SPECIFICATIONS (3 OF 4) <br />08835 MIRROR <br />PART 1 - GENERAL <br />09250 GYPSUM BOARD SYSTEMS D. LAY OUT TILE PATTERN WITH THE STARTING POINT AS INDICATED <br />09700 LAMINATED WOOD FLOORING <br />10800 TOILET ROOM ACCESSORIES <br />A. FURNISH AND INSTALL CUSTOM FITTED MIRRORS INCLUDING <br />LEVEL 5 GYPSUM BOARD FINISH SPECIFICATION: ON "FINISH PLAN AND SCHEDULE" PAGE, WITH EVEN JOINT ON ALL <br />PART 1 - GENERAL <br />PART 1 - GENERAL <br />MASTIC AND ATTACHMENT CLIPS AS SIZED AND DETAILED IN DRAWINGS <br />A. ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE EMBEDDED IN FLOOR AND WAIL SURFACES. <br />A. WOOD LAMINATE FLOORING: REFER TO FINISH AND RESPONSIBILITY <br />A. GENERAL CONTRACTOR TO SUPPLY A.D.A. APPROVED TOILET <br />AND RESPONSIBILITY SCHEDULE. REFER TO TOILET ROOM ACCESSORIES <br />JOINT COMPOUND AND TWO SEPARATE COATS OF JOINT COMPOUND E. CUT AND DRILL TILE AS REQUIRED WITHOUT MARRING TILE, GRIND <br />SCHEDULE FOR SIZES, COLORS, AND MANUFACTURERS. <br />ACCESSORIES AND GRAB BARS INCLUDING ALL SET SCREWS AND <br />FOR TENANT -PROVIDED MIRRORS IN LAVATORY. VERIFY WITH TENANT'S <br />APPLIED OVER ALL FLAT JOINTS AND ONE SEPARATE COAT OF JOINT AND FIT AROUND FIXTURES, ETC.. LEAVE COMPLETED WORK FREE FROM <br />B. PREP FLOOR AS RECOMMENDED BY THE MANUFACTURER. <br />ANCHORS REQUIRED FOR COMPLETE INSTALLATION, <br />PROJECT MANAGER. <br />COMPOUND APPLIED OVER INTERIOR ANGLES. FASTENER HEADS AND CRACKED, BROKEN, OR DAMAGED TILE. <br />C. INSTALL COMPLETE PER MANUFACTURER'S SPECIFICATIONS, <br />B. CONSULT NAMM (NATIONAL ASSOCIATION OF MIRROR <br />ACCESSORIES SHALL BE COVERED WITH THREE SEPARATE COATS OF JOINT F. ALL TRANSITIONS BETWEEN NEW AND EXISTING OR UNLIKE FINISHES <br />INCLUDING ALL TRANSITION STRIPS AND EXPANSION JOINTS AS REQUIRED <br />PART 2 - PREPARATION / EXECUTION <br />MANUFACTURING) FOR TIPS FOR CARE AND HANDLING OF MIRRORS. <br />COMPOUND. A THIN SKIM COAT OF JOINT COMPOUND OR A MATERIAL SHALL BE FLUSH AND SMOOTH. NO REDUCER STRIPS PERMITTED IN <br />FOR PROPER INSTALLATION. <br />A. G.C. SHALL INSTALL TOILET ACCESSORY UNITS ACCORDING TO <br />C. PRODUCT: <br />MANUFACTURED ESPECIALLY FOR THIS PURPOSE, SHALL BE APPLIED TO STOREFRONT AREA. <br />MANUFACTURER'S INSTRUCTIONS, USING FASTENERS AND IN WALL <br />1. CLEAR FLOAT TYPE WITH COPPER/SILVER COATING. UNLESS NOTED <br />THE ENTIRE SURFACE. THE SURFACE SHALL BE SMOOTH AND FREE OF H. PROTECT HEAVILY TRAVELED, NEWLY TILED AREAS AS REQUIRED. <br />PART 2 - PREPARATION / EXECUTION <br />BLOCKING AS RECOMMENDED BY UNIT MANUFACTURER. INSTALL UNITS <br />OTHERWISE, ALL EDGES SHALL BE POLISHED. <br />TOOL MARKS AND RIDGES. NOTE: IT IS RECOMMENDED THAT THE 1. INSTALL TILES USING THINSET METHOD