SPECIFICATIONS (3 OF 4)
<br />08835 MIRROR
<br />PART 1 - GENERAL
<br />09250 GYPSUM BOARD SYSTEMS D. LAY OUT TILE PATTERN WITH THE STARTING POINT AS INDICATED
<br />09700 LAMINATED WOOD FLOORING
<br />10800 TOILET ROOM ACCESSORIES
<br />A. FURNISH AND INSTALL CUSTOM FITTED MIRRORS INCLUDING
<br />LEVEL 5 GYPSUM BOARD FINISH SPECIFICATION: ON "FINISH PLAN AND SCHEDULE" PAGE, WITH EVEN JOINT ON ALL
<br />PART 1 - GENERAL
<br />PART 1 - GENERAL
<br />MASTIC AND ATTACHMENT CLIPS AS SIZED AND DETAILED IN DRAWINGS
<br />A. ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE EMBEDDED IN FLOOR AND WAIL SURFACES.
<br />A. WOOD LAMINATE FLOORING: REFER TO FINISH AND RESPONSIBILITY
<br />A. GENERAL CONTRACTOR TO SUPPLY A.D.A. APPROVED TOILET
<br />AND RESPONSIBILITY SCHEDULE. REFER TO TOILET ROOM ACCESSORIES
<br />JOINT COMPOUND AND TWO SEPARATE COATS OF JOINT COMPOUND E. CUT AND DRILL TILE AS REQUIRED WITHOUT MARRING TILE, GRIND
<br />SCHEDULE FOR SIZES, COLORS, AND MANUFACTURERS.
<br />ACCESSORIES AND GRAB BARS INCLUDING ALL SET SCREWS AND
<br />FOR TENANT -PROVIDED MIRRORS IN LAVATORY. VERIFY WITH TENANT'S
<br />APPLIED OVER ALL FLAT JOINTS AND ONE SEPARATE COAT OF JOINT AND FIT AROUND FIXTURES, ETC.. LEAVE COMPLETED WORK FREE FROM
<br />B. PREP FLOOR AS RECOMMENDED BY THE MANUFACTURER.
<br />ANCHORS REQUIRED FOR COMPLETE INSTALLATION,
<br />PROJECT MANAGER.
<br />COMPOUND APPLIED OVER INTERIOR ANGLES. FASTENER HEADS AND CRACKED, BROKEN, OR DAMAGED TILE.
<br />C. INSTALL COMPLETE PER MANUFACTURER'S SPECIFICATIONS,
<br />B. CONSULT NAMM (NATIONAL ASSOCIATION OF MIRROR
<br />ACCESSORIES SHALL BE COVERED WITH THREE SEPARATE COATS OF JOINT F. ALL TRANSITIONS BETWEEN NEW AND EXISTING OR UNLIKE FINISHES
<br />INCLUDING ALL TRANSITION STRIPS AND EXPANSION JOINTS AS REQUIRED
<br />PART 2 - PREPARATION / EXECUTION
<br />MANUFACTURING) FOR TIPS FOR CARE AND HANDLING OF MIRRORS.
<br />COMPOUND. A THIN SKIM COAT OF JOINT COMPOUND OR A MATERIAL SHALL BE FLUSH AND SMOOTH. NO REDUCER STRIPS PERMITTED IN
<br />FOR PROPER INSTALLATION.
<br />A. G.C. SHALL INSTALL TOILET ACCESSORY UNITS ACCORDING TO
<br />C. PRODUCT:
<br />MANUFACTURED ESPECIALLY FOR THIS PURPOSE, SHALL BE APPLIED TO STOREFRONT AREA.
<br />MANUFACTURER'S INSTRUCTIONS, USING FASTENERS AND IN WALL
<br />1. CLEAR FLOAT TYPE WITH COPPER/SILVER COATING. UNLESS NOTED
<br />THE ENTIRE SURFACE. THE SURFACE SHALL BE SMOOTH AND FREE OF H. PROTECT HEAVILY TRAVELED, NEWLY TILED AREAS AS REQUIRED.
<br />PART 2 - PREPARATION / EXECUTION
<br />BLOCKING AS RECOMMENDED BY UNIT MANUFACTURER. INSTALL UNITS
<br />OTHERWISE, ALL EDGES SHALL BE POLISHED.
