DIVISION 15000A - PLUMBING
<br />PART 1 - GENERAL
<br />DIVISION 15000B - MECHANICAL
<br />I. GENERAL PROVISIONS
<br />A. GENERAL CONDITIONS, CODES & STANDARDS
<br />A. GENERAL CONDITIONS, CODES &STANDARDS
<br />B
<br />1. ALL WORK SHOWN ON THE PLUMBING DOCUMENTS IS TO BE PROVIDED AND INSTALLED BY
<br />THE PLUMBING CONTRACTOR, UNLESS NOTED OTHERWISE.
<br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE
<br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT,
<br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION,
<br />3. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS
<br />AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL
<br />REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED
<br />FEES OR COSTS.
<br />SCOPE OF WORK
<br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE PLUMBING CONTRACTOR
<br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELI ANEOUS
<br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE PLUMBING CONTRACTOR'S SCOPE
<br />- ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS SUCH.
<br />2. . DURING BIDDING:
<br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE
<br />SCOPE AS A RESULT.
<br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL
<br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE WORK
<br />WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED.
<br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR
<br />DIRECTIONS THAT YOU HAVE IDENTIFIED.
<br />C. DOCUMENTS
<br />1.ALL WORK SHOWN ON THE MECHANICAL DOCUMENTS IS TO BE PROVIDED AND INSTALLED
<br />BY THE PLUMBING CONTRACTOR, UNLESS NOTED OTHERWISE.
<br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE
<br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT.
<br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION.
<br />3. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES,
<br />PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE
<br />ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR
<br />ASSOCIATED FEES OR COSTS.
<br />B. SCOPE OF WORK
<br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE MECHANICAL CONTRACTOR
<br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELLANEOUS
<br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE MECHANICAL CONTRACTOR'S
<br />SCOPE - ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS
<br />SUCH,
<br />2. DURING BIDDING:
<br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE
<br />SCOPE AS A RESULT.
<br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL
<br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE
<br />WORK WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED.
<br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR
<br />`.SUBSTITUTIONS DIRECTIONS THAT YOU HAVE IDENTIFIED.
<br />1.1. THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT
<br />DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL OF C. DOCUMENTS
<br />QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE 1.SUBSTITUTIONS
<br />EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED. 1.1, THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT
<br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL
<br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE
<br />THESE SPECIFICATIONS. EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED.
<br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY
<br />D. CONSTRUCTION COORDINATION RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET
<br />IN THESE SPECIFICATIONS.
<br />`.DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL CONTRACTOR TO
<br />COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS. THIS WORK SHALL BE PROVIDED
<br />AT NO ADDITIONAL COST TO THE TENANT. D. CONSTRUCTION COORDINATION
<br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES
<br />WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA
<br />CAUTION IN THE PERFORMANCE_ OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL
<br />COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE GENERAL
<br />CONTRACTOR CAUSING THE DAMAGE.
<br />PART 2 - MATERIALS
<br />A. GENERAL
<br />1. PROVIDE STOP VALVES AT EVERY FIXTURE ON BOTH HOT AND
<br />COLD WATER SUPPLY LINES. VALVES, ESCUTCHEONS, FITTINGS, ETC. MUST
<br />BE CHROME PLATED. WHERE EXPOSED, CHROME PLATED PIPE IS TO BE
<br />USED.
<br />2. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS
<br />PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP
<br />(ASJ/SSL).
<br />2.1 DOMESTIC HOT AND COLD WATER PIPING UP TO 3/4 INCH DIAMETER -
<br />1/2 INCH THICK
<br />2.2 FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED
<br />FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING
<br />COVER.
<br />PART 3 - EXECUTION
<br />A. GENERAL
<br />1. THE ENTIRE PLUMBING INSTALLATION, MATERIALS, EQUIPMENT, ETC.
<br />SHALL CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED
<br />CODES AND STANDARDS.
<br />1.1. VERIFY FINAL ROUGH IN WITH ARCHITECT PRIOR TO WALL
<br />INSTALLATION.
<br />2. PIPING IS TO BE INSTALLED CONCEALED - SURFACE MOUNTED
<br />PIPING IN FINISHED AREAS IS NOT ACCEPTABLE.
<br />3. ALL EXPOSED OR ACCESSIBLE P-TRAPS MUST BE PROVIDED WITH
<br />BOTTOM CLEANOUT PLUGS.