WITH 1/16" JOINTS AT WALLS <br />REFER TO SECTION 03732 "CONCRETE REPAIR /PREPARATION". AND TO <br />PLUMB AND LEVEL, FIRMLY ANCHORED IN LOCATIONS AND AT HEIGHTS <br />D. MIRROR ADHESIVE: CHEMICALLY COMPATIBLE WITH MIRROR <br />PREPARED SURFACE BE COATED WITH A DRYWALL PRIMER PRIOR TO THE AND FLOORS. <br />SECTION 07200 "INSULATION AND WATERPROOFING" <br />INDICATED, IN A TAMPERPROOF MANNER WITH SPECIAL HANGERS, <br />COATING AND WALL SUBSTRATE. <br />APPLICATION OF FINISH PAINT. J. SEAL/WAX ALL TILE PER MANUFACTURER'S SPECIFICATIONS. <br />TOGGLE BOLTS, OR SCREWS. <br />PART 1 - GENERAL <br />A. GENERAL CONTRACTOR TO RECEIVE AND STORE MATERIAL. G.C. <br />END OF DIVISION <br />PART 2 - PREPARATION / EXECUTION <br />A. FURNISH AND INSTALL ALL GYPSUM DRYWALL AND SYSTEMS 09650 VINYL RESILIENT TILE FLOORING <br />MUST OPEN BOXES A MINIMUM OF 48 HOURS 1N ADVANCE OF <br />A. VERIFY AREAS RECEIVING MIRRORS ARE WITHIN TOLERANCES AND <br />COMPLETE WITH PARTITION FRAMING, CEILING SUSPENSION SYSTEMS PART 1 - GENERAL <br />INSTALLATION TO ACCLIMATE PRODUCT TO TEMPERATURE AND <br />DIVISION 11000 -EQUIPMENT <br />ARE READY TO RECEIVE MATERIAL. <br />AND RELATED ACCESSORIES, PARTS, MATERIALS, ETC. AS SHOWN ON A. G.C. TO SUPPLY AND INSTALL 1/8" X 12" X 12" VINYL RESILIENT TILES, <br />HUMIDITY OF AREA TO RECEIVE INSTALLATION. <br />11001 EQUIPMENT <br />B. PLACE PLUMB AND LEVEL WITHOUT VISIBLE DISTORTION. <br />DRAWINGS AND AS SPECIFIED. INSTALL ALL MATERIALS PER AS SHOWN AND SPECIFIED ON THE DRAWINGS. <br />B. PREPARE SUBFLOOR OR EXISTING FLOOR SYSTEM AS <br />PART 1 - GENERAL <br />C. STORE, PROTECT, AND INSTALL MIRRORS IN ACCORDANCE WITH <br />MANUFACTURERS SPECIFICATIONS, RECOMMENDATIONS, AND IN COMPLY B. INSTALL 4" HIGH X 1/8" THICK, TOP SET, COVED VINYL BASE, AT ALL <br />RECOMMENDED BY MANUFACTURER, <br />A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT WORK AND <br />NAMM. <br />WITH ALL LOCAL CODES REQUIREMENTS. WALLS IN AREAS TO RECEIVE VINYL TILE FLOORING, AS SPECIFIED ON <br />C. INSTALL POLYETHYLENE FILM ON CONCRETE SUBFLOOR, <br />PLACEMENT WITH THE WORK OF ALL OTHER TRADES AND MAKE <br />D. SET MIRRORS WITH EDGE CLEARANCE FREE OF SURROUNDING <br />B. GYPSUM DRYWALL: ALL GYPSUM BOARD TO BE 5/8" TYPE "X" AS DRAWINGS: <br />D. INSTALL "WHISPERWALK". <br />ADJUSTMENTS AS REQUIRED TO ACCOMMODATE LOCATIONS OF <br />CONSTRUCTION INCLUDING COUNTERTOPS OR BACKSPLASHES. <br />NOTED ON NEW CONSTRUCTION PLAN. REST ROOMS TO RECEIVE C. SEE FINISH SCHEDULE FOR SPECIFIC COLORS AND MANUFACTURER. <br />EQUIPMENT. <br />E. REMOVE LABELS AFTER WORK IS COMPLETE. <br />MOISTURE RESISTANT GYPSUM BOARD. <br />E. PROVIDE ADEQUATE EXPANSION SPACE AT PERIMETER, COLUMNS, <br />B. ALL EQUIPMENT