<br />TOOL MARKS AND RIDGES. NOTE: IT IS RECOMMENDED THAT THE 1. INSTALL TILES USING THINSET METHOD WITH 1/16" JOINTS AT WALLS
<br />REFER TO SECTION 03732 "CONCRETE REPAIR /PREPARATION". AND TO
<br />PLUMB AND LEVEL, FIRMLY ANCHORED IN LOCATIONS AND AT HEIGHTS
<br />D. MIRROR ADHESIVE: CHEMICALLY COMPATIBLE WITH MIRROR
<br />PREPARED SURFACE BE COATED WITH A DRYWALL PRIMER PRIOR TO THE AND FLOORS.
<br />SECTION 07200 "INSULATION AND WATERPROOFING"
<br />INDICATED, IN A TAMPERPROOF MANNER WITH SPECIAL HANGERS,
<br />COATING AND WALL SUBSTRATE.
<br />APPLICATION OF FINISH PAINT. J. SEAL/WAX ALL TILE PER MANUFACTURER'S SPECIFICATIONS.
<br />TOGGLE BOLTS, OR SCREWS.
<br />PART 1 - GENERAL
<br />A. GENERAL CONTRACTOR TO RECEIVE AND STORE MATERIAL. G.C.
<br />END OF DIVISION
<br />PART 2 - PREPARATION / EXECUTION
<br />A. FURNISH AND INSTALL ALL GYPSUM DRYWALL AND SYSTEMS 09650 VINYL RESILIENT TILE FLOORING
<br />MUST OPEN BOXES A MINIMUM OF 48 HOURS 1N ADVANCE OF
<br />A. VERIFY AREAS RECEIVING MIRRORS ARE WITHIN TOLERANCES AND
<br />COMPLETE WITH PARTITION FRAMING, CEILING SUSPENSION SYSTEMS PART 1 - GENERAL
<br />INSTALLATION TO ACCLIMATE PRODUCT TO TEMPERATURE AND
<br />DIVISION 11000 -EQUIPMENT
<br />ARE READY TO RECEIVE MATERIAL.
<br />AND RELATED ACCESSORIES, PARTS, MATERIALS, ETC. AS SHOWN ON A. G.C. TO SUPPLY AND INSTALL 1/8" X 12" X 12" VINYL RESILIENT TILES,
<br />HUMIDITY OF AREA TO RECEIVE INSTALLATION.
<br />11001 EQUIPMENT
<br />B. PLACE PLUMB AND LEVEL WITHOUT VISIBLE DISTORTION.
<br />DRAWINGS AND AS SPECIFIED. INSTALL ALL MATERIALS PER AS SHOWN AND SPECIFIED ON THE DRAWINGS.
<br />B. PREPARE SUBFLOOR OR EXISTING FLOOR SYSTEM AS
<br />PART 1 - GENERAL
<br />C. STORE, PROTECT, AND INSTALL MIRRORS IN ACCORDANCE WITH
<br />MANUFACTURERS SPECIFICATIONS, RECOMMENDATIONS, AND IN COMPLY B. INSTALL 4" HIGH X 1/8" THICK, TOP SET, COVED VINYL BASE, AT ALL
<br />RECOMMENDED BY MANUFACTURER,
<br />A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT WORK AND
<br />NAMM.
<br />WITH ALL LOCAL CODES REQUIREMENTS. WALLS IN AREAS TO RECEIVE VINYL TILE FLOORING, AS SPECIFIED ON
<br />C. INSTALL POLYETHYLENE FILM ON CONCRETE SUBFLOOR,
<br />PLACEMENT WITH THE WORK OF ALL OTHER TRADES AND MAKE
<br />D. SET MIRRORS WITH EDGE CLEARANCE FREE OF SURROUNDING
<br />B. GYPSUM DRYWALL: ALL GYPSUM BOARD TO BE 5/8" TYPE "X" AS DRAWINGS:
<br />D. INSTALL "WHISPERWALK".
<br />ADJUSTMENTS AS REQUIRED TO ACCOMMODATE LOCATIONS OF
<br />CONSTRUCTION INCLUDING COUNTERTOPS OR BACKSPLASHES.
<br />NOTED ON NEW CONSTRUCTION PLAN. REST ROOMS TO RECEIVE C. SEE FINISH SCHEDULE FOR SPECIFIC COLORS AND MANUFACTURER.
<br />EQUIPMENT.
<br />E. REMOVE LABELS AFTER WORK IS COMPLETE.
<br />MOISTURE RESISTANT GYPSUM BOARD.
<br />E. PROVIDE ADEQUATE EXPANSION SPACE AT PERIMETER, COLUMNS,
<br />B. ALL EQUIPMENT WORK SHALL COMPLY WITH ALL GOVERNING
<br />F. CLEAN MIRRORS AND ADJACENT SURFACES.
