n
<br />PROJECT TO BE ELECTRICAL AND MECHANICAL DESIGN -BUILD. NEW LIGHTING SHALL MEET
<br />1. CEILING GRID START POINT (FULL TILE)
<br />1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING
<br />THE FOLLOWING MINIMUM REQUIREMENTS:
<br />2. GWB CEILING THIS ROOM
<br />HEIGHTS, LIGHT FIXTURES, SWITCH LOCATIONS, AND ASSOCIATED ITEMS.
<br />A. IBC 1008.1 - ILLUMINATION REQUIREMENT
<br />3. EXISTING EXPOSED STRUCTURE TO REMAIN, NO CEILING BEING
<br />REFER TO ENGINEERING DRAWINGS FOR CIRCUITING, WIRING LAYOUT, AND
<br />1. THE MEANS OF EGRESS, INCLUDING THE EXITDISCHARGE, SHALL BE
<br />CONSTRUCTED
<br />ADDITIONAL INFORMATION. ALL MEP -FP DEVICE LOCATIONS NOT SHOWN ON
<br />ILLUMINATED AT ALL TIMES THE BUILDING SPACE SERVED BY THE
<br />DRAWINGS, OR IN CONFLICT WITH MEP/FP DRAWINGS, ARE TO BE
<br />MEANS OF EGRESS IS OCCUPIED.
<br />COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. IN THE EVENT OF
<br />B. IBC 1008.2.1 - ILLUMINATION LEVEL
<br />DISCREPANCIES BETWEEN THE ARCHITECT'S REFLECTED CEILING PLAN AND
<br />1. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1
<br />THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING
<br />FOOT-CANDLE (11 LUX) AT THE FLOOR LEVEL,
<br />BEFORE ORDERING MATERIALS OR PROCEEDING WITH THE WORK.
<br />C. IBC 1008.3 - ILLUMINATION EMERGENCY POWER
<br />2. FOLLOWING COMPLETION OF THE CEILING TILE INSTALLATION, ALL JOINTS
<br />1, THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL
<br />AND GRID SHALL BE STRAIGHT, TRUE TO LINE, WITH EXPOSED SURFACES
<br />NORMALLY BE PROVIDED BY THE PREMISE'S ELECTRIC SUPPLY.
<br />FLUSH AND LEVEL. DIRTY OR DISCOLORED SURFACES OF TILE ARE TO BE
<br />3 ) 1.1 LOCATIONS INCLUDE: DEDICATED EGRESS ROUTES IN LARGER ROOMS
<br />CLEANED OR REPLACED, AND LEFT FREE OF DEFECTS. AFTER 30 DAYS FROM
<br />�J OR SPACES, PUBLIC OR COMMON EGRESS ELEMENTS, ESSENTIAL
<br />SUBSTANTIAL COMPLETION, INSPECT THE WORK AND ADJUST TILE NOT IN
<br />PORTIONS OF THE INTERIOR EGRESS SYSTEM, INTERIOR EXIT
<br />ALIGNMENT WITH OTHER CEILING TILES AND REPLACE MISSING OR DAMAGED
<br />DISCHARGE ELEMENTS, AND EXTERIOR PORTIONS OF THE EXIT
<br />UNITS.
<br />DISCHARGE, INCLUDING INTERIOR EXIT STAIRWAYS & RAMPS.
<br />3. WITHIN A ROOM OR AREA, THE CONTRACTOR SHALL ESTABLISH A SINGLE
<br />2. PER IBC 1008.3.3, IN THE EVENT OF POWER SUPPLY FAILURE, AN
<br />FLOOR ELEVATION THAT IS TO BE USED AS THE ORIGIN FOR ALL CEILING
<br />EMERGENCY ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE THE
<br />HEIGHTS ABOVE FINISHED FLOOR.
<br />FOLLOWING AREAS: ELECTRICAL EQUIPMENT ROOMS, FIRE COMMAND CENTERS,
<br />4. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL MEP/FP AND STRUCTURAL
<br />FIRE PUMP ROOMS, GENERATOR ROMS, PUBLIC RESTROOMS WITH AN AREA
<br />ELEMENTS. CONTRACTOR TO COORDINATE THE WORK OF ALL TRADES
<br />GREATER THAN 300 SF. DURATION OF EMERGENCY POWER SHALL BE PER
<br />NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED.