WORK SHALL COMPLY WITH ALL GOVERNING <br />F. CLEAN MIRRORS AND ADJACENT SURFACES. <br />C. FASTENERS: DRYWALL SCREWS OF PROPER SIZE AND TYPE PER PART 2 - PREPARATION / EXECUTION <br />AND AT ALL ALL OTHER OBSTRUCTIONS. <br />BUILDING CODES AND LOCAL <br />MANUFACTURERS RECOMMENDATIONS. REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO <br />F. INSTALL SPECIFIED BASE OR TRIM AT PERIMETER, COLUMNS, AND AT <br />C. EQUIPMENT SHALL BE FURNISHED, UNLOADED, UNPACKED OR <br />END OF DIVISION <br />D. PROVIDE MATERIALS, JOINT COMPOUNDS, TRIM, EDGES, BEADS, ETC. SECTION 07200 "INSULATION AND WATERPROOFING° <br />ALL OTHER OBSTRUCTIONS. <br />UNCRATED AND. PLACED ACCORDING TO THE CONSTRUCTION <br />FROM A SINGLE SOURCE SUPPLIER. ALL TRIM SHALL CONSIST OF A A. PREP SLAB AS REQUIRED TO RECEIVE NEW VINYL TILE. <br />G. GENERAL CONTRACTOR TO BROOM CLEAN FLOORING AS IT IS <br />DOCUMENTS. <br />09120 CEILING SUSPENSION SYSTEMS <br />TAPERED, GROOVED, AND PREPUNCHED FIN FOR SCREW ATTACHMENT B. FILL ALL CRACKS, JOINTS, ETC. IN SUB -FLOOR WITH CRACK FILLER <br />INSTALLED. PROTECT FLOORING IMMEDIATELY WITH BROWN KRAFT <br />PART 1 - GENERAL <br />AND TO ACCEPT BONDING AGENT. ALL BUTT JOINTS ARE TO BE NEAT APPROVED BY FLOORING MANUFACTURER. INSTALL ALL MATERIALS WITH <br />PAPER AND INSTALL MASONITE, ORIENTED STRAND BOARD OR OTHER <br />PART 2 - PREPARATION / EXECUTION <br />A. PROVIDE ACOUSTICAL PANEL CEILINGS WITH EXPOSED SUSPENSION <br />WITH TIGHT JOINTS, AND ALL CORNERS ARE TO BE MITERED: ALL EDGES, WATERPROOF TYPE ADHESIVES AS RECOMMENDED BY FLOORING <br />PROTECTIVE FLOOR PANELS OVER ENTIRE WOOD FLOOR. <br />A. GENERAL CONTRACTOR'S INSTALLATION OF TENANT SUPPLIED <br />GRID, AS SHOWN ON THE DRAWINGS. <br />BEADS AND TRIM TO BE PRE -FINISH ALUMINUM. MANUFACTURER FOR MATERIALS AND SURFACES INVOLVED. <br />H. NO FLOORING TO BE EXPOSED UNTIL LAST DAY OF FIXTURING AND <br />EQUIPMENT IS TO BE INCLUDED IN GENERAL BID. <br />B. SUSPENSION SYSTEM AND ACOUSTIC PANELS AS LISTED ON <br />E. JOINT TREATMENT: U.S. GYPSUM OR GOLD BOND SYSTEM OF C. SLOPE FLOOR TILE TO DRAINS. SUBSTRATE MUST ALSO BE SLOPED <br />MERCHANDISE INSTALLATION. <br />B. GENERAL CONTRACTOR SHALL NOTIFY THE CONSTRUCTION <br />REFLECTED CEILING PLAN SHEET AND RESPONSIBILITY SCHEDULE. <br />COMPOUNDS AND PERFORATED TAPE. TO DRAIN. <br />I. FLOOR CLEANUP: FOLLOWING COMPLETION OF WORK BY OTHER <br />MANAGER IMMEDIATELY OF ANYDAMAGE TO THE EQUIPMENT PRIOR TO <br />C. REFER TO DRAWINGS FOR LOCATION OF SPECIFIED MATERIALS AND <br />1. ERECT GU\JB IN A SINGLE LAYER WITHVERTICAL BUTT JOINT AND ALL VCT SHALL BE CLEANED, SEALED, AND WAXED BY G.C. PRIOR TO <br />TRADES, THE PROTECTIVE COVERING PLACED AFTER INSTALLATION <br />INSTALLATION. <br />FINISHES. WHERE REQUIRED BY CODES, CEILING ASSEMBLIES ARE TO <br />WITH ENDS AND EDGES OCCURRING OVER FIRM BEARING. TURNOVER. <br />p <br />SHOULD BE REMOVED' FOLLOWED BY SWEEPING, VACUUMING AND/OR <br />C. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL HOOKUP <br />CONFORM WITH UNDERWRITERS LABORATORIES DESIGN FOR ONE HOUR <br />2. WALLS, CEILINGS AND SOFFITS, AND ALL TRANSITIONS IN SAME, <br />DRY MOPPING TO REMOVE ALL LOOSE DEBRIS. <br />OF ALL EQUIPMENT, INCLUDING ALL MECHANICAL, PLUMBING AND <br />FIRE RATED ASSEMBLIES. <br />SHALL BE 09652 WOOD FLOORING <br />ELECTRICAL WORK. <br />GIVEN A SMOOTH FINISH. PART 1 -GENERAL <br />09910 PAINTING AND FINISHING <br />D. ALL EQUIPMENT MANUALS, INSTRUCTION BOOKLETS AND <br />PART 2 - PREPARATION / EXECUTION <br />3. CORNER BEADS SHALL BE APPLIED TO ALL EXTERNAL ANGLES IN A. FINISHED WOOD FLOOR AS SPECIFIED IN FINISH AND <br />PART 1 - GENERAL <br />WARRANTY INFORMATION SHALL BE NEATLY BOUND AND TURNED OVER <br />A. AT TIME OF COMPLETION, DELIVER TWO PACKAGES OF ACOUSTICAL PANELS <br />STRICT ACCORDANCE WITH THE MANUFACTURERS DIRECTIONS. INSTALL RESPONSIBILITY SCHEDULES. INSTALLED PER MANUFACTURER'S PRINTED ED <br />A. THE INTENT IS TO PROVIDE A SATISFACTORY FINISH TO ALL PARTS OF THIS <br />TO THE CONSTRUCTION MANAGER PRIOR TO THE TURNOVER. <br />TO THE TENANT OF EACH TYPE OF MATERIAL USED, FOR FUTURE REPLACEMENT USE <br />INSTRUCTIONS AND RECOMMENDATIONS. <br />CASING BEADS AT ALL EDGES OF DRYWALL WORK EXCEPT WHERE <br />PROJECT. FINISH APPEARANCE MUST BE UNIFORM, SMOOTH, AND FREE OF ANY <br />B. COMPLY WITH ASTM C 635 FOR INTERMEDIATE -DUTY CLASS SYSTEM. SIZE <br />B. MATERIALS SHALL BE LISTED WITH UNDERWRITERS LABORATORIES <br />TERMINATION IS COVERED BY OTHER FINISH. CASING BEADS SHALL BE <br />RUNS, SAGS, AND DEFECTIVE BRUSHING OR SPRAYING. COVER ALL SURFACES <br />11110 MISCELLANEOUS <br />ATTACHMENT DEVICES FOR FIVE (5) TIMES DESIGN LOAD. HANGER WIRE SHALL BE <br />AS TO FIRE AND SLIP RESISTANCE. <br />MITERED AT CORNERS AND INSTALLED NEATLY, FINISHED WITH <br />THOROUGHLY IF THE NUMBER OF COATS RECOMMENDED BY MANUFACTURER DOES <br />NOT ACCOMPLISH THE INTENT, THEN APPLY ADDITIONAL COATS UNTIL COVERAGE <br />PART 1 - GENERAL <br />GALVANIZED CARBON STEEL, ASTM A641, SOFT TEMPER, PRE -STRETCHED, 12 GA <br />C. ARCHITECTURAL TRIM, i.e. REDUCER STRIPS, BANDS, PICKETS, .ETC., <br />COMPOUND. NO "CRIMP ON" METHOD TO ATTACHED CORNER BEADS <br />IS SATISFACTORY. SEE FINISH SCHEDULE FOR PAINT COLORS, MANUFACTURER, ETC. <br />A. GENERAL CONTRACTOR TO INSTALL FULL HEIGHT, WHITE CORNER <br />MINIMUM. <br />SHALL BE OF SAME MANUFACTURER AND FINISH AS WOOD FLOOR. <br />SHALL BE USED. <br />B. USE ONLY THE