<br />C. FASTENERS: DRYWALL SCREWS OF PROPER SIZE AND TYPE PER PART 2 - PREPARATION / EXECUTION
<br />AND AT ALL ALL OTHER OBSTRUCTIONS.
<br />BUILDING CODES AND LOCAL
<br />MANUFACTURERS RECOMMENDATIONS. REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO
<br />F. INSTALL SPECIFIED BASE OR TRIM AT PERIMETER, COLUMNS, AND AT
<br />C. EQUIPMENT SHALL BE FURNISHED, UNLOADED, UNPACKED OR
<br />END OF DIVISION
<br />D. PROVIDE MATERIALS, JOINT COMPOUNDS, TRIM, EDGES, BEADS, ETC. SECTION 07200 "INSULATION AND WATERPROOFING°
<br />ALL OTHER OBSTRUCTIONS.
<br />UNCRATED AND. PLACED ACCORDING TO THE CONSTRUCTION
<br />FROM A SINGLE SOURCE SUPPLIER. ALL TRIM SHALL CONSIST OF A A. PREP SLAB AS REQUIRED TO RECEIVE NEW VINYL TILE.
<br />G. GENERAL CONTRACTOR TO BROOM CLEAN FLOORING AS IT IS
<br />DOCUMENTS.
<br />09120 CEILING SUSPENSION SYSTEMS
<br />TAPERED, GROOVED, AND PREPUNCHED FIN FOR SCREW ATTACHMENT B. FILL ALL CRACKS, JOINTS, ETC. IN SUB -FLOOR WITH CRACK FILLER
<br />INSTALLED. PROTECT FLOORING IMMEDIATELY WITH BROWN KRAFT
<br />PART 1 - GENERAL
<br />AND TO ACCEPT BONDING AGENT. ALL BUTT JOINTS ARE TO BE NEAT APPROVED BY FLOORING MANUFACTURER. INSTALL ALL MATERIALS WITH
<br />PAPER AND INSTALL MASONITE, ORIENTED STRAND BOARD OR OTHER
<br />PART 2 - PREPARATION / EXECUTION
<br />A. PROVIDE ACOUSTICAL PANEL CEILINGS WITH EXPOSED SUSPENSION
<br />WITH TIGHT JOINTS, AND ALL CORNERS ARE TO BE MITERED: ALL EDGES, WATERPROOF TYPE ADHESIVES AS RECOMMENDED BY FLOORING
<br />PROTECTIVE FLOOR PANELS OVER ENTIRE WOOD FLOOR.
<br />A. GENERAL CONTRACTOR'S INSTALLATION OF TENANT SUPPLIED
<br />GRID, AS SHOWN ON THE DRAWINGS.
<br />BEADS AND TRIM TO BE PRE -FINISH ALUMINUM. MANUFACTURER FOR MATERIALS AND SURFACES INVOLVED.
<br />H. NO FLOORING TO BE EXPOSED UNTIL LAST DAY OF FIXTURING AND
<br />EQUIPMENT IS TO BE INCLUDED IN GENERAL BID.
<br />B. SUSPENSION SYSTEM AND ACOUSTIC PANELS AS LISTED ON
<br />E. JOINT TREATMENT: U.S. GYPSUM OR GOLD BOND SYSTEM OF C. SLOPE FLOOR TILE TO DRAINS. SUBSTRATE MUST ALSO BE SLOPED
<br />MERCHANDISE INSTALLATION.
<br />B. GENERAL CONTRACTOR SHALL NOTIFY THE CONSTRUCTION
<br />REFLECTED CEILING PLAN SHEET AND RESPONSIBILITY SCHEDULE.
<br />COMPOUNDS AND PERFORATED TAPE. TO DRAIN.
<br />I. FLOOR CLEANUP: FOLLOWING COMPLETION OF WORK BY OTHER
<br />MANAGER IMMEDIATELY OF ANYDAMAGE TO THE EQUIPMENT PRIOR TO
<br />C. REFER TO DRAWINGS FOR LOCATION OF SPECIFIED MATERIALS AND
<br />1. ERECT GU\JB IN A SINGLE LAYER WITHVERTICAL BUTT JOINT AND ALL VCT SHALL BE CLEANED, SEALED, AND WAXED BY G.C. PRIOR TO
<br />TRADES, THE PROTECTIVE COVERING PLACED AFTER INSTALLATION
<br />INSTALLATION.
