Laserfiche WebLink
GENERAL NOTES: NELSON <br />0 <br />■ <br />1. WHERE NEW FLOOR FINISHES AND/OR WALL BASE ARE SCHEDULED, PREPARE FLOORS <br />AND WALLS TO RECEIVE NEW FINISH. CONCRETE SLAB TO RECEIVE NEW SEAL WHERE <br />SAW -CUT AND PATCHED. PATCH AND PAINT ALL OFFICE WALLS. TYPICAL THROUGHOUT. <br />2. FINISHES PER ROOM FINISH SCHEDULE SHEET A6.1, TYPICAL UON. <br />3. REUSE EXISTING DOORS, DOOR FRAMES AND DOOR HARDWARE IN NEW <br />CONFIGURATION WHENEVER POSSIBLE. NEW DOORS AND DOOR FRAMES TO MATCH <br />EXISTING. <br />4. FOR ALL NEW PARTITIONS TYPES SEE SHEET A8.1. <br />5. FOR ACCESSIBILITY COMPLIANCE REFER TO SHEET AN-2, <br />6. THERE SHALL BE NO EXPOSED PIPE, CONDUIT, DUCTS, VENTS, ETC. ALL SUCH LINES <br />SHALL BE CONCEALED OR FURRED AND FINISHED, UNLESS OTHERWISE NOTED AS <br />EXPOSED CONSTRUCTION ON THE DRAWING, <br />7. OFFSET STUDS, WHERE REQUIRED, SO THAT FINISHED PARTITION SURFACE WILL BE <br />FLUSH, UNLESS OTHERWISE NOTED. PROVIDE FURRING AT EXISTING PARTITIONS AS <br />REQUIRED TO INSTALL ELECTRICAL ITEMS AS INDICATED ON THE DRAWINGS. <br />8. DOOR AND CASED OPENINGS WITHOUT LOCATION DIMENSIONS OR DETAILS ARE TO BE <br />(4) INCHES FROM ADJACENT WALL AT HINGE SIDE OF DOOR OR CENTERED BETWEEN <br />WALLS. <br />9. FINISHED FACES OF NEW PARTITIONS PARALLEL TO EXISTING FRAMING SHALL ALIGN. <br />10, CENTER LOCATION OF NEW WALL CONSTRUCTION ON EXISTING COLUMNS, PIER, <br />JOISTS OR WINDOW MULLION, AS SHOWN. <br />11. GC SHALL BE RESPONSIBLE FOR PROVIDING ALL BLOCKING FOR ALL WALL AND CEILING <br />MOUNTED ITEMS, INCLUDING HARDWARE, LIGHT FIXTURES, GRAB <br />BARS, CASEWORK, AND ALL OWNER PROVIDED ITEMS. PROVIDE SHEET METAL <br />REINFORCING (8" HORIZONTALLY MOUNTED STRIP OF 20 GA. GALVANIZED SHEET <br />METAL) CONCEALED IN PARTITIONS WHERE WALL OR CEILING MOUNTED ITEM IS <br />INDICATED ON DRAWINGS. <br />12. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR REVIEW PRIOR TO MANUFACTURE OF <br />ANY CASEWORK, MILLWORK AND ANY OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP <br />FABRICATED WORK. <br />LEG EN : <br />NEW PARTITION <br />EXISTING PARTITION TO REMAIN <br />---® PARTITION TYPE, REFER TO PARTITION TYPE DETAILS ON SHEET A8.1 <br />KEY NOTES: O <br />1. NEW ACCESSIBLE EYEWASH STATION, HOSE BIB <br />2. EXISING COLUMN BOXED FULL HEIGHT ABOVE BENCHING; STOP GWB 6" <br />ABOVE CEILING <br />3. WORK PERMITTED UNDER PERMIT # 1807033 & # 1808012 <br />4. NEW R&D LABORATORY ADDITION <br />5. NEW TENANT PROVIDED AND INSTALLED HOT CELL ON STRUCTURAL <br />FOUNDATION INCLUDED IN THIS PERMIT. <br />6. NEW TENANT PROVIDED AND INSTALLED GLOVE BOX <br />7. NEW CONTACTOR PROVIDED AND INSTALLED CASEWORK - SEE 2/A2.1 FOR <br />ELEVATION <br />8. NEW TENANT PROVIDED CONTRACTOR INSTALLED TRANSFER HATCH <br />9. R&D LID ACCESS LADDER FOR SERVICING HEPA FILTERING SYSTEM: <br />LADDER INSTALLATION TO COMPLY WITH CURRENT EDITION OF OSHA <br />1910.27 REQUIREMENTS FOR FIXED LADDERS; G.C. TO PROVIDE 42" HIGH <br />GUARD RAILS ALONG LID EDGE 10' EACH DIRECTION AT LADDER ACCESS <br />ON T/O R&D LID; G.0 TO INSTALL FALL ARREST ANCHORAGE PER IBC <br />1015.6, EXCEPTION - RE: DETAIL 5/A8.1 <br />10, NEW LOW LEVEL BOLT DOWN HEAVY DUTY STAINLESS STEEL BOLLARDS <br />EITHER SIDE OF RAPID ROLL DOOR OPENINGS - SEE 9/A8.1, TYPICAL <br />11. CHAIRRAIL - SEE 4/A8.1 <br />12. THICKENED CONCRETE SLAB FOR FUTURE HOT CELL INSTALLATION <br />*NOTE: DIMENSIONS WITH ASTERICS ARE APPROXIMATE AH=ND <br />SHALL BE ADJUSTED UPON COORDINATION WITH HOT CELL <br />INSTALLATION <br />KEY PLAN <br />SCALE: N.T.S. <br />Nelco Architecture, Inc. <br />1200 Fifth Ave. <br />Suite 1300 <br />Seattle, WA 98101 <br />Phone: (206)408-8500 <br />WWW.NELSONWORLDWIDE.COM <br />Owner/Client Representative: <br />Firm Name: TERRAPOWER <br />Attn: IAN VAN HOUTEN <br />360,739.2364 <br />E-mail: IVANHOUTEN@TERRAPOWER.com <br />Structural Engineer: <br />Firm Name: SHUTLER CONSULTING ENGINEERS <br />Attn: JOHN HEADLAND <br />425.450.4075 <br />JOHNH@SHUTLER.com <br />General Contractor: <br />Firm Name: PATTISON GENERAL CONTRACTOR <br />Attn: ANDY FORTINO <br />T: 206.571.3478 <br />E-mail:ANDYF@PATTISONGC.com <br />CLIENT: <br />;M <br />-. N <br />Term Vowes' <br />TERRAPOWER <br />15800 NORTHUP WAY <br />BELLEVUE, WA, 98008 <br />PROJECT: <br />3315 SEAWAY BLVD. <br />EVERM, WA 98203 <br />Description: No: Date: <br />PERMIT SET 05/26/2021 <br />SEAL: <br />CITY STAMP: <br />PARTIAL FIRST FLOOR PLAN <br />Proj. # 20.0001110.001 Reviewed By: PA/PM <br />1 PARTIAL FIRST FLOOR PLAN 0 4' 81 <br />A2.1 1/4"=1'-0" A/.m i <br />