PAINT AND RELATED MATERIALS SPECIFIED BY THE <br />GUARDS WITH WHITE ADHESIVE, UNLESS OTHERWISE SPECIFIED, WHERE <br />C. COMPLY WITH MANUFACTURER'S PRINTED INSTRUCTIONS AND WITH <br />GOVERNING REGULATIONS, FIRE -RESISTANCE RATING REQUIREMENT AND WITH <br />4. JOINTS BETWEEN BOARDS SHALL BE REINFORCED WITH TAPE <br />PART 2 -PREPARATION /EXECUTION <br />MANUFACTURER. SEE FINISH SCHEDULE FOR SPECIFIC COLORS. ALTERNATES ARE <br />INDICATED ON DRAWINGS. <br />INDUSTRY STANDARDS APPLICABLE TO THE WORK. <br />EXCEPT WHERE CONTROL JOINTS ARE REQUIRED. TAPE FIELD JOINTS, <br />A. GENERAL CONTRACTOR TO RECEIVE AND STORE MATERIAL. G.C. <br />NOT PERMITTED. <br />END OF DIVISION <br />INTERIOR CORNER JOINTS AND WALL TO CEILING JOINTS. FILL JOINTS MUST OPEN BOXES A MINIMUM OF SEVEN DAYS IN ADVANCE OF <br />D. INSTALL SUSPENSION SYSTEM TO COMPLY WITH ASTM C 636, WITH <br />WITH JOINT FILLING COMPOUND AND EMBED TAPE THEREIN. COVER TAPE <br />PART 2 - PREPARATION / EXECUTION <br />HANGERS SUPPORTED ONLY FROM BUILDING STRUCTURAL MEMBERS. <br />WITH BEDDING COMPOUND AND TAPER TO FEATHER EDGES. FILL SCREW INSTALLATION TO ACCLIMATE PRODUCT TO TEMPERATURE AND <br />A. CLEAN ALL SURFACES TO BE PAINTED FREE OF LOOSE DIRT AND DUST BEFORE <br />LOCATE HANGERS NOT LESS THAN 6" FROM EACH END AND SPACE 4`-0" <br />HEAD DEPRESSIONS WITH JOINT FILLING COMPOUND AND FEATHER THE HUMIDITY OF AREA TO RECEIVE INSTALLATION. <br />WORK IS STARTED. WASH ALL METAL SURFACES WITH MINERAL SPIRITS BEFORE <br />ALONG EACH CARRYING CHANNEL OR DIRECT -HUNG RUNNER. SECURE <br />EDGES. ALLOW TO DRY. <br />APPLYING FINISHES. WHERE RUST OR SCALE IS PRESENT, WIRE BRUSH OR SAND <br />WIRE HANGERS BY LOOPING AND WIRE TYING, EITHER DIRECTLY TO <br />5. COVER TAPED AND FILLED JOINTS AND FILLED SCREW HEAD REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO <br />CLEAN BEFORE APPLYING FINISH. <br />STRUCTURES OR TO INSERTS, OR OTHER DEVICES WHICH <br />EYE -SCREWS, <br />DEPRESSIONS WITH TOPPING COMPOUND APPLIED IN THREE COATS. SECTION 07200 <br />B. PAINTED DRYWALL TO RECEIVE ONE COAT LATEX PRIMER AND TWO COATS <br />ARE SECURE AND APPROPRIATE FOR SUBSTRATE. <br />PERMITTING THE PREVIOUS COAT TO DRY PRIOR TO INSTALLING THE "INSULATION AND WATERPROOFING" <br />OF SPECIFIED TINT PRIMER TO APPROXIMATE SHADE OF THE FINAL COAT. TOUCHUP <br />E. INSTALL EDGE MOLDINGS AT PERIMETER OF ACOUSTICAL CEILING <br />SUBSEQUENT COAT. B. GENERAL CONTRACTOR TO BROOM CLEAN FLOORING AS IT IS <br />ALL SUCTION SPOTS OR HOT SPOTS AFTER APPLICATION of FIRST COAT AND <br />AREA AND AT LOCATIONS WHERE NECESSARY TO CONCEAL EDGES OF <br />6. SAND JOINT AND SCREW HEAD AREAS LIGHTLY BETWEEN COATS INSTALLED. PROTECT FLOORING IMMEDIATELY WITH KRAFT PAPER