<br />4. INSULATE EXPOSED P-TRAPS, HOT AND COLD VALVES AND PIPING
<br />SERVING HANDICAPPED LAVATORIES.
<br />5. IF SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR
<br />PLENUM. CONSTRUCTION MATERIALS ABOVE CEILING SHALL BE
<br />NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50
<br />SMOKE DEVELOPMENT FINISH RATING. WIRING SHALL BE LABELED PLENUM
<br />RATED TYPE PER NFPA 70.
<br />6. ALL CLEANOUTS ARE TO BE INSTALLED FLUSH WITH THE FINISHED
<br />FLOOR OR WALL.
<br />B. INSULATION
<br />1. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS,
<br />FLOORS, HANGERS AND SIMILAR PENETRATIONS:
<br />2. MAINTAIN ACCESS TO VALVES
<br />`.DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL CONTRACTOR TO
<br />COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS. THIS WORK SHALL BE
<br />PROVIDED AT NO ADDITIONAL COST TO THE TENANT.
<br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING
<br />SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE
<br />EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH
<br />FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE
<br />GENERAL CONTRACTOR CAUSING THE DAMAGE.
<br />II. INSULATION
<br />A. GENERAL
<br />I. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS,
<br />FLOORS, HANGERS AND SIMILAR PENETRATIONS.
<br />2. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES.
<br />3. INSULATION SHALT_ BE BY OWENS-CORNING, KNAUF, OR MANVILLE.
<br />4. ALL DUCTWORK AND PIPING SHALL BE INSULATED
<br />VI. AIR DISTRIBUTION
<br />A. AIR DISTRIBUTION
<br />I. DUCTWORK (ROUND OR RECTANGULAR OR SPIRAL) SHALL BE OF
<br />GALVANIZED STEEL CONSTRUCTION AND SHALL BE INSTALLED IN
<br />ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA MANUAL AND
<br />SEALED.
<br />2. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION
<br />WITH A MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15DEGREES
<br />3. FINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE
<br />DUCTWORK BUT IT'S USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL
<br />RUNS. ALL CHANGES OF DIRECTION IN A DUCT SYSTEM (GALVANIZED OR
<br />FLEXIBLE) SHALL BE MADE WITH AN APPROPRIATE GALVANIZED ELBOW.
<br />MAXIMUM LENGTH OF ANY FLEXIBLE DUCT IS 5'-0".
<br />4, FLEXIBLE DUCTS TO DIFFUSERS: MAXIMUM LENGTH OF FLEXIBLE DUCT
<br />TO DIFFUSER TO BE 5'-0".
<br />VIII. TESTING AND BALANCING
<br />A. SYSTEM TO BE TESTED AND BALANCED WITH A REPORT SHOWING
<br />ACTUAL AIR FLOWS AT NEWLY INSTALLED DIFFUSERS. AIR FLOW TO BE WITHIN
<br />15% OF THE DESIGN VALUE SHOWN ON THE DRAWINGS. WHERE THIS AIR
<br />QUANTITY CANNOT BE MET, ADJUST UPSTREAM DAMPERS UNTIL IT 1S MET.
<br />COORDINATE THIS WORK WITH MACY'S OPERATIONS.
<br />SPECIFICATIONS (4 OF )
<br />I�]►�I[.l[�7�►�[C�i�IiII��7[�11
<br />PARTI- GENERAL
<br />A. GENERAL CONDITIONS, CODES & STANDARDS
<br />'.ALL WORK SHOWN ON THE ELECTRICAL DOCUMENTS IS TO BE PROVIDED AND INSTALLED
<br />BY THE ELECTRICAL CONTRACTOR, UNLESS NOTED OTHERWISE.
<br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE
<br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT.
<br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION.
<br />3. ELECTRICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES,
<br />PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALT- INCLUDE
<br />ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR
<br />ASSOCIATED FEES OR COSTS.
<br />4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND
<br />TOOLS NECESSARY TO COMPLETE THE ELECTRICAL WORK AS SHOWN ON THE DRAWINGS
<br />OR SPECIFIED HEREIN.
<br />5. TEMPORARY ELECTRICAL SERVICE, LIGHTING, AND RELATED WIRING SHALL BE PROVIDED
<br />TO OSHA REQUIREMENTS FOR THE USE OF ALL TRADES DURING CONSTRUCTION.