<br />1008.3.4: NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF STORAGE
<br />INSTALL DUCTWORK TIGHT TO UNDERSIDE OF BEAMS. WITH A SMALL SPACE
<br />BATTERIES, UNIT EQUIPMENT OR AN ON -SITE GENERATOR, ILLUMINATION LEVEL
<br />LEGEND
<br />TO AVOID VIBRATION. INSTALLATION AND/OR ALTERATION OF DUCTWORK,
<br />UNDER EMERGENCY POWER PER 1008.3.5: INITIAL ILLUMINATION NOT LESS
<br />PIPING OR OTHER EQUIPMENT THAT WILL REQUIRE FASCIAS, SOFFITS AND
<br />THAN1 FC, MINIMUM AT ANY POINT OF 0.1 FC MEASURED ALONG THE PATH OF
<br />OTHER TRANSITIONS IN CEILING HEIGHT SHALL BE REVIEWED WITH THE
<br />EGRESS AT FLOOR LEVEL.
<br />ARCHITECT PRIOR TO PROCEEDING. CONTRACTOR TO PROVIDE COMPLETE
<br />3. EACH ROOM SHALL COMPLY WITH THE PROVISIONS OF C405.2 INTERIOR
<br />LIGHTING CONTROLS. EACH AREA ENCLOSED BY
<br />INTERNALLY ILLUMINATED EXIT SIGNAGE W/ BATTERY BACKUP
<br />EXI T dEXI V
<br />COORDINATION DRAWINGS FOR THE ARCHITECT AND ENGINEER'S REVIEW.
<br />WALLS OR FLOOR -TO -CEILING
<br />17 PER IBC SECTION 1013, CONFIRM OPERATION FOR EXISTING.
<br />5. NEW FIRE, LIFE, SAFETY SYSTEM AS REQUIRED PER NEW WALL LAYOUT AND
<br />PARTITIONS SHALL HAVE AT LEAST ONE MANUAL CONTROL FOR THE LIGHTING
<br />ADD WHERE NOT EXISTING. ARROW = DIRECTION INDICATOR,
<br />CURRENT CODE. ENGINEERING AND INSTALLATION BY BUILDING
<br />SERVING THAT AREA. THE REQUIRED CONTROLS SHALL BE LOCATED WITHIN THE
<br />IF REQUIRED
<br />RECOMMENDED SUB -CONTRACTOR,
<br />AREA SERVED BY THE CONTROLS OR BE A REMOTE SWITCH THAT IDENTIFIES
<br />1X4 SURFACE MOUNTED LED 'LIGHT FIXTURE W/ WRAP AROUND
<br />6. PROVIDE SMOKE DETECTORS THROUGHOUT TENANT AREAS IN ACCORDANCE
<br />THE LIGHTS SERVED AND INDICATES THEIR STATUS.
<br />ACRYLIC LENS IP54
<br />WITH LOCAL CODES AND MANUFACTURER'S RECOMMENDATIONS.
<br />7. ALL CEILING MOUNTED DEVICES SHALL BE WHITE TO MATCH RAL COLOR.
<br />C405.2.2.2 LIGHT REDUCTION CONTROLS. LIGHT REDUCTION CONTROLS NEED
<br />& PROVIDE BLOCKING ABOVE CEILING REQUIRED FOR ALL CEILING MOUNTED
<br />NOT BE PROVIDED IN THE FOLLOWING AREAS AND SPACES:
<br />NEW 2X4 LAY -IN LED LIGHT FIXTURE, CLEAN ROOM LIGHT FITTING
<br />EQUIPMENT. PROVIDE ADDITIONAL SUPPORT FOR LIGHT FIXTURES AS
<br />1. AREAS THAT ARE CONTROLLED BY AN OCCUPANT -SENSING DEVICE.
<br />IP65
<br />RECOMMENDED BY FIXTURE MANUFACTURER,
<br />2. CORRIDORS, EQUIPMENT ROOMS, STOREROOMS, RESTROOMS, PUBLIC
<br />9. LOCATE ANY CONTROLS THAT NEED ACCESSING OVER CEILING TILE AREAS.
<br />LOBBIES, ELECTRICAL OR MECHANICAL ROOMS.