<br />FINISHES. WHERE REQUIRED BY CODES, CEILING ASSEMBLIES ARE TO
<br />WITH ENDS AND EDGES OCCURRING OVER FIRM BEARING. TURNOVER.
<br />p
<br />SHOULD BE REMOVED' FOLLOWED BY SWEEPING, VACUUMING AND/OR
<br />C. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL HOOKUP
<br />CONFORM WITH UNDERWRITERS LABORATORIES DESIGN FOR ONE HOUR
<br />2. WALLS, CEILINGS AND SOFFITS, AND ALL TRANSITIONS IN SAME,
<br />DRY MOPPING TO REMOVE ALL LOOSE DEBRIS.
<br />OF ALL EQUIPMENT, INCLUDING ALL MECHANICAL, PLUMBING AND
<br />FIRE RATED ASSEMBLIES.
<br />SHALL BE 09652 WOOD FLOORING
<br />ELECTRICAL WORK.
<br />GIVEN A SMOOTH FINISH. PART 1 -GENERAL
<br />09910 PAINTING AND FINISHING
<br />D. ALL EQUIPMENT MANUALS, INSTRUCTION BOOKLETS AND
<br />PART 2 - PREPARATION / EXECUTION
<br />3. CORNER BEADS SHALL BE APPLIED TO ALL EXTERNAL ANGLES IN A. FINISHED WOOD FLOOR AS SPECIFIED IN FINISH AND
<br />PART 1 - GENERAL
<br />WARRANTY INFORMATION SHALL BE NEATLY BOUND AND TURNED OVER
<br />A. AT TIME OF COMPLETION, DELIVER TWO PACKAGES OF ACOUSTICAL PANELS
<br />STRICT ACCORDANCE WITH THE MANUFACTURERS DIRECTIONS. INSTALL RESPONSIBILITY SCHEDULES. INSTALLED PER MANUFACTURER'S PRINTED ED
<br />A. THE INTENT IS TO PROVIDE A SATISFACTORY FINISH TO ALL PARTS OF THIS
<br />TO THE CONSTRUCTION MANAGER PRIOR TO THE TURNOVER.
<br />TO THE TENANT OF EACH TYPE OF MATERIAL USED, FOR FUTURE REPLACEMENT USE
<br />INSTRUCTIONS AND RECOMMENDATIONS.
<br />CASING BEADS AT ALL EDGES OF DRYWALL WORK EXCEPT WHERE
<br />PROJECT. FINISH APPEARANCE MUST BE UNIFORM, SMOOTH, AND FREE OF ANY
<br />B. COMPLY WITH ASTM C 635 FOR INTERMEDIATE -DUTY CLASS SYSTEM. SIZE
<br />B. MATERIALS SHALL BE LISTED WITH UNDERWRITERS LABORATORIES
<br />TERMINATION IS COVERED BY OTHER FINISH. CASING BEADS SHALL BE
<br />RUNS, SAGS, AND DEFECTIVE BRUSHING OR SPRAYING. COVER ALL SURFACES
<br />11110 MISCELLANEOUS
<br />ATTACHMENT DEVICES FOR FIVE (5) TIMES DESIGN LOAD. HANGER WIRE SHALL BE
<br />AS TO FIRE AND SLIP RESISTANCE.
<br />MITERED AT CORNERS AND INSTALLED NEATLY, FINISHED WITH
<br />THOROUGHLY IF THE NUMBER OF COATS RECOMMENDED BY MANUFACTURER DOES
<br />NOT ACCOMPLISH THE INTENT, THEN APPLY ADDITIONAL COATS UNTIL COVERAGE
<br />PART 1 - GENERAL
<br />GALVANIZED CARBON STEEL, ASTM A641, SOFT TEMPER, PRE -STRETCHED, 12 GA
<br />C. ARCHITECTURAL TRIM, i.e. REDUCER STRIPS, BANDS, PICKETS, .ETC.,
<br />COMPOUND. NO "CRIMP ON" METHOD TO ATTACHED CORNER BEADS
<br />IS SATISFACTORY. SEE FINISH SCHEDULE FOR PAINT COLORS, MANUFACTURER, ETC.
<br />A. GENERAL CONTRACTOR TO INSTALL FULL HEIGHT, WHITE CORNER
<br />MINIMUM.
<br />SHALL BE OF SAME MANUFACTURER AND FINISH AS WOOD FLOOR.
<br />SHALL BE USED.
