Laserfiche WebLink
DIVISION 15000A - PLUMBING <br />PART 1 - GENERAL <br />DIVISION 15000B - MECHANICAL <br />I. GENERAL PROVISIONS <br />A. GENERAL CONDITIONS, CODES & STANDARDS <br />A. GENERAL CONDITIONS, CODES &STANDARDS <br />B <br />1. ALL WORK SHOWN ON THE PLUMBING DOCUMENTS IS TO BE PROVIDED AND INSTALLED BY <br />THE PLUMBING CONTRACTOR, UNLESS NOTED OTHERWISE. <br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE <br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT, <br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION, <br />3. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS <br />AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL <br />REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED <br />FEES OR COSTS. <br />SCOPE OF WORK <br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE PLUMBING CONTRACTOR <br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELI ANEOUS <br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE PLUMBING CONTRACTOR'S SCOPE <br />- ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS SUCH. <br />2. . DURING BIDDING: <br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE <br />SCOPE AS A RESULT. <br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL <br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE WORK <br />WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED. <br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR <br />DIRECTIONS THAT YOU HAVE IDENTIFIED. <br />C. DOCUMENTS <br />1.ALL WORK SHOWN ON THE MECHANICAL DOCUMENTS IS TO BE PROVIDED AND INSTALLED <br />BY THE PLUMBING CONTRACTOR, UNLESS NOTED OTHERWISE. <br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE <br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT. <br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION. <br />3. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, <br />PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE <br />ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR <br />ASSOCIATED FEES OR COSTS. <br />B. SCOPE OF WORK <br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE MECHANICAL CONTRACTOR <br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELLANEOUS <br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE MECHANICAL CONTRACTOR'S <br />SCOPE - ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS <br />SUCH, <br />2. DURING BIDDING: <br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE <br />SCOPE AS A RESULT. <br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL <br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE <br />WORK WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED. <br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR <br />`.SUBSTITUTIONS DIRECTIONS THAT YOU HAVE IDENTIFIED. <br />1.1. THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT <br />DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL OF C. DOCUMENTS <br />QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE 1.SUBSTITUTIONS <br />EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED. 1.1, THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT <br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASE LEVEL <br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE <br />THESE SPECIFICATIONS. EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED. <br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY <br />D. CONSTRUCTION COORDINATION RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET <br />IN THESE SPECIFICATIONS. <br />`.DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL CONTRACTOR TO <br />COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS. THIS WORK SHALL BE PROVIDED <br />AT NO ADDITIONAL COST TO THE TENANT. D. CONSTRUCTION COORDINATION <br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES <br />WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA <br />CAUTION IN THE PERFORMANCE_ OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL <br />COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE GENERAL <br />CONTRACTOR CAUSING THE DAMAGE. <br />PART 2 - MATERIALS <br />A. GENERAL <br />1. PROVIDE STOP VALVES AT EVERY FIXTURE ON BOTH HOT AND <br />COLD WATER SUPPLY LINES. VALVES, ESCUTCHEONS, FITTINGS, ETC. MUST <br />BE CHROME PLATED. WHERE EXPOSED, CHROME PLATED PIPE IS TO BE <br />USED. <br />2. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS <br />PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP <br />(ASJ/SSL). <br />2.1 DOMESTIC HOT AND COLD WATER PIPING UP TO 3/4 INCH DIAMETER - <br />1/2 INCH THICK <br />2.2 FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED <br />FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING <br />COVER. <br />PART 3 - EXECUTION <br />A. GENERAL <br />1. THE ENTIRE PLUMBING INSTALLATION, MATERIALS, EQUIPMENT, ETC. <br />SHALL CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED <br />CODES AND STANDARDS. <br />1.1. VERIFY FINAL ROUGH IN WITH ARCHITECT PRIOR TO WALL <br />INSTALLATION. <br />2. PIPING IS TO BE INSTALLED CONCEALED - SURFACE MOUNTED <br />PIPING IN FINISHED AREAS IS NOT ACCEPTABLE. <br />3. ALL EXPOSED OR ACCESSIBLE P-TRAPS MUST BE PROVIDED WITH <br />BOTTOM CLEANOUT PLUGS. <br />4. INSULATE EXPOSED P-TRAPS, HOT AND COLD VALVES AND PIPING <br />SERVING HANDICAPPED LAVATORIES. <br />5. IF SPACE ABOVE CEILING IS INDICATED TO BE A RETURN AIR <br />PLENUM. CONSTRUCTION MATERIALS ABOVE CEILING SHALL BE <br />NONCOMBUSTIBLE, OR HAVE A MAXIMUM 25 FLAME SPREAD AND 50 <br />SMOKE DEVELOPMENT FINISH RATING. WIRING SHALL BE LABELED PLENUM <br />RATED TYPE PER NFPA 70. <br />6. ALL CLEANOUTS ARE TO BE INSTALLED FLUSH WITH THE FINISHED <br />FLOOR OR WALL. <br />B. INSULATION <br />1. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, <br />FLOORS, HANGERS AND SIMILAR PENETRATIONS: <br />2. MAINTAIN ACCESS TO VALVES <br />`.DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL CONTRACTOR TO <br />COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS. THIS WORK SHALL BE <br />PROVIDED AT NO ADDITIONAL COST TO THE TENANT. <br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING <br />SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE <br />EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH <br />FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE <br />GENERAL CONTRACTOR CAUSING THE DAMAGE. <br />II. INSULATION <br />A. GENERAL <br />I. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, <br />FLOORS, HANGERS AND SIMILAR PENETRATIONS. <br />2. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. <br />3. INSULATION SHALT_ BE BY OWENS-CORNING, KNAUF, OR MANVILLE. <br />4. ALL DUCTWORK AND PIPING SHALL BE INSULATED <br />VI. AIR DISTRIBUTION <br />A. AIR DISTRIBUTION <br />I. DUCTWORK (ROUND OR RECTANGULAR OR SPIRAL) SHALL BE OF <br />GALVANIZED STEEL CONSTRUCTION AND SHALL BE INSTALLED IN <br />ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA MANUAL AND <br />SEALED. <br />2. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION <br />WITH A MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15DEGREES <br />3. FINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE <br />DUCTWORK BUT IT'S USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL <br />RUNS. ALL CHANGES OF DIRECTION IN A DUCT SYSTEM (GALVANIZED OR <br />FLEXIBLE) SHALL BE MADE WITH AN APPROPRIATE GALVANIZED ELBOW. <br />MAXIMUM LENGTH OF ANY FLEXIBLE DUCT IS 5'-0". <br />4, FLEXIBLE DUCTS TO DIFFUSERS: MAXIMUM LENGTH OF FLEXIBLE DUCT <br />TO DIFFUSER TO BE 5'-0". <br />VIII. TESTING AND BALANCING <br />A. SYSTEM TO BE TESTED AND BALANCED WITH A REPORT SHOWING <br />ACTUAL AIR FLOWS AT NEWLY INSTALLED DIFFUSERS. AIR FLOW TO BE WITHIN <br />15% OF THE DESIGN VALUE SHOWN