<br />1. BRANCH CIRCUIT LOAD CENTERS SHALL BE DEAD FRONT TYPE, WITH
<br />MAIN LUGS OR MAIN OVERCURRENT DEVICE AS INDICATED, BRANCH
<br />OVERCURRENT DEVICES AS NOTED AND AN EQUIPMENT GROUND BAR, ALL IN
<br />A FLUSH MOUNTED SHEET STEEL ENCLOSURE, MINIMUM SHORT CIRCUIT
<br />CAPACITY SHALL BE 10,000 AMPS SYMMETRICAL FOR 120/208V, AND 14,000
<br />AMPS SYMMETRICAL FOR 277/480V APPLICATION UNLESS NOTED OTHERWISE.
<br />LOAD CENTERS MUST BE SELECTED TO FIT IN A STANDARD STUD WALL.
<br />2. LOAD CENTERS SHALL BE AS MANUFACTURED BY SQUARE D, GENERAL
<br />ELECTRIC, ITE/SIEMENS AND WESTING-HOUSE/CUTLER HAMMER.
<br />A. FIXTURES AND LAMPS
<br />1. ALL FIXTURES AND LAMPS ARE FURNISHED BY TENANT, INSTALLED BY
<br />ELECTRICAL CONTRACTOR.
<br />PART 3 - EXECUTION
<br />D. GENERAL MISCELLANEOUS
<br />1. ALL CONDUIT RUN IN FINISHED AREAS SHALL BE CONCEALED. 2.
<br />2. PROVIDE TYPEWRITTEN DIRECTORY CARDS WITH BRANCH CIRCUIT
<br />B. SCOPE OF WORK
<br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE ELECTRICAL CONTRACTOR
<br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELLANEOUS
<br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE ELECTRICAL CONTRACTOR'S
<br />SCOPE - ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS
<br />SUCH.
<br />2. DURING BIDDING:
<br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE
<br />SCOPE AS A RESULT.
<br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL
<br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE
<br />WORK WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED.
<br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR
<br />DIRECTIONS THAT YOU HAVE IDENTIFIED.
<br />C. DOCUMENTS
<br />`.SUBSTITUTIONS
<br />1.1, THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT
<br />DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASF_ LEVEL
<br />OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE
<br />EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED.
<br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY
<br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET € INIMUM STANDARDS AS SET
<br />IN THESE SPECIFICATIONS.
<br />D. CONSTRUCTION COORDINATION
<br />1. DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL
<br />CONTRACTOR TO COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS.
<br />THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE TENANT.
<br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY
<br />EXISTING SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL
<br />AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO
<br />AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO
<br />SUCH SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE
<br />DAMAGE.
<br />PART 2 - PRODUCTS
<br />A. WIRING DEVICES
<br />1. DUPLEX RECEPTACLES SHALL BE GROUNDING TYPE, NEMA 5-20R, RATED
<br />FOR 20 AMPS, 125 VOLTS, WITH PROVISIONS FOR BACK AND SIDE WIRING.
<br />1.1. SPECIFICATION GRADE DUPLEX RECEPTACLE SHALL BE HUBBELL#5362
<br />SERIES OR APPROVED EQUAL, HEAVY DUTY, WHITE.
<br />1.3. GROUND FAULT CIRCUIT INTERRUPTER (GFI) DUPLEX RECEPTACLES SHALL
<br />BE PROVIDED WHERE INDICATED.
<br />2. SWITCHES SHALL BE TOGGLE OPERATED, QUIET TYPE, RATED FOR 20
<br />AMPS, 1201277 VOLTS, WITH PROVISIONS FOR BACK AND SIDE WIRING. THREE
<br />WAY AND FOUR WAY SWITCHES SHALL BE PROVIDED WHERE INDICATED.
<br />2.1. SINGLE POLE SWITCHES SHALL BE LEVITON #1221 SERIES OR APPROVED
<br />EQUAL, SILENT ACTUATING, 20-AMP, 120/277V, WHITE.
<br />2.2. THREE POLE SWITCHES SHALL BE LEVITON #1223 SERIES OR APPROVED
<br />EQUAL, SILENT ACTUATING, 20-AMP, 120/277V, WHITE.