<br />B. USE ONLY THE PAINT AND RELATED MATERIALS SPECIFIED BY THE
<br />GUARDS WITH WHITE ADHESIVE, UNLESS OTHERWISE SPECIFIED, WHERE
<br />C. COMPLY WITH MANUFACTURER'S PRINTED INSTRUCTIONS AND WITH
<br />GOVERNING REGULATIONS, FIRE -RESISTANCE RATING REQUIREMENT AND WITH
<br />4. JOINTS BETWEEN BOARDS SHALL BE REINFORCED WITH TAPE
<br />PART 2 -PREPARATION /EXECUTION
<br />MANUFACTURER. SEE FINISH SCHEDULE FOR SPECIFIC COLORS. ALTERNATES ARE
<br />INDICATED ON DRAWINGS.
<br />INDUSTRY STANDARDS APPLICABLE TO THE WORK.
<br />EXCEPT WHERE CONTROL JOINTS ARE REQUIRED. TAPE FIELD JOINTS,
<br />A. GENERAL CONTRACTOR TO RECEIVE AND STORE MATERIAL. G.C.
<br />NOT PERMITTED.
<br />END OF DIVISION
<br />INTERIOR CORNER JOINTS AND WALL TO CEILING JOINTS. FILL JOINTS MUST OPEN BOXES A MINIMUM OF SEVEN DAYS IN ADVANCE OF
<br />D. INSTALL SUSPENSION SYSTEM TO COMPLY WITH ASTM C 636, WITH
<br />WITH JOINT FILLING COMPOUND AND EMBED TAPE THEREIN. COVER TAPE
<br />PART 2 - PREPARATION / EXECUTION
<br />HANGERS SUPPORTED ONLY FROM BUILDING STRUCTURAL MEMBERS.
<br />WITH BEDDING COMPOUND AND TAPER TO FEATHER EDGES. FILL SCREW INSTALLATION TO ACCLIMATE PRODUCT TO TEMPERATURE AND
<br />A. CLEAN ALL SURFACES TO BE PAINTED FREE OF LOOSE DIRT AND DUST BEFORE
<br />LOCATE HANGERS NOT LESS THAN 6" FROM EACH END AND SPACE 4`-0"
<br />HEAD DEPRESSIONS WITH JOINT FILLING COMPOUND AND FEATHER THE HUMIDITY OF AREA TO RECEIVE INSTALLATION.
<br />WORK IS STARTED. WASH ALL METAL SURFACES WITH MINERAL SPIRITS BEFORE
<br />ALONG EACH CARRYING CHANNEL OR DIRECT -HUNG RUNNER. SECURE
<br />EDGES. ALLOW TO DRY.
<br />APPLYING FINISHES. WHERE RUST OR SCALE IS PRESENT, WIRE BRUSH OR SAND
<br />WIRE HANGERS BY LOOPING AND WIRE TYING, EITHER DIRECTLY TO
<br />5. COVER TAPED AND FILLED JOINTS AND FILLED SCREW HEAD REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO
<br />CLEAN BEFORE APPLYING FINISH.
<br />STRUCTURES OR TO INSERTS, OR OTHER DEVICES WHICH
<br />EYE -SCREWS,
<br />DEPRESSIONS WITH TOPPING COMPOUND APPLIED IN THREE COATS. SECTION 07200
<br />B. PAINTED DRYWALL TO RECEIVE ONE COAT LATEX PRIMER AND TWO COATS
<br />ARE SECURE AND APPROPRIATE FOR SUBSTRATE.
<br />PERMITTING THE PREVIOUS COAT TO DRY PRIOR TO INSTALLING THE "INSULATION AND WATERPROOFING"
<br />OF SPECIFIED TINT PRIMER TO APPROXIMATE SHADE OF THE FINAL COAT. TOUCHUP
<br />E. INSTALL EDGE MOLDINGS AT PERIMETER OF ACOUSTICAL CEILING
<br />SUBSEQUENT COAT. B. GENERAL CONTRACTOR TO BROOM CLEAN FLOORING AS IT IS
<br />ALL SUCTION SPOTS OR HOT SPOTS AFTER APPLICATION of FIRST COAT AND
<br />AREA AND AT LOCATIONS WHERE NECESSARY TO CONCEAL EDGES OF
<br />6. SAND JOINT AND SCREW HEAD AREAS LIGHTLY BETWEEN COATS INSTALLED. PROTECT FLOORING IMMEDIATELY WITH KRAFT PAPER AND
<br />BEFORE APPLYING SECOND COAT, TO PRODUCE AND EVEN RESULT IN THE FINISH
<br />ACOUSTICAL UNITS.