AND <br />BEFORE APPLYING SECOND COAT, TO PRODUCE AND EVEN RESULT IN THE FINISH <br />ACOUSTICAL UNITS. <br />AND AFTER THE FINAL COAT SO THAT A SMOOTH LEVEL SURFACE IS INSTALL MASONITE, ORIENTED STRAND BOARD OR OTHER PROTECTIVE <br />COAT. DRY ALL COATS THOROUGHLY BEFORE APPLYING SUCCEEDING COATS. <br />FLOOR PANELS OVER ENTIRE WOOD FLOOR. TAPE ALL JOINT IN FLOOR <br />FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR RECOAT TIME. SEAL ALL <br />F. INSTALL ACOUSTICAL PANELS IN COORDINATION WITH <br />PRODUCED WITH THE PAPER SURFACE OF THE WALLBOARD FREE OF <br />PROTECTION. <br />DRYWALL SURFACES BEHIND MIRRORS. <br />SUSPENSION SYSTEM, WITH EDGES CONCEALED BY SUPPORT OF <br />SCUFFING. <br />C. NO FLOORING TO BE EXPOSED UNTIL LAST DAY OF FIXTURING AND <br />C. PUTTY ALL NAIL HOLES, COUNTERSUNK SCREWS, BOLTS, CRACKS, ETC. BEFORE <br />SUSPENSION ,MEMBERS, SCRIBE AND CUT PANELS TO FIT ACCURATELY AT <br />F. PATCH AND/OR REPAIR EXISTING DRYWALL TO REMAIN TO LIKE <br />PROP INS <br />INSTALLATION. <br />APPLYING FINISH, <br />BORDERS AND PENETRATIONS. <br />NEW CONDITION. LEVEL ANY UNEVEN OR ROUGH SPOTS AND FINISH <br />DFLOOR <br />D. CLEAN-UP' FOLLOWING COMPLETION OF WORK BY OTHER <br />D. SAND ALL WOOD SURFACES SMOOTH AND EVEN BEFORE APPLYING FINISH. <br />G. INSTALL HOLD-DOWN CLIPS IF REQUIRED BY CODE. <br />SMOOTH. BULGES AND VISUAL DEPRESSIONS ARE NOT ACCEPTABLE. <br />TRADES, THE PROTECTIVE COVERING PLACED AFTER INSTALLATION <br />E. BEFORE STARTING FINISH WORK, REMOVE HARDWARE, ACCESSORIES, PLATES, <br />H. GWB CEILINGS AND SOFFITS TO BE GIVEN A FLAT AND SMOOTH <br />G. INSTALL CEMENTITIOUS BACKER BOARD AT ALL AREAS TO RECEIVE TILE OR <br />SHOULD BE REMOVED; FOLLOWED BY SWEEPING, VACUUMING AND/OR <br />LIGHTING FIXTURES AND SIMILAR ITEMS, OR PROVIDE AMPLE PROTECTION FOR SUCH <br />FINISH TO ACCEPT PAINT FINISH. REFER TO SECTION 09250 "GYPSUM <br />MARBLE, OR AS SHOWN ON DRAWINGS. <br />ITEMS. <br />BOARD SYSTEMS". <br />H. ACCESS PANELS: DRY MOPPING TO REMOVE ALL LOOSE DEBRIS. <br />F. PAINT ALL EXPOSED PIPING, ACCESS DOORS, VENTS, FIRE EXTINGUISHER <br />1. G.C. SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED BY <br />CABINETS, EQUIPMENT MOUNTING BOARDS, ETC, TO MATCH ADJACENT WORK <br />LANDLORD AND SITE CONDITIONS (COORDINATE SIZE REQUIREMENTS, NUMBER OF 09680 CARPET <br />UNLESS OTHERWISE NOTED OR DIRECTED, <br />PANELS REQUIRED AND LOCATIONS WITH LANDLORD AND ALL MECHANICAL PART 1 - GENERAL <br />TRADES). A. CONDITION CARPET AND ADHESIVES FOR AT LEAST 48 HOURS AT A <br />G. SAND ENAMELED FINISHES APPLIED TO WOOD OR METAL BETWEEN COATS <br />2. ACCESS PANELS SHALL BE FLUSH TYPE (NO EXPOSED FLANGES) STYLE AS MINIMUM TEMPERATURE OF 65 DEGREES