<br />HATCH INDICATES "NIGHT LIGHT" FOR EGRESS ILLUMINATION
<br />NOT PLACE ANY ABOVE GYPSUM BOARD CEILINGS, UNLESS APPROVED BY
<br />3. DAYLIGHT SPACES COMPLYING WITH SECTION C405.2.2.3.2.
<br />NOT LESS THAN 1 FC PER IBC SECTION 1008.2.1 WITH
<br />ARCHITECT.
<br />EMERGENCY POWER PER 1008.3.3
<br />10. PROVIDE CEILING ACCESS REQUIRED FOR EQUIPMENT AND SYSTEM
<br />C405.2.2. AUTOMATIC TIME SWITCH CONTROL DEVICES. AUTOMATIC TIME
<br />MAINTENANCE. MATCH ADJACENT CEILING FINISH U.N.O. SYSTEMS AND
<br />SWITCH CONTROLS NEED NOT BE IN SPACES CONTROLLED BY OCCUPANCY
<br />IMM.
<br />EQUIPMENT REQUIRING ACCESS SHALL BE LOCATED AT ACCESSIBLE CEILINGS -
<br />SENSORS.
<br />INDICATES DIMMABLE FIXTURE
<br />ACCESS PANELS NOT SHOWN ON DRAWINGS SHALL NOT BE INSTALLED IN
<br />GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL.
<br />C405.2.1 OCCUPANCY SENSORS. OCCUPANCY SENSORS SHALL BE INSTALLED IN
<br />11. ALL ACCESS PANELS IN GYPSUM BOARD CEILINGS SHALL BE FRAMELESS;
<br />ALL CLASSROOMS, CONFERENCE/ MEETING ROOMS, EMPLOYEE LUNCH AND
<br />LOCATIONS SHALL BE COORDINATED WITH ARCHITECT. GROUP DEVICES TO
<br />BREAK ROOMS, PRIVATE OFFICES, RESTROOMS, WAREHOUSE SPACES, STORAGE
<br />MINIMIZE THE NUMBER AND SIZE OF ACCESS PANELS.
<br />ROOMS AND JANITORIAL CLOSETS, AND OTHER SPACES 300 SQUARE FEET (28
<br />4 D MULTI DETECTOR WITH SOUNDER
<br />12. ALL CONDUITS, BOXES, DUCTS, HVAC UNITS, PIPES, ETC., SHALL BE INSTALLED
<br />M2) OR LESS ENCLOSED BY FLOOR -TO- CEILING HEIGHT PARTITIONS. THESE
<br />AS HIGH AS POSSIBLE, NOT LOWER THAN 8" ABOVE LINE OF HIGHEST
<br />AUTOMATIC CONTROL DEVICES SHALL BE INSTALLED TO AUTOMATICALLY TURN
<br />2'X4' SUSPENSION GRID CEILING TILE: EXPOSED 15/16" GRID W/
<br />FINISHED CEILING.
<br />OFF LIGHTS WITHIN 30 MINUTES OF ALL OCCUPANTS LEAVING THE SPACE, AND
<br />- INTEGRAL GASKET HUNG FROM THE UNDERSIDE OF THE
<br />13. THERE SHALL BE NO COMBUSTIBLE MATERIALS IN THE PLENUM SPACE.
<br />SHALL EITHER BE MANUAL ON OR SHALL BE CONTROLLED TO AUTOMATICALLY
<br />ENGINEERED FLOOR JOIST, SEE SHEET A6.1 FOR DETAILED
<br />14. WHEN MULTIPLE SWITCHES OCCUR IN CLOSE PROXIMITY GANG UNDER SINGLE
<br />TURN THE LIGHTING ON TO NOT MORE THAN 50 PERCENT POWER.
<br />SPECIFICATIONS.
<br />SWITCH PLATE.
<br />15. FURNISH AND INSTALL NEW THERMOSTATS AS REQUIRED. INSTALL CLOSE TO
<br />C405.2.1 OCCUPANCY SENSORS. OCCUPANCY SENSORS SHALL BE INSTALLED IN
<br />DOOR OPENINGS, DO NOT INSTALL IN CENTER OF WALL. ARCHITECT AND
<br />ALL NEW ROOMS. THESE CONTROLS DEVICES SHALL BE CAPABLE OF
<br />CLIENT TO APPROVE ALL LOCATIONS.