<br />3. DIMMERS SHALL BE LEVITON SLIDING DIMMER SWITCH, OF A RATING,
<br />VOLTAGE AND WATTAGE SUITABLE FOR LOAD SERVED. COLORS OF DEVICES
<br />AND COVERPLATES SHALL WHITE.
<br />4. COMBINATION WALL DIMMER/OCCUPANT SENSOR SHALL BE LUTRON
<br />MAESTRO 0-10V DIMMER WITH INTEGRAL PASSIVE INFRARED OCCUPANT
<br />SENSING, AVAILABLE IN 1-WAY OR 3-WAY CONFIGURATIONS. COLOR TO BE
<br />WHITE. VERIFY LOAD SERVED IS COMPATIBLE PRIOR TO ORDERING,
<br />5. WIRING DEVICES SHALL BE SPECIFICATION GRADE.
<br />6. COVERPLATES FOR POWER, DATA & TELEPHONE SHALL BE LEVITON OR
<br />APPROVED EQUAL, WHITE, PLASTIC.
<br />LIGHTING CONTRACTORS SHALL BE IN NEMA 1 ENCLOSURE, NORMALLY OPEN
<br />ELECTRICALLY HELD, 120V,-COIL, 20A. REFER TO PLANS FORNUMBEROF POLES.
<br />LIGHTING AND RECEPTACLE LOAD CENTERS (PANELS),
<br />IDENTIFICATION FOR BRANCH CIRCUIT PANELBOARDS. PANELBOARDS, FEEDER
<br />DEVICES, DISTRIBUTION EQUIPMENT AND STARTERS SHALL BE FIELD MARKED
<br />TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS
<br />IN ACCORDANCE WITH NEC 110.16.
<br />3. INSTALL HANDLE GUARDS ON ALL BREAKERS FOR NIGHT LIGHTING,
<br />EMERGENCY AND SIMILAR CIRCUITS.
<br />4. ALL FLUSH MOUNTED ;LOADCENTERS SHALL HAVE (3) 3/4" EMPTY
<br />CONDUITS INSTALLED TO ABOVE ACCESSIBLE CEILING FOR FUTURE USE.
<br />S. THE FINAL LOCATIONS OF ALL EQUIPMENT, OUTLETS, ETC. SHALL BE
<br />SUBJECT TO REASONABLE CHANGES IN LOCATION UP TO THE TIME OF
<br />ROUGHING -IN, AT NO ADDITIONAL COST TO THE TENANT.
<br />B. GROUNDING
<br />1. GROUNDING OF THE ELECTRICAL SYSTEM SHALL BE BY MEANS OF AN
<br />INSULATED GROUNDING CONDUCTOR INSTALLED WITH ALL FEEDERS AND
<br />BRANCH CIRCUIT CONDUCTORS IN ALL CONDUITS AND SUPPLEMENTAL AS
<br />REQUIRED TO MEET CODE (SUCH AS ARTICLE 517).
<br />C. TESTS
<br />1, TEST FOR GROUNDS, SHORT CIRCUITS, AND PROPER FUNCTION OF ALL
<br />EQUIPMENT AFTER INSTALLATION IS COMPLETE. FAULTS IN THE INSTALLATION
<br />SHALL BE CORRECTED AT NO COST TO THE TENANT.
<br />D. DEMOLITION
<br />1. DEMOLITION OF EXISTING ELECTRICAL EQUIPMENT, IF APPLICABLE, SHALL
<br />BE PART OF THE ELECTRICAL WORK AS INDICATED ON THE DRAWINGS.
<br />Construction for:
<br />0
<br />o
<br />s
<br />oLU
<br />o
<br />N
<br />Mark Date
<br />Im
<br />a
<br />/)
<br />I �k 1 AJ U
<br />0 0 R T L A N 0
<br />O R G A N
<br />A R C HI T E C T
<br />711 N. FIELDER RD.
<br />ARLINGTON, TX 76012
<br />PH: (817) 635-5696
<br />FAX: (817) 635-5699
<br />A 1111TECT
<br />CORTLAND MOROAN
<br />TATE OF VVASHINGTON
<br />Architect Job No.:
<br />33N2022
<br />Nextore More Design
<br />Revision No.:
<br />Nextore Project
<br />Number
<br />86841
<br />Title
<br />SPECIFICATIONS
<br />4 F4
<br />04/19/2022
<br />Drawn By
<br />STAFF
<br />Checked By
<br />CM
<br />
|