Laserfiche WebLink
LARGE SMALL O.D. <br />EXAM EXAM RECEPTION <br />ONT <br />1 (—)ELECTRICAL - DIMENSIONS <br />SCALE. 1/4" = 1'-0" <br />XX KEY NOTES - DIMENSIONS PLAN <br />1. ELECTRICAL DEVICES FOR FREESTANDING FIXTURES ARE LOCATED ABOVE CEILING NEAR ACCESS PANEL. <br />ROUGH -IN COORDINATION NOTES <br />A. DO NOT ROUGH IN ANY RECEPTACLES OR DATA OUTLETS ON THE SALES FLOOR WITHOUT FIRST CONFIRMING EXACT <br />LOCATION WITH NEXTORE PROJECT MANAGER. OUTLETS ARE DIMENSIONED ACCORDING TO FIXTURE POSITIONING. <br />REFER TO ARCHITECTURAL PLANS FOR EXACT FIXTURE LOCATION. CONTACT NEXTORE PROJECT MANAGER FOR ANY <br />DISCREPANCIES. <br />B. DO NOT PURCHASE FLOOR BOXES WITHOUT FIRST VERIFYING FINISH WITH ARCHITECT (FROM MANUFACTURER'S <br />STANDARD)FOR A PARTICULAR BOX IN A PARTICULAR LOCATION. <br />C. CIRCUITS WERE TAKEN FROM PICTURES OF THE ELECTRICAL PANEL DIRECTORY CARDS. ELECTRICAL CONTRACTOR SHALL <br />REVISE CIRCUITS SHOWN ON THESE PLANS TO WORK WITH EXISTING CIRCUITS THAT MAY EXIST IN THE AREA AS WELL AS <br />CIRCUITS THAT ARE TO REMAIN POWERING EXISTING EQUIPMENT. <br />D. DO NOT INSTALL JUNCTION BOXES (WITH OR WITHOUT COVERS) VISIBLE TO THE PUBLIC IN THE SALES AND PUBLIC BACK <br />OF HOUSE AREAS. IF THIS IS DONE, THE GC IS REQUIRED TO REMOVE THE JUNCTION BOX AT HIS/HER EXPENSE. <br />FLOOR BOXES <br />FINISH (##): X ALUMINUM ❑ BRASS ❑ BLACK ❑ GRAY <br />AS REFERENCED ON THE PLAN SHEETS <br />RECESSED <br />O FLOOR <br />SYSBOX <br />FLOOR BOX <br />H <br />BOX UBBELL <br />O <br />CFBS1R4PFB W/CUP <br />SYSTEMONE <br />SUB PLATES <br />130o <br />0 SUB -PLATE <br />S1R4SP2X2DUPLEX <br />CFBS1R4CVR## <br />COVER / <br />0 (CARPET) <br />FLANGE <br />POKE THRU FITTINGS <br />FINISH (##): X ALUMINUM ❑ BRASS ❑ BLACK ❑ GRAY <br />AS REFERENCED ON THE PLAN SHEETS <br />RECESSED <br />POKE THRU <br />WIREMOLD <br />FITTING <br />EVOLUTION 6AT <br />SERIES POKE THRU <br />TWO DUPLEX <br />SUB PLATES <br />®�® RECEPTACLES AND UP TO <br />FOUR DATA OUTLETS <br />6CTC2##(CARPET)/ <br />COVER / <br />6CT2## (TILE) <br />O <br />FLANGE <br />E D008 IFLOOR BOX / POKE THRU SCHEDULE <br />Ll <br />Construction for: <br />0 <br />Q� <br />Q <br />O in <br />— "q- <br />0 O <br />I � O <br />., C <br />A <br />8J CSS6 <br />N � G <br />- <br />M O <br />� V <br />4- <br />0 <br />n X <br />-0 ::3 <br />= J <br />Ulo <br />Qo <br />Revisions: <br />Mark Date <br />A <br />tr <br />I IIICCI U1 MMUIU <br />• <br />Thorson - Baker <br />- Associates <br />Seal <br />C O N S U L T I N G <br />E N G I N E E R S <br />3030 West Streetsboro Road <br />Richfield, Ohio 44286 <br />(330) 659-6688 Phone <br />(330) 659-6675 Fax <br />1p <br />NAL . <br />Title <br />ELECTRICAL DIMENSIONING <br />PLAN <br />Date` <br />04119/2022 <br />Drawn By <br />TBA <br />Sheet <br />E202 <br />Checked By <br />