<br />AUTOMATICALLY REDUCING THE LIGHTING POWER IN RESPONSE TO AVAILABLE
<br />ONE LAYER OF 5/8" TYPE X GWB CEILING DIRECTLY ATTACHED TO
<br />16. ALL LIGHTS TO BE CONTROLLED BY MOTION SENSOR. PROVIDE OVERRIDE
<br />DAYLIGHT BY EITHER ONE OF THE FOLLOWING METHODS:
<br />UNDERSIDE OF FLOOR JOISTS, ALL JOINTS TAPED AND SEALED;
<br />SWITCH AT ALL CONFERENCE ROOMS
<br />1. CONTINUOUS DIMMING USING DIMMING BALLASTS AND
<br />FINISHED WITH HYGIENIC PAINT.
<br />17. ALL LAMPS SHALL BE IDENTICAL FROM ONE MANUFACTURER IN SAME
<br />DAYLIGHT -SENSING AUTOMATIC CONTROLS THAT ARE CAPABLE OF REDUCING
<br />TEMPERATURE, UON.
<br />THE POWER OF GENERAL LIGHTING IN THE DAYLITE ZONE CONTINUOUSLY TO
<br />15. IN EXISTING ALTERED SPACE, REPAIR AND/OR REPLACE COMPONENTS
<br />LESS THAN 20 PERCENT OF RATED POWER AT MAXIMUM LIGHT OUTPUT.
<br />SWITCH DISCONNECTOR
<br />NECESSARY TO INSURE ALL EXISTING AND OR RELOCATED LIGHT FIXTURES
<br />2. STEPPED DIMMING USING MULTI -LEVEL SWITCHING AND
<br />ARE FUNCTIONING, INCLUDING BUT NOT LIMITED TO LAMPS, BALLASTS, AND
<br />DAYLIGHT -SENSING CONTROLS THAT ARE CAPABLE OF REDUCING LIGHTING
<br />INDICATES CEILING HEIGHT ABOVE FINISHED FLOOR
<br />LENSES, RELAMP ALL EXISTING AND RELOCATED FIXTURES TO REMAIN.
<br />POWER AUTOMATICALLY. THE SYSTEM SHALL PROVIDE A MINIMUM OF TWO
<br />CONTROL CHANNELS PER ZONE AND BE INSTALLED IN A MANNER SUCH THAT AT
<br />LEAST CONTROL
<br />RPOWER
<br />MULTI DETECTOR
<br />CEILING TES
<br />T
<br />DESIGNNE LIGHTING AND ANOTHER CONTROL TEP IS NO GREATER THAN
<br />35 PERCENT OF DESIGN POWER, AND THE SYSTEM IS CAPABLE OF
<br />P
<br />1. CENTER CEILING GRID IN ROOM OR AREA IN TWO DIRECTIONS, TYPICAL UON.
<br />AUTOMATICALLY TURNING THE SYSTEM OFF.
<br />(9 PIR/OCCUPANCY SENSOR
<br />2. CENTER LIGHT FIXTURES/SPRINKLER HEAD/CEILING ELEMENT IN 24" PORTION
<br />C408.2.3 FUNCTIONAL TESTING. TESTING SHALL ENSURE THAT CONTROL HARDWARE AND
<br />OF 48" CEILING TILE, TYPICAL UON,
<br />3. LOCATE ALL LIGHT FIXTURES, SPEAKERS, LIFE -SAFETY DEVICES AND SIMILAR
<br />SOFTWARE ARE CALIBRATED, ADJUSTED, PROGRAMMED AND IN PROPER WORKING
<br />CONDITION IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S
<br />SUPPLY DIFFUSER - ACTUAL LOCATION TO BE COORDINATED W/
<br />CEILING ELEMENTS, ETC., IN THE CENTER OF CEILING TILE IN BOTH
<br />INSTALLATION INSTRUCTIONS.
<br />HVAC DESIGN -BUILD
<br />DIRECTIONS AND ALIGN WITH ADJACENT FIXTURES, DEVICES OR HEADS IN A
<br />NEW HVAC SOLUTION SHALL MEET THE FOLLOWING MINIMUM REQUIREMENT:
<br />RUN OR ROW, U.N.O.