FAHRENHEIT. THE FLOOR <br />WITH FINE SANDPAPER TO PRODUCE EVEN SMOOTH FINISH. <br />MANUFACTURED BY: INTEX FORMS INC. - GLASS FIBER (GFRG) FLUSH ACCESS SHOULD ALSO BE CONDITIONED AT A TEMPERATURE ABOVE 65 DEGREES F <br />H. MAKE FINISH WORK UNIFORM, SMOOTH, FREE OF RUNS, SAGS AND <br />PANEL. FOR AT LEAST 24 HOURS PRIOR TO INSTALLATION. THE FLOOR MUST BE <br />PHONE NUMBER: 916-388-9933, EMAIL ADDRESS; SALES@INTERFORMS.COM <br />DEFECTIVE BRUSHING OR SPRAYING. MAKE EDGES ADJOINING OTHER <br />(SIZE AS REQUIRED) SWEPT FREE OF DUST AND DEBRIS. <br />MATERIALS OR COLORS SHARP AND CLEAN WITHOUT OVERLAPPING. <br />3. PANELS TO BE FACTORY PRIMED (WHITE) READY TO RECEIVE FINAL FINISH B. DO NOT INSTALL CARPET OVER CONCRETE SLABS UNTIL SLABS <br />1. SEAL TOPS, BOTTOMS AND EDGES OF ALL DOORS. <br />PAINT BY G.C. HAVE CURED AND SUFFICIENTLY DRY TO BOND WITH ADHESIVE AND <br />J. CONTRACTOR TO LEAVE ONE QUART EACH COLOR OF PAINT FOR <br />CONCRETE HAVE PH RANGE RECOMENDED BY THE MANUFACTURER. <br />FUTURE TOUCH-UP. <br />C. UNLESS OTHERWISE INDICATED REMOVE, OLD VINYL TILE OR <br />K. PRIOR TO CONTRACTOR LEAVING SITE AND AFTER ALL FIXTURES <br />09300 TILE AND MARBLE LINOLEUM. CLEAR OFF ALL THE DEBRIS, DIRT OR ANYTHING ELSE THAT <br />ARE INSTALLED AND STORE IS CLEANED, CONTRACTOR TO WALK SITE <br />PART 1 - GENERAL COULD INTERFERE WITH THE BOND OF ADHESIVE. THE SUBFLOOR <br />AND TOUCH-UP PAINT DAMAGED DURING FINAL DAYS OF PROJECT. <br />A. MARBLE/CERAMIC/QUARRY TILE: REFER TO FINISH AND UNDERNEATH THE VINYL SHOULD BE IN GOOD CONDITION AND LEVEL <br />L. GENERAL CONTRACTOR TO HAVE ONE (1) PAINTER PRESENT AT THE <br />RESPONSIBILITY SCHEDULE FOR SIZES, COLORS, AND MANUFACTURERS. AS WELL BEFORE TO INSTALL THE NEW FLOOR. <br />TIME OF THE PUNCH LIST TO PERFORM IMMEDIATE TOUCH-UPS/REPAIRS <br />B. INSTALL GROUT AS RECOMMENDED BY THE TILE MANUFACTURER. D. REMOVE ANY FINISHES, WAXES, PAINT, ETC. FROM WOOD FLOORS. <br />AS NEEDED <br />COLOR OF WALL GROUT TO BE INDICATED ON THE FINISH SCHEDULE. IF THE SURFACE MUST BE LEVEL AND CRACKS MAY REQUIRE A FLASHING <br />NO COLOR IS INDICATED, A GROUT TO MATCH TILE IS TO BE USED. COMPOUND. PLYWOOD OR PARTICLE BOARD MAY BE NECESSARY TO <br />END OF DIVISION <br />C. BASE, SADDLES, AND ACCESSORIES FROM MANUFACTURE (S) IN THE OFFSET UNEVEN FLOORS, BUT MUST BE PRIMED PRIOR TO INSTALLATION. <br />STYLES, COLORS, SIZES, AND THICKNESS SPECIFIED ON THE DRAWINGS. E. CUT -BACK ADHESIVE MUST BE FLASHED OVER. USING A NOTCHED <br />DIVISION 10000 - SPECIALTIES <br />TROWEL, PATCH AND LET CURE. SMOOTH OVER WITH A SECOND COAT <br />10520 FIRE PROTECTION <br />PART 2 - PREPARATION / EXECUTION OF PATCH, USING THE FLAT SIDE OF THE TROWEL TO FILL IN THE RIDGES. <br />PART 1 - GENERAL <br />REFER TO SECTION 03732 "CONCRETE REPAIR / PREPARATION". AND TO ALLOW THE NEWLY FLASHED FLOOR TO CURE. <br />A. PROVIDE MULTI -PURPOSE CHEMICAL FIRE EXTINGUISHERS CAPABLE OF <br />SECTION 07200 "INSULATION AND WATERPROOFING" F. GENERAL CONTRACTOR TO VERIFY DESIRED QUANTITY NEEDED, <br />EXTINGUISHING CLASS A, B, AND C FIRES, IN QUANTITIES AND LOCATIONS REQUIRED <br />AND ADVISE NEXTORE PM AT EARLIEST OPPORTUNITY (WITHIN 1 WEEK <br />BY LOCAL FIRE MARSHALL. (COORDINATE IN FIELD.) MANUFACTURER: J.L. <br />A. BEFORE SETTING ANY TILE, THE CONTRACTOR SHALL ASSURE AFTER BID AWARDING). <br />INDUSTRIES, COSMIC SERIES OR EQUAL. <br />HIMSELF THAT NO TILES WILL HAVE TO BE REMOVED AFTER INSTALLATION G. INSTALL PER FLOOR AND WALL FINISH PLAN AND PROVIDE TENANT <br />ALL EXTINGUISHERS ARE TO BE FURNISHED WITH CURRENT TAGS, INDICATING <br />TO ACCOMMODATE THE WORK OF OTHER TRADES. ALL CUTTING, WITH SEAM LAYOUT PRIOR TO CUTTING / INSTALLATION. <br />DATE(S) OF INSTALLATION. <br />FITTING, DRILLING AND GRINDING OF THE WORK, WHERE NECESSARY IN H. FILL ALL CRACKS, JOINTS, ETC. IN SUB -FLOOR WITH CRACK FILLER <br />RELATION TO THE WORK OF OTHER TRADES, SHALL BE PERFORMED SO APPROVED BY CARPET MANUFACTURER. <br />PART 2 - PREPARATION / EXECUTION <br />THAT THE WORK WILL BE NEATLY AND ACCURATELY DONE AND CUT 1. PROVIDE DIRECT GLUEDOWN INSTALLATION USING MATERIAL AND <br />A. INSTALL MOUNTING BRACKETS AT HEIGHTS TO COMPLY WITH APPLICABLE <br />EDGES SHALL BE UNIFORM. METHODS RECOMMENDED BY CARPET MANUFACTURER. SEAL ALL SEAMS <br />REGULATIONS OF GOVERNING AUTHORITIES. <br />B. CONFORM TO REQUIREMENTS UNDER AMERICAN NATIONAL WITH SEAM ADHESIVE. <br />B. SECURE MOUNTING BRACKETS TO STRUCTURE, SQUARE AND PLUMB, TO <br />STANDARDS INSTITUTE ANSI A-137.1 FOR CERAMIC TILE MATERIAL AND <br />COMPLY WITH MANUFACTURER'S INSTRUCTIONS. <br />ANSI A-108 FOR INSTALLATION. <br />C. INSTALL PER LANDLORD'S SPECIFICATIONS, WHERE APPLICABLE. <br />STORE 06261 <br />910 CENTER <br />910 SE EVERETT MALL WAY <br />Construction for: <br />0 Q� <br />�o <br />0Ln <br />�,;t <br />(3 o <br />MLE <br />mmm O <br />0 O <br />Ob � <br />4—co <br />r� 0co <br />LU 2 , <br />Lo <br />Fq° <br />� J <br />V o <br />LU <br />Q oCL <br />Mark Date <br />1f °i,�( <br />d <br />Architect of Record <br />C 0 R T L A N 0 <br />M 0 R G A N <br />ARCHITECT <br />711 N. FIELDER RD. <br />ARLINGTON, TX 76012 <br />PH: (817) 635-5696 <br />FAX: (817) 635-5699 <br />REGISTERED <br />ITET <br />CORTLAND MOWNi <br />STATE OF WASHIMWON <br />Nextore Project <br />Number 86841 <br />Grand Design Type: <br />PSI 3.0 <br />ISSUED FOR: <br />0 CONSTRUCTION <br />_ <br />Title <br />SPECIFICATIONS <br />3 OF 4 <br />{ Sheet <br />