ON THE DRAWINGS. WHERE THIS AIR <br />QUANTITY CANNOT BE MET, ADJUST UPSTREAM DAMPERS UNTIL IT 1S MET. <br />COORDINATE THIS WORK WITH MACY'S OPERATIONS. <br />SPECIFICATIONS (4 OF ) <br />I�]►�I[.l[�7�►�[C�i�IiII��7[�11 <br />PARTI- GENERAL <br />A. GENERAL CONDITIONS, CODES & STANDARDS <br />'.ALL WORK SHOWN ON THE ELECTRICAL DOCUMENTS IS TO BE PROVIDED AND INSTALLED <br />BY THE ELECTRICAL CONTRACTOR, UNLESS NOTED OTHERWISE. <br />2. ALL WORK TO MEET APPLICABLE CODES AS LOCALLY ENFORCED. NO WORK ON THE <br />DRAWINGS IS TO BE INSTALLED WHERE IT CONFLICTS WITH LOCAL CODE ENFORCEMENT. <br />COORDINATE WITH THE LOCAL INSPECTOR PRIOR TO INSTALLATION. <br />3. ELECTRICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, <br />PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALT- INCLUDE <br />ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR <br />ASSOCIATED FEES OR COSTS. <br />4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND <br />TOOLS NECESSARY TO COMPLETE THE ELECTRICAL WORK AS SHOWN ON THE DRAWINGS <br />OR SPECIFIED HEREIN. <br />5. TEMPORARY ELECTRICAL SERVICE, LIGHTING, AND RELATED WIRING SHALL BE PROVIDED <br />TO OSHA REQUIREMENTS FOR THE USE OF ALL TRADES DURING CONSTRUCTION. <br />1. BRANCH CIRCUIT LOAD CENTERS SHALL BE DEAD FRONT TYPE, WITH <br />MAIN LUGS OR MAIN OVERCURRENT DEVICE AS INDICATED, BRANCH <br />OVERCURRENT DEVICES AS NOTED AND AN EQUIPMENT GROUND BAR, ALL IN <br />A FLUSH MOUNTED SHEET STEEL ENCLOSURE, MINIMUM SHORT CIRCUIT <br />CAPACITY SHALL BE 10,000 AMPS SYMMETRICAL FOR 120/208V, AND 14,000 <br />AMPS SYMMETRICAL FOR 277/480V APPLICATION UNLESS NOTED OTHERWISE. <br />LOAD CENTERS MUST BE SELECTED TO FIT IN A STANDARD STUD WALL. <br />2. LOAD CENTERS SHALL BE AS MANUFACTURED BY SQUARE D, GENERAL <br />ELECTRIC, ITE/SIEMENS AND WESTING-HOUSE/CUTLER HAMMER. <br />A. FIXTURES AND LAMPS <br />1. ALL FIXTURES AND LAMPS ARE FURNISHED BY TENANT, INSTALLED BY <br />ELECTRICAL CONTRACTOR. <br />PART 3 - EXECUTION <br />D. GENERAL MISCELLANEOUS <br />1. ALL CONDUIT RUN IN FINISHED AREAS SHALL BE CONCEALED. 2. <br />2. PROVIDE TYPEWRITTEN DIRECTORY CARDS WITH BRANCH CIRCUIT <br />B. SCOPE OF WORK <br />1.ONLY MAJOR EQUIPMENT IS SHOWN ON THE DRAWINGS. THE ELECTRICAL CONTRACTOR <br />SHALL BID AND CONSTRUCT A COMPLETE AND OPERATIONAL SYSTEM. MISCELLANEOUS <br />EQUIPMENT REQUIRED TO COMPLETE THE WORK IS IN THE ELECTRICAL CONTRACTOR'S <br />SCOPE - ASSUME NO WORK OR EQUIPMENT IS PROVIDED BY OTHERS UNLESS STATED AS <br />SUCH. <br />2. DURING BIDDING: <br />2.1. VERIFY THE EXISTING CONDITIONS AND COMPENSATE FOR ANY VARIATIONS IN THE <br />SCOPE AS A RESULT. <br />2.3. WHERE THERE IS A CONFLICT THAT CANNOT BE RESOLVED BY THE GENERAL <br />CONTRACTOR, ADVISE ENGINEER PROMPTLY FOR A RESOLUTION. DO NOT PROVIDE <br />WORK WHEN THERE IS UNCERTAINTY ON WHAT WORK IS TO BE PERFORMED. <br />3. AS PART OF THE BIDDING PROCESS, REPORT TO THE TENANT ANY ERRORS OR UNCLEAR <br />DIRECTIONS THAT YOU HAVE IDENTIFIED. <br />C. DOCUMENTS <br />`.SUBSTITUTIONS <br />1.1, THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE CONTRACT <br />DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO ESTABLISH A BASF_ LEVEL <br />OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL CONTEMPLATE THE USE OF THE <br />EQUIPMENT AND MATERIALS EQUIVALENT TO THOSE INDICATED. <br />2. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY <br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET € INIMUM STANDARDS AS SET <br />IN THESE SPECIFICATIONS. <br />D. CONSTRUCTION COORDINATION <br />1. DURING BIDDING YOU VISITED THE SITE. WORK WITH THE GENERAL <br />CONTRACTOR TO COORDINATE ANY CONFLICTS WITH EXISTING CONDITIONS. <br />THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE TENANT. <br />2. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY <br />EXISTING SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL <br />AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO <br />AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO <br />SUCH SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE <br />DAMAGE. <br />PART 2 - PRODUCTS <br />A. WIRING DEVICES <br />1. DUPLEX RECEPTACLES SHALL BE GROUNDING TYPE, NEMA 5-20R, RATED <br />FOR 20 AMPS, 125 VOLTS, WITH PROVISIONS FOR BACK AND SIDE WIRING. <br />1.1. SPECIFICATION GRADE DUPLEX RECEPTACLE SHALL BE HUBBELL#5362 <br />SERIES OR APPROVED EQUAL, HEAVY DUTY, WHITE. <br />1.3. GROUND FAULT CIRCUIT INTERRUPTER (GFI) DUPLEX RECEPTACLES SHALL <br />BE PROVIDED WHERE INDICATED. <br />2. SWITCHES SHALL BE TOGGLE OPERATED, QUIET TYPE, RATED FOR 20 <br />AMPS, 1201277 VOLTS, WITH PROVISIONS FOR BACK AND SIDE WIRING. THREE <br />WAY AND FOUR WAY SWITCHES SHALL BE PROVIDED WHERE INDICATED. <br />2.1. SINGLE POLE SWITCHES SHALL BE LEVITON #1221 SERIES OR APPROVED <br />EQUAL, SILENT ACTUATING, 20-AMP, 120/277V, WHITE. <br />2.2. THREE POLE SWITCHES SHALL BE LEVITON #1223 SERIES OR APPROVED <br />EQUAL, SILENT ACTUATING, 20-AMP, 120/277V, WHITE. <br />3. DIMMERS SHALL BE LEVITON SLIDING DIMMER SWITCH, OF A RATING, <br />VOLTAGE AND WATTAGE SUITABLE FOR LOAD SERVED. COLORS OF DEVICES <br />AND COVERPLATES SHALL WHITE. <br />4. COMBINATION WALL DIMMER/OCCUPANT SENSOR SHALL BE LUTRON <br />MAESTRO 0-10V DIMMER WITH INTEGRAL PASSIVE INFRARED OCCUPANT <br />SENSING, AVAILABLE IN 1-WAY OR 3-WAY CONFIGURATIONS. COLOR TO BE <br />WHITE. VERIFY LOAD SERVED IS COMPATIBLE PRIOR TO ORDERING, <br />5. WIRING DEVICES SHALL BE SPECIFICATION GRADE. <br />6. COVERPLATES FOR POWER, DATA & TELEPHONE SHALL BE LEVITON OR <br />APPROVED EQUAL, WHITE, PLASTIC. <br />LIGHTING CONTRACTORS SHALL BE IN NEMA 1 ENCLOSURE, NORMALLY OPEN <br />ELECTRICALLY HELD, 120V,-COIL, 20A. REFER TO PLANS FORNUMBEROF POLES. <br />LIGHTING AND RECEPTACLE LOAD CENTERS (PANELS), <br />IDENTIFICATION FOR BRANCH CIRCUIT PANELBOARDS. PANELBOARDS, FEEDER <br />DEVICES, DISTRIBUTION EQUIPMENT AND STARTERS SHALL BE FIELD MARKED <br />TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS <br />IN ACCORDANCE WITH NEC 110.16. <br />3. INSTALL HANDLE GUARDS ON ALL BREAKERS FOR NIGHT LIGHTING, <br />EMERGENCY AND SIMILAR CIRCUITS. <br />4. ALL FLUSH MOUNTED ;LOADCENTERS SHALL HAVE (3) 3/4" EMPTY <br />CONDUITS INSTALLED TO ABOVE ACCESSIBLE CEILING FOR FUTURE USE. <br />S. THE FINAL LOCATIONS OF ALL EQUIPMENT, OUTLETS, ETC. SHALL BE <br />SUBJECT TO REASONABLE CHANGES IN LOCATION UP TO THE TIME OF <br />ROUGHING -IN, AT NO ADDITIONAL COST TO THE TENANT. <br />B. GROUNDING <br />1. GROUNDING OF THE ELECTRICAL SYSTEM SHALL BE BY MEANS OF AN <br />INSULATED GROUNDING CONDUCTOR INSTALLED WITH ALL FEEDERS AND <br />BRANCH CIRCUIT CONDUCTORS IN ALL CONDUITS AND SUPPLEMENTAL AS <br />REQUIRED TO MEET CODE (SUCH AS ARTICLE 517). <br />C. TESTS <br />1, TEST FOR GROUNDS, SHORT CIRCUITS, AND PROPER FUNCTION OF ALL <br />EQUIPMENT AFTER INSTALLATION IS COMPLETE. FAULTS IN THE INSTALLATION <br />SHALL BE CORRECTED AT NO COST TO THE TENANT. <br />D. DEMOLITION <br />1. DEMOLITION OF EXISTING ELECTRICAL EQUIPMENT, IF APPLICABLE, SHALL <br />BE PART OF THE ELECTRICAL WORK AS INDICATED ON THE DRAWINGS. <br />Construction for: <br />0 <br />o <br />s <br />oLU <br />o <br />N <br />Mark Date <br />Im <br />a <br />/) <br />I �k 1 AJ U <br />0 0 R T L A N 0 <br />O R G A N <br />A R C HI T E C T <br />711 N. FIELDER RD. <br />ARLINGTON, TX 76012 <br />PH: (817) 635-5696 <br />FAX: (817) 635-5699 <br />A 1111TECT <br />CORTLAND MOROAN <br />TATE OF VVASHINGTON <br />Architect Job No.: <br />33N2022 <br />Nextore More Design <br />Revision No.: <br />Nextore Project <br />Number <br />86841 <br />Title <br />SPECIFICATIONS <br />4 F4 <br />04/19/2022 <br />Drawn By <br />STAFF <br />Checked By <br />CM <br />