<br />4. REFER TO ELEVATIONS AND SECTIONS FOR MOUNTING HEIGHTS OF WALL
<br />A. NEW MECHANICAL ELEMENTS, INCLUDING BUT NOT LIMITED TO PACKAGED UNITS,
<br />SURFACE MOUNTED LIGHT FIXTURES.
<br />CONTROLS, DAMPERS, DUCTING, COMMISSIONING; TO FULLY COMPLY WITH THE
<br />EXHAUST GRILLE - ACTUAL LOCATION TO BE COORDINATED W/
<br />5. PROVIDE SEISMIC BRACING AT ALL SUSPENDED CEILING SYSTEMS. SUSPENDED
<br />PROVISIONS OF WSEC SECTION C403.
<br />HVAC DESIGN -BUILD
<br />CEILING AND BRACING SHALL MEET THE MINIMUM REQUIREMENTS OF CISCA
<br />B. VENTILATION REQUIREMENTS FOR RESTROOMS PER WASHINGTON STATE
<br />AND ASCE 7-10 SECTION 13.5.6. AS SUMMARIZED ON SHEET A8.1
<br />MECHANICAL CODE (WAC 51-52)
<br />C. ALL OCCUPIED SPACES SHALL BE VENTILATED BY MECHANICAL MEANS IN
<br />ACCORDANCE WITH SECTION 403 IN THE 2015 INTERNATIONAL MECHANICAL CODE
<br />THE VENTILATION SYSTEM SERVING THE SPACE SHALL BE DESIGNED TO PROVIDE
<br />VENTILATION OVER AND ABOVE THAT REQUIRED BY TABLE 403.3.1.1 IN ACCORDANCE
<br />WITH ACCEPTED ENGINEERING PRACTICE.
<br />NEW EXIT SIGNAGE SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS:
<br />A. ALL REQUIRED EXIT SIGNS SHALL HAVE LETTERS SIX INCHES HIGH MINIMUM AND
<br />SHALL CONFORM WITH ALL APPLICABLE CODES.
<br />THE BUILDING IS FULLY SPRINKLERED. SPRINKLER MODIFICATION FOR NEW LAB TO BE
<br />DESIGNED PER NFPA 801 IN ACCORDANCE WITH FHA; THE FIRE PROTECTION CONTRACTOR
<br />SHALL PROVIDE FIRE PROTECTION DRAWINGS AS REQUIRED BY THE GOVERNING AUTHORITY.
<br />THE FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS TO THE ARCHITECT FOR
<br />REVIEW PRIOR TO COMMENCING WITH THE WORK.
<br />AREA OF WORK
<br />awmaw-MAILL
<br />Nelco Architecture, Inc.
<br />1200 Fifth Ave.
<br />Suite 1300
<br />Seattle, WA 98101
<br />Phone: (206) 408-8500
<br />WWW.NELSONWORLDWIDE.COM
<br />Owner/Client Representative:
<br />Firm Name: TERRAPOWER
<br />Attn: IAN VAN HOUTEN
<br />360.739.2364
<br />E-mail: IVANHOUTEN@TERRAPOWER.com
<br />Structural Engineer:
<br />Firm Name: SHUTLER CONSULTING ENGINEERS
<br />Attn: JOHN HEADLAND
<br />425.450.4075
<br />JOHNH@SHUTLER.com
<br />General Contractor:
<br />Firm Name: PATTISON GENERAL CONTRACTOR
<br />Attn: ANDY FORTINO
<br />T: 206.571.3478
<br />E-mail:ANDYF@PATTISONGC.com
<br />CLIENT.
<br />1=rrC--%1Po
<br />TERRAPOWER
<br />15800 •' ' WAY
<br />BELLEVUE, WA, •800
<br />3315 SEAWAY BLVD.
<br />EVERETT, WA 98203
<br />Description: No: Date:
<br />PERMIT SET 05/26/2021
<br />SEAL:
<br />CITY STAMP:
<br />REFLECTED CEILING
<br />Proj. # 20.0001110.001 Reviewed By: PA/PM
<br />1
<br />REFLECTED CEILING PLAN 0 2' ' 8`
<br />A2.2 1/4"=V-0°V_U
<br />3A2-2
<br />
|