<br />AND AFTER THE FINAL COAT SO THAT A SMOOTH LEVEL SURFACE IS INSTALL MASONITE, ORIENTED STRAND BOARD OR OTHER PROTECTIVE
<br />COAT. DRY ALL COATS THOROUGHLY BEFORE APPLYING SUCCEEDING COATS.
<br />FLOOR PANELS OVER ENTIRE WOOD FLOOR. TAPE ALL JOINT IN FLOOR
<br />FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR RECOAT TIME. SEAL ALL
<br />F. INSTALL ACOUSTICAL PANELS IN COORDINATION WITH
<br />PRODUCED WITH THE PAPER SURFACE OF THE WALLBOARD FREE OF
<br />PROTECTION.
<br />DRYWALL SURFACES BEHIND MIRRORS.
<br />SUSPENSION SYSTEM, WITH EDGES CONCEALED BY SUPPORT OF
<br />SCUFFING.
<br />C. NO FLOORING TO BE EXPOSED UNTIL LAST DAY OF FIXTURING AND
<br />C. PUTTY ALL NAIL HOLES, COUNTERSUNK SCREWS, BOLTS, CRACKS, ETC. BEFORE
<br />SUSPENSION ,MEMBERS, SCRIBE AND CUT PANELS TO FIT ACCURATELY AT
<br />F. PATCH AND/OR REPAIR EXISTING DRYWALL TO REMAIN TO LIKE
<br />PROP INS
<br />INSTALLATION.
<br />APPLYING FINISH,
<br />BORDERS AND PENETRATIONS.
<br />NEW CONDITION. LEVEL ANY UNEVEN OR ROUGH SPOTS AND FINISH
<br />DFLOOR
<br />D. CLEAN-UP' FOLLOWING COMPLETION OF WORK BY OTHER
<br />D. SAND ALL WOOD SURFACES SMOOTH AND EVEN BEFORE APPLYING FINISH.
<br />G. INSTALL HOLD-DOWN CLIPS IF REQUIRED BY CODE.
<br />SMOOTH. BULGES AND VISUAL DEPRESSIONS ARE NOT ACCEPTABLE.
<br />TRADES, THE PROTECTIVE COVERING PLACED AFTER INSTALLATION
<br />E. BEFORE STARTING FINISH WORK, REMOVE HARDWARE, ACCESSORIES, PLATES,
<br />H. GWB CEILINGS AND SOFFITS TO BE GIVEN A FLAT AND SMOOTH
<br />G. INSTALL CEMENTITIOUS BACKER BOARD AT ALL AREAS TO RECEIVE TILE OR
<br />SHOULD BE REMOVED; FOLLOWED BY SWEEPING, VACUUMING AND/OR
<br />LIGHTING FIXTURES AND SIMILAR ITEMS, OR PROVIDE AMPLE PROTECTION FOR SUCH
<br />FINISH TO ACCEPT PAINT FINISH. REFER TO SECTION 09250 "GYPSUM
<br />MARBLE, OR AS SHOWN ON DRAWINGS.
<br />ITEMS.
<br />BOARD SYSTEMS".
<br />H. ACCESS PANELS: DRY MOPPING TO REMOVE ALL LOOSE DEBRIS.
<br />F. PAINT ALL EXPOSED PIPING, ACCESS DOORS, VENTS, FIRE EXTINGUISHER
<br />1. G.C. SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED BY
<br />CABINETS, EQUIPMENT MOUNTING BOARDS, ETC, TO MATCH ADJACENT WORK
<br />LANDLORD AND SITE CONDITIONS (COORDINATE SIZE REQUIREMENTS, NUMBER OF 09680 CARPET
<br />UNLESS OTHERWISE NOTED OR DIRECTED,
<br />PANELS REQUIRED AND LOCATIONS WITH LANDLORD AND ALL MECHANICAL PART 1 - GENERAL
<br />TRADES). A. CONDITION CARPET AND ADHESIVES FOR AT LEAST 48 HOURS AT A
<br />G. SAND ENAMELED FINISHES APPLIED TO WOOD OR METAL BETWEEN COATS
<br />2. ACCESS PANELS SHALL BE FLUSH TYPE (NO EXPOSED FLANGES) STYLE AS MINIMUM TEMPERATURE OF 65 DEGREES FAHRENHEIT. THE FLOOR
<br />WITH FINE SANDPAPER TO PRODUCE EVEN SMOOTH FINISH.
