. <br />d. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE ARCHITECT <br />AND THE TENANT'S GENERAL REQUIREMENTS. <br />7. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE <br />GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND TENANT. WHERE AN EQUIPMENT <br />MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO <br />THIS PROJECT. <br />C. DOCUMENTS <br />1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS INDICATED ON THE <br />DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES <br />SHALL BE MADE WITH NO ADDITIONAL COST TO THE TENANT, <br />2. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS <br />BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE <br />INCLUDING IN BID. <br />3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY <br />MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH. <br />4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR <br />BETWEEN THE SAME, OR BETWEEN THE FIGURES ON THE DRAWINGS, AND THE SCALE OF SAME OR <br />BETWEEN THE LARGER AND SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS <br />SHALL BE REFERRED 10 THE TENANT FOR REVIEW AND FINAL DECISION PRIOR TO THE BID DUE DATE. <br />5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY <br />AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. <br />SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT <br />AND MATERIAL. <br />a. SUBSTITUTIONS <br />L THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT DOCUMENTS ARE <br />FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL OF QUALITY. THE <br />GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE EQUIPMENT AND <br />MATERIALS EXACTLY AS INDICATED. <br />ii. THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL., WITH HIS BID QUOTATION, A LIST <br />OF ANY PROPOSED SUBSTITUTIONS OF MATERIALS AND EQUIPMENT FOR THOSE ON WHICH <br />THE ORIGINAL DESIGN WAS BASED. A FULL DESCRIPTION OF ALL PROPOSED SUBSTITUTED <br />ITEMS, THE CHANGE TO THEIR BID PRICE OR OTHER REASONS FOR SUCH SUBSTITUTIONS <br />SHALL ACCOMPANY THE BID. ALL ACCESSORIES, FEATURES, ETC., SUPPLIED WITH THE <br />SUBSTITUTED MANUFACTURER'S PRODUCT SHALL ALSO BE INCLUDED IN THE BID. <br />iiL IF THE GENERAL CONTRACTOR DOES NOT SUBMIT PROPOSED SUBSTITUTIONS WITH THEIR <br />BID THE TENANT SHALL CONSIDER THE BIDDER TO BE PROPOSING THE MANUFACTURERS AND <br />MODEL NUMBERS SPECIFIED HEREIN AND SHOWN ON THE CONTRACT DRAWINGS. <br />iv. SUBSTITUTIONS AFTER CONTRACT AWARD SHALL NOT BE PERMITTED. <br />6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY RECOGNIZED <br />MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE SPECIFICATIONS. <br />REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. <br />1. GENERAL CONTRACTOR SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE INTO CONSIDERATION <br />MECHANICAL, ELECTRICAL AND GENERAL TRADE WORK CURRENTLY EXISTING AND WORK WHICH MAY BE <br />INSTALLED PRIOR TO CONTRACT AWARD. RELOCATION OF DUCTWORK, PIPING AND EQUIPMENT, AS <br />REQUIRED, TO AVOID THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE TENANT, <br />2. GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING SITE BEFORE <br />STARTING ANY FABRICATION OR DOING ANY WORK IN THE FIELD AND SHALL BE RESPONSIBLE FOR THE <br />CORRECT AND PROPER MEASUREMENTS OF HIS WORK ALONG WITH RESOLUTIONS FOR ANY CONFLICT OF <br />SPACE WITH OTHER TRADES. <br />3. WHERE THE WORK OF TWO OR MORE TRADES INTERFERE WITH EACH OTHER AND A DEVIATION <br />FROM DESIGN IS NECESSARY, NEITHER WORK SHALL PROCEED UNTIL THE TENANT HAS BEEN NOTIFIED OF <br />THE CONFLICT AND THEY HAVE RENDERED A DECISION AS TO WHAT CHANGES SHOULD BE MADE. <br />4. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES WHICH <br />ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE <br />PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES, ALL COSTS FOR REPAIR OF <br />DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE DAMAGE. <br />5, IT IS ESSENTIAL THAT ALL WORK AT THE PROJECT BE DONE AS SUCH TIME AND IN SUCH MANNER AS <br />NOT TO INTERFERE WITH THE NORMAL OPERATIONS OF THE FACILITY. A WORK SCHEDULE SHALL BE <br />ARRANGED WITH THE TENANT TO FACILITATE WORK WITH A MINIMUM OF INTERFERENCE WITH THE <br />TENANT'S OPERATIONS. <br />6. AREAS TO BE USED FOR STORAGE SHALL BE ONLY AS DIRECTED BY THE TENANT, ALL STORED <br />MAT ERIAL SHALL BE RELOCATED OR REMOVED FROM THE SITE AS DIRECTED BY THE TENANT. <br />7. DAILY, AND AT THE COMPLETION OF THE WORK, EACH GENERAL CONTRACTOR SHALL REMOVE ALL <br />EXCESS MATERIALS AND DEBRIS CAUSED BY HIS WORK. UPON COMPLETION OF EACH GENERAL <br />CONTRACTOR'S WORK, CONDITIONS OF THE SPACE(S) SHALL BE THE SAME AS FOUND PRIOR TO <br />COMMENCEMENT OF THE WORK. FAILURE TO DO SO MAY RESULT IN THE TENANT'S EMPLOYMENT OF A <br />SEPARATE SERVICE TO OBTAIN THIS CONDITION AND REDUCING THE FACTOR'S CONTRACT AMOUNT BY THE <br />COST OF SUCH A SERVICE. <br />8. EACH GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK <br />CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR HIS SUB -TRADE'S PERSONNEL. ALL <br />PATCHING, REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE TENANT <br />BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE PAID BY THE <br />CONTRACTOR CAUSING THE DAMAGE. <br />E. METHODS <br />1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW CUT. PIPING SHALL BE <br />LAID ON AN APPROPRIATELY GRADED 6" BED OF CLEAN AND DRY SAND. ENGINEERED FILL SHALL BE USED <br />TO BACKFILL TO 6" ABOVE THE PIPING, BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE <br />EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE TENANT. IF THE EXCAVATED MATERIALS <br />ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL <br />THE REMAINDER OF THE TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9" LIFTS WITH ALL LIFTS <br />COMPACTED TO 95% PROCTOR. PATCH FLOOR TO MATCH EXISTING. <br />2, EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM ANY CEILINGS, OTHER <br />PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM <br />ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL <br />ENGINEER, <br />3. ALL ROOF PENETRA T IONS, FLASHING AND COUNTER FLASHING SHALL BE PERFORMED BY THE <br />TENANT'S ROOFING CONTRACTOR AT THE REQUESTING GENERAL CONTRACTORS COST. <br />II. INSULATION <br />A. GENERAL <br />1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS, AND IN <br />ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES, <br />2. CLEAN AND DRY SURFACES PRIOR TO INSULATING. <br />3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, HANGERS AND SIMILAR <br />PENETRATIONS. <br />4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. <br />5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. SEAL ALL <br />PENETRATIONS OF THE VAPOR BARRIER BY STAPLES, HANGERS OR WHERE OTHERWISE DAMAGED. <br />6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. <br />7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE. <br />1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING INSULATION WITH AN <br />ALL SERVICE JACKET AND SELF SEALING LAP (ASJ/SSL). <br />a. DOMESTIC HOT AND COLD WATER PIPING UP TO 314 INCH DIAMETER - 1/2 INCH THICK. <br />2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED FIBERGLASS FITTINGS AND <br />COVERED WITH A PRE -FORMED PVC FITTING COVER, <br />111. PLUMBING <br />A. GENERAL <br />1. THE ENTIRE PLUMBING INSTALLATION, MATERIALS, EQUIPMENT, ETC. SHALL CONFORM TO THE <br />REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING CODE, THE PLUMBING CODE, THE AMERICAN <br />DISABILITIES ACT GUIDELINES, ANSI Al17.1 REQUIREMENTS FOR THE PHYSICALLY CHALLENGED AND THE <br />UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) GENERAL CONTRACTOR TO VERIFY ALL PLUMBING <br />ROUGH IN DIMENSIONS MEET THE ABOVE NOTED REQUIREMENTS, VERIFY FINAL ROUGH IN WITH <br />ARCHITECT PRIOR TO BACKFILLING OR WALL INSTALLATION. <br />2. TEST ALL SEWER AND WATER PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES, <br />3. FURNISH ACCESS DOORS FOR WALL CLEAN OUTS AND VALVES IN WALLS. <br />4. ALL FIXTURES AND EQUIPMENT NOT SPECIFIED HERE -IN ARE BEING PROVIDED BY OTHERS. THIS <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ROUGHING IN ALL SERVICES FOR ALL EQUIPMENT <br />WHETHER PROVIDED BY THIS GENERAL CONTRACTOR OR OTHERS. GENERAL CONTRACTOR SHALL <br />COORDINATE HIS INSTALLATION WITH THE APPROPRIATE EQUIPMENT SUPPLIER FOR PROPER ROUGH IN <br />INFORMATION AND SHALL REVISE THE DESIGN AS REQUIRED TO MATCH THE EQUIPMENT BEING SUPPLIED. <br />THIS GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL <br />FIXTURES TO THE PLUMBING SYSTEMS INCLUDING BUT NOT LIMITED TO; ALL WATER OR NATURAL GAS <br />CONNECTIONS FROM APPROPRIATE STOP OR VALVE, ALL DIRECT SANITARY CONNECTIONS, ALL INDIRECT <br />WASTE CONNECTIONS TO FLOOR DRAINS OR SINKS FROM SINKS OR EQUIPMENT, COOLER AND FREEZER <br />COIL CONDENSATE DRAIN PIPING, ETC. <br />5. FIRE STOPPING - REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL CONSTRUCTION <br />DESIGN NUMBER. FOR RATED MASONRY WALL AND FLOOR ASSEMBLIES, PROVIDE A UL APPROVED <br />THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES, <br />PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER W-L-1003. <br />B. PIPING <br />1. PIPE HANGERS FOR THE PLUMBING SYSTEM SHALL BE ADJUSTABLE CLEVIS MANGERS WITH <br />APPROPRIATE CLAMP. ALL PIPING SHALL BE SUPPORTED ON A MAXIMUM SPACING OF: <br />a. U CENTERS FOR PIPING 