<br />MANUFACTURED BY: INTEX FORMS INC. - GLASS FIBER (GFRG) FLUSH ACCESS SHOULD ALSO BE CONDITIONED AT A TEMPERATURE ABOVE 65 DEGREES F
<br />H. MAKE FINISH WORK UNIFORM, SMOOTH, FREE OF RUNS, SAGS AND
<br />PANEL. FOR AT LEAST 24 HOURS PRIOR TO INSTALLATION. THE FLOOR MUST BE
<br />PHONE NUMBER: 916-388-9933, EMAIL ADDRESS; SALES@INTERFORMS.COM
<br />DEFECTIVE BRUSHING OR SPRAYING. MAKE EDGES ADJOINING OTHER
<br />(SIZE AS REQUIRED) SWEPT FREE OF DUST AND DEBRIS.
<br />MATERIALS OR COLORS SHARP AND CLEAN WITHOUT OVERLAPPING.
<br />3. PANELS TO BE FACTORY PRIMED (WHITE) READY TO RECEIVE FINAL FINISH B. DO NOT INSTALL CARPET OVER CONCRETE SLABS UNTIL SLABS
<br />1. SEAL TOPS, BOTTOMS AND EDGES OF ALL DOORS.
<br />PAINT BY G.C. HAVE CURED AND SUFFICIENTLY DRY TO BOND WITH ADHESIVE AND
<br />J. CONTRACTOR TO LEAVE ONE QUART EACH COLOR OF PAINT FOR
<br />CONCRETE HAVE PH RANGE RECOMENDED BY THE MANUFACTURER.
<br />FUTURE TOUCH-UP.
<br />C. UNLESS OTHERWISE INDICATED REMOVE, OLD VINYL TILE OR
<br />K. PRIOR TO CONTRACTOR LEAVING SITE AND AFTER ALL FIXTURES
<br />09300 TILE AND MARBLE LINOLEUM. CLEAR OFF ALL THE DEBRIS, DIRT OR ANYTHING ELSE THAT
<br />ARE INSTALLED AND STORE IS CLEANED, CONTRACTOR TO WALK SITE
<br />PART 1 - GENERAL COULD INTERFERE WITH THE BOND OF ADHESIVE. THE SUBFLOOR
<br />AND TOUCH-UP PAINT DAMAGED DURING FINAL DAYS OF PROJECT.
<br />A. MARBLE/CERAMIC/QUARRY TILE: REFER TO FINISH AND UNDERNEATH THE VINYL SHOULD BE IN GOOD CONDITION AND LEVEL
<br />L. GENERAL CONTRACTOR TO HAVE ONE (1) PAINTER PRESENT AT THE
<br />RESPONSIBILITY SCHEDULE FOR SIZES, COLORS, AND MANUFACTURERS. AS WELL BEFORE TO INSTALL THE NEW FLOOR.
<br />TIME OF THE PUNCH LIST TO PERFORM IMMEDIATE TOUCH-UPS/REPAIRS
<br />B. INSTALL GROUT AS RECOMMENDED BY THE TILE MANUFACTURER. D. REMOVE ANY FINISHES, WAXES, PAINT, ETC. FROM WOOD FLOORS.
<br />AS NEEDED
<br />COLOR OF WALL GROUT TO BE INDICATED ON THE FINISH SCHEDULE. IF THE SURFACE MUST BE LEVEL AND CRACKS MAY REQUIRE A FLASHING
<br />NO COLOR IS INDICATED, A GROUT TO MATCH TILE IS TO BE USED. COMPOUND. PLYWOOD OR PARTICLE BOARD MAY BE NECESSARY TO
<br />END OF DIVISION
<br />C. BASE, SADDLES, AND ACCESSORIES FROM MANUFACTURE (S) IN THE OFFSET UNEVEN FLOORS, BUT MUST BE PRIMED PRIOR TO INSTALLATION.
<br />STYLES, COLORS, SIZES, AND THICKNESS SPECIFIED ON THE DRAWINGS. E. CUT -BACK ADHESIVE MUST BE FLASHED OVER. USING A NOTCHED
<br />DIVISION 10000 - SPECIALTIES
<br />TROWEL, PATCH AND LET CURE. SMOOTH OVER WITH A SECOND COAT
<br />10520 FIRE PROTECTION
<br />PART 2 - PREPARATION / EXECUTION OF PATCH, USING THE FLAT SIDE OF THE TROWEL TO FILL IN THE RIDGES.
<br />PART 1 - GENERAL
<br />REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO ALLOW THE NEWLY FLASHED FLOOR TO CURE.
<br />A. PROVIDE MULTI -PURPOSE CHEMICAL FIRE EXTINGUISHERS CAPABLE OF
<br />SECTION 07200 "INSULATION AND WATERPROOFING" F. GENERAL CONTRACTOR TO VERIFY DESIRED QUANTITY NEEDED,
<br />EXTINGUISHING CLASS A, B, AND C FIRES, IN QUANTITIES AND LOCATIONS REQUIRED
<br />AND ADVISE NEXTORE PM AT EARLIEST OPPORTUNITY (WITHIN 1 WEEK
<br />BY LOCAL FIRE MARSHALL. (COORDINATE IN FIELD.) MANUFACTURER: J.L.
<br />A. BEFORE SETTING ANY TILE, THE CONTRACTOR SHALL ASSURE AFTER BID AWARDING).
<br />INDUSTRIES, COSMIC SERIES OR EQUAL.
<br />HIMSELF THAT NO TILES WILL HAVE TO BE REMOVED AFTER INSTALLATION G. INSTALL PER FLOOR AND WALL FINISH PLAN AND PROVIDE TENANT
<br />ALL EXTINGUISHERS ARE TO BE FURNISHED WITH CURRENT TAGS, INDICATING
<br />TO ACCOMMODATE THE WORK OF OTHER TRADES. ALL CUTTING, WITH SEAM LAYOUT PRIOR TO CUTTING / INSTALLATION.
<br />DATE(S) OF INSTALLATION.
<br />FITTING, DRILLING AND GRINDING OF THE WORK, WHERE NECESSARY IN H. FILL ALL CRACKS, JOINTS, ETC. IN SUB -FLOOR WITH CRACK FILLER
<br />RELATION TO THE WORK OF OTHER TRADES, SHALL BE PERFORMED SO APPROVED BY CARPET MANUFACTURER.
<br />PART 2 - PREPARATION / EXECUTION
<br />THAT THE WORK WILL BE NEATLY AND ACCURATELY DONE AND CUT 1. PROVIDE DIRECT GLUEDOWN INSTALLATION USING MATERIAL AND
<br />A. INSTALL MOUNTING BRACKETS AT HEIGHTS TO COMPLY WITH APPLICABLE
<br />EDGES SHALL BE UNIFORM. METHODS RECOMMENDED BY CARPET MANUFACTURER. SEAL ALL SEAMS
<br />REGULATIONS OF GOVERNING AUTHORITIES.
<br />B. CONFORM TO REQUIREMENTS UNDER AMERICAN NATIONAL WITH SEAM ADHESIVE.
<br />B. SECURE MOUNTING BRACKETS TO STRUCTURE, SQUARE AND PLUMB, TO
<br />STANDARDS INSTITUTE ANSI A-137.1 FOR CERAMIC TILE MATERIAL AND
<br />COMPLY WITH MANUFACTURER'S INSTRUCTIONS.
<br />ANSI A-108 FOR INSTALLATION.
<br />C. INSTALL PER LANDLORD'S SPECIFICATIONS, WHERE APPLICABLE.
<br />STORE 06261
<br />910 CENTER
<br />910 SE EVERETT MALL WAY
<br />Construction for:
<br />0 Q�
<br />�o
<br />0Ln
<br />�,;t
<br />(3 o
<br />MLE
<br />mmm O
<br />0 O
<br />Ob �
<br />4—co
<br />r� 0co
<br />LU 2 ,
<br />Lo
<br />Fq°
<br />� J
<br />V o
<br />LU
<br />Q oCL
<br />Mark Date
<br />1f °i,�(
<br />d
<br />Architect of Record
<br />C 0 R T L A N 0
<br />M 0 R G A N
<br />ARCHITECT
<br />711 N. FIELDER RD.
<br />ARLINGTON, TX 76012
<br />PH: (817) 635-5696
<br />FAX: (817) 635-5699
<br />REGISTERED
<br />ITET
<br />CORTLAND MOWNi
<br />STATE OF WASHIMWON
<br />Nextore Project
<br />Number 86841
<br />Grand Design Type:
<br />PSI 3.0
<br />ISSUED FOR:
<br />0 CONSTRUCTION
<br />_
<br />Title
<br />SPECIFICATIONS
<br />3 OF 4
<br />{ Sheet
<br />
|