3/4" AND SMALLER. <br />b. 8' CENTERS FOR I" PIPING. <br />c. 10' CENTERS FOR PIPING LARGER THAN 1". <br />d. DOMESTIC WATER PIPING TO BE TYPE L COPPER. <br />e. PIPING ABOVE THE ROOF SHALL BE SUPPORTED PER THE DETAIL ON THE DRAWINGS. <br />f, PIPE HANGERS FOR INSULATED PIPING SYSTEMS SHALL BE SIZED FOR THE GROSS OUTSIDE <br />DIMENSION OF THE PIPE AND INSULATION, SEE INSULATION SPECIFICATIONS FOR INSULATION <br />REQUIREMENTS. <br />C. SANITARY AND VENT <br />1. ALL PIPING SHALL PITCH TO ITS APPROPRIATE MAIN AT NO LESS THAN 114" PER FOOT SLOPE. <br />2, UNDERGROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON HUB AND SPIGOT <br />PIPE WITH COMPRESSION GASKET JOINTS. <br />3. ABOVE GROUND WASTE AND VENT PIPING (3" AND LARGER) SHALL BE HUB AND SPIGOT CAST IRON <br />PIPE WITH LEAD AND OAKUM JOINTS AND BE HUNG PER CJ.S.PJ. REQUIREMENTS. <br />1. GENERAL CONTRACTOR SHALL COORDINATE WITH THE BUILDING TENANT AND THE LOCAL WATER <br />COMPANY FOR THE INSTALLATION OF A NEW WATER METER, THIS SHALL INCLUDE THE FEES/COSTS AND <br />INSTALLATION OF A NEW WATER METER AS SHOWN ON THE PLANS AND THE ASSOCIATED REMOTE READER. <br />THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL WATER COMPANY. <br />LOCATE REMOTE READER AT BUILDING TENANT'S AND WATER COMPANY'S DIRECTION. <br />2. TEST WATER PIPING TO HYDROSTAT IC PRESSURE OF 100 PSIG. FOR TWO HOURS. STERILIZE ALL <br />DOMESTIC WATER PIPING IN ACCORDANCE WITH A.W.W.A. STANDARDS. <br />3. ABOVE GROUND WATER PIPING, 3" AND SMALLER, SHALL BE TYPE "L" HARD DRAWN COPPER PIPE <br />WITH WROUGHT COPPER FITTINGS AND 95-5 SOLDERED JOINTS. AS AN ALTERNATE THE GENERAL <br />CONTRACTOR MAY UTILIZE COPPER PRESS FITTINGS (PROPRESS SYSTEM) AS MANUFACTURED BY VIEGA. <br />FITTINGS SHALL CONFORM TO THE MATERIAL AND SIZING REQUIREMENTS OF ASME B16.18 OR ASME B16.22. <br />O-RINGS FOR FITTINGS SHALL BE EDPM. INSTALLATION OF FITTINGS SHALL CONFORM TO CODE AND THE <br />MANUFACTURER'S SPECIFICATIONS/REQUIREMENTS. WATER PIPING JOINTS BETWEEN DIFFERENT <br />MATERIALS SHALL BE PER THE LOCALLY ENFORCED PLUMBING CODE SECTION 605.22. <br />4. DOMESTIC WATER VALVES SHALL BE MILWAUKEE VALVE #BA-100 OR #BA-150 BALL VALVE. ALL <br />VALVES SHALL BE LEAD-FREE. <br />NOTE: ALL SPECS MAY NOT BE USED IN EVERY STORE. <br />PLUMBINGT SCHEDULE CD <br />GENERAL NOTE: FOLLOW ALL MANUFACTURERS INSTALLATION AND MAINTENANCE INSTRUCTIONS. <br />SUPPLIED/ <br />ITEM <br />MARKT <br />INSTALLED BY <br />MANUF <br />MODEL#/COLOR <br />REMARKS <br />SINK: CLF-ADA-10-1 HOLE CENTERED <br />*SELECT 1-HOLE DRILLING CONFIGURATION. GC TO MAKE FINAL CONNECTIONS. INSTALL <br />SK3.1 <br />ROUND SINK FOR CONTACT LENS <br />PC / PC <br />JUST SINKS & SLOAN <br />FAUCET: Sloan EBF-415-BAT-TEE-SF-0.5GPM-MLM-IR-FCT <br />THERMOSTATIC MIXING VALVE BELOW FIXTURE, CONNECT TO SUPPLY PIPING AT FIXTURE, SET <br />SINKS <br />WATER TEMP. ['7a 110- F USING TM 1 (WATTS OR EQUAL), <br />SK7.1 <br />SINGLE BOWL DROP IN SINK FOR OD CABINET <br />P PC <br />C / <br />€LKAY & SLOAN <br />SINK: ASANA RLR9-1 HOLE, STRAINER: LK36, <br />*SELECT 1-HOLE DRILLING CONFIGURATION. G.C. TO MAKE FINAL CONNECTIONS. INS I ALL <br />FAUCET: Sloan EBF-415-BAT-TEE-SF-0.5GPM-MLM-IR-FCT <br />MIXING VALVE BELOW FIXTURE, CONNECT TO SUPPLY PIPING AT FIXTURE, SET WATER <br />TEMP. @ 110- F USING TMV-1 <br />ONE PIECE MOLDED STONE MOP BASIN W/ 10" HIGH SIDES FOR <br />SINK: MSB2424, FAUCET: #830-AA W/ WALL <br />COORDINATE LOCATION OF MOP HOLDER. THE SPECIFIED FAUCET HAS A <br />MOP SINK <br />MS <br />RECESSED INSTALLATION, 3" BASIN DRAIN W/ SERVICE SINK <br />FIAT PRODUCTS <br />GRACE, 30" HOSE BRACKET: #932-AA, MOP <br />VACUUM BREAKER INTEGRAL WITH THE UNIT. <br />STRAINER <br />PC / PC <br />HANGER: #889-CC <br />WATER HEATER <br />WH <br />STORAGE WATER HEATER. TANK SHALL BE GLASS LINED, 150 PSI <br />AO SMITH <br />#DEL-20, 20 GALLONS, 6.0KW HEATING <br />REFER TO PLUMBING FLAN FOR LOCATION <br />WORKING PRESSURE, DRAIN INDIRECTLY TO MOP SINK BELOW. <br />PC ( PC <br />ELEMENT, 208V/1 P <br />COMMERCIAL ELECTRIC WATER HEAT ER <br />PIPING SUPPORTS <br />WATER HAMMER ARRESTORS <br />PC/PC <br />WATTS/GRAINGER <br />#3A559 <br />CLEANOUTS <br />FCO <br />REFER TO SHEET P-200 <br />____rFLOOR <br />PC/PC <br />J.R. SMITH <br />4000 SERIES <br />REFER TO PLUMBING PLAN FOR LOCATION <br />WALL CLEANOUTS <br />WCO <br />REFER TO SHEET P-200 <br />PC/PC <br />J.R, SMITH <br />4400 SERIES <br />REFER TO PLUMBING PLAN FOR LOCATION <br />TRAP PRIMER VALVE <br />TPV <br />VALVE TO AUTOMATICALLY ADD WATER TO DRAIN LINE TRAP <br />PC / PC <br />PPP, INC <br />PRO1-500 UNDER LAVATORY <br />REFER TO PLUMBING PLAN FOR LOCA I ION <br />RECIRCULATION PUMP <br />RP1 <br />PUMP TO RECIRCULATE HOT WATER RETURN <br />PC/PC <br />BELL & GOSSETT <br />NGF 22U <br />=WATIT,1 PHASE, 3000 RPM, 4 GPM 12 FT WC, WITH AQUASTAT AND UNION. PROVIDE <br />AND REQUIRED ACCESSORIES. <br />RESPONSIBILITY SCHEDULE (PLUMBING) <br />T= TENANT <br />GC= GENERAL CONTRACTOR <br />LL= LANDLORD <br />ER <br />N A= NOT APPLICABLE <br />DIVISION 1500 - PLUMBING <br />SUPL <br />RCV. <br />INSTL <br />EX <br />P & R <br />RELO <br />REMARKS <br />ACCESS PANELS <br />GC <br />GC <br />GC <br />COORDINATE WITH TRADES FOR SIZE AND LOCATION. <br />ROOF WORK <br />PLUMBING FIXTURES <br />GC <br />GC <br />GC <br />GC <br />GC <br />GC <br />GC TO COORD. W/ LANDLORD WHEN REQUIRED <br />OD SINKS, DRAINS, FAUCETS <br />GC <br />GC <br />GC <br />GC TO MAKE FINAL CONNECTIONS <br />FLOOR DRAINS / PIPING / SUPPORTS <br />GC <br />GCIGCI <br />I GC TO CLEAN OUT EXISTING FLOOR DRAINS <br />WATER AND SEWER CONNECTION <br />GC <br />GC <br />GC19 <br />SEE PLUMBING DRAWINGS FOR SCOPE OF WORK _ <br />WATER HEATER <br />GC <br />GC <br />GC11 <br />WATER METER <br />GC <br />GC <br />GC <br />SEE 'GENERAL CONTRACTOR NOTES' ON SHEET G001 <br />Mark Date <br />A <br />Associates <br />C0INSULTING <br />E N G IN E E R S <br />3030 West Streetsboro Road <br />Richfield, Ohio 44286 <br />(330) 659-6688 Phone <br />(330) 659-6675 Fax <br />Architect Job No.: <br />33N2022 <br />Nextore Store Design Revision No.: <br />ISSUE FOR: <br />0 CONSTRUCTION <br />IQ, 111=120m, MU <br />SPECIFICATIONS <br />Date <br />04/19/2022 <br />Drawn By <br />TBA <br />Checked By <br />TQA <br />Sheet <br />h � } <br />