Laserfiche WebLink
n <br />PROJECT TO BE ELECTRICAL AND MECHANICAL DESIGN -BUILD. NEW LIGHTING SHALL MEET <br />1. CEILING GRID START POINT (FULL TILE) <br />1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING <br />THE FOLLOWING MINIMUM REQUIREMENTS: <br />2. GWB CEILING THIS ROOM <br />HEIGHTS, LIGHT FIXTURES, SWITCH LOCATIONS, AND ASSOCIATED ITEMS. <br />A. IBC 1008.1 - ILLUMINATION REQUIREMENT <br />3. EXISTING EXPOSED STRUCTURE TO REMAIN, NO CEILING BEING <br />REFER TO ENGINEERING DRAWINGS FOR CIRCUITING, WIRING LAYOUT, AND <br />1. THE MEANS OF EGRESS, INCLUDING THE EXITDISCHARGE, SHALL BE <br />CONSTRUCTED <br />ADDITIONAL INFORMATION. ALL MEP -FP DEVICE LOCATIONS NOT SHOWN ON <br />ILLUMINATED AT ALL TIMES THE BUILDING SPACE SERVED BY THE <br />DRAWINGS, OR IN CONFLICT WITH MEP/FP DRAWINGS, ARE TO BE <br />MEANS OF EGRESS IS OCCUPIED. <br />COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. IN THE EVENT OF <br />B. IBC 1008.2.1 - ILLUMINATION LEVEL <br />DISCREPANCIES BETWEEN THE ARCHITECT'S REFLECTED CEILING PLAN AND <br />1. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1 <br />THE ENGINEERS' PLANS, IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING <br />FOOT-CANDLE (11 LUX) AT THE FLOOR LEVEL, <br />BEFORE ORDERING MATERIALS OR PROCEEDING WITH THE WORK. <br />C. IBC 1008.3 - ILLUMINATION EMERGENCY POWER <br />2. FOLLOWING COMPLETION OF THE CEILING TILE INSTALLATION, ALL JOINTS <br />1, THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL <br />AND GRID SHALL BE STRAIGHT, TRUE TO LINE, WITH EXPOSED SURFACES <br />NORMALLY BE PROVIDED BY THE PREMISE'S ELECTRIC SUPPLY. <br />FLUSH AND LEVEL. DIRTY OR DISCOLORED SURFACES OF TILE ARE TO BE <br />3 ) 1.1 LOCATIONS INCLUDE: DEDICATED EGRESS ROUTES IN LARGER ROOMS <br />CLEANED OR REPLACED, AND LEFT FREE OF DEFECTS. AFTER 30 DAYS FROM <br />�J OR SPACES, PUBLIC OR COMMON EGRESS ELEMENTS, ESSENTIAL <br />SUBSTANTIAL COMPLETION, INSPECT THE WORK AND ADJUST TILE NOT IN <br />PORTIONS OF THE INTERIOR EGRESS SYSTEM, INTERIOR EXIT <br />ALIGNMENT WITH OTHER CEILING TILES AND REPLACE MISSING OR DAMAGED <br />DISCHARGE ELEMENTS, AND EXTERIOR PORTIONS OF THE EXIT <br />UNITS. <br />DISCHARGE, INCLUDING INTERIOR EXIT STAIRWAYS & RAMPS. <br />3. WITHIN A ROOM OR AREA, THE CONTRACTOR SHALL ESTABLISH A SINGLE <br />2. PER IBC 1008.3.3, IN THE EVENT OF POWER SUPPLY FAILURE, AN <br />FLOOR ELEVATION THAT IS TO BE USED AS THE ORIGIN FOR ALL CEILING <br />EMERGENCY ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE THE <br />HEIGHTS ABOVE FINISHED FLOOR. <br />FOLLOWING AREAS: ELECTRICAL EQUIPMENT ROOMS, FIRE COMMAND CENTERS, <br />4. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL MEP/FP AND STRUCTURAL <br />FIRE PUMP ROOMS, GENERATOR ROMS, PUBLIC RESTROOMS WITH AN AREA <br />ELEMENTS. CONTRACTOR TO COORDINATE THE WORK OF ALL TRADES <br />GREATER THAN 300 SF. DURATION OF EMERGENCY POWER SHALL BE PER <br />NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS INDICATED. <br />1008.3.4: NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF STORAGE <br />INSTALL DUCTWORK TIGHT TO UNDERSIDE OF BEAMS. WITH A SMALL SPACE <br />BATTERIES, UNIT EQUIPMENT OR AN ON -SITE GENERATOR, ILLUMINATION LEVEL <br />LEGEND <br />TO AVOID VIBRATION. INSTALLATION AND/OR ALTERATION OF DUCTWORK, <br />UNDER EMERGENCY POWER PER 1008.3.5: INITIAL ILLUMINATION NOT LESS <br />PIPING OR OTHER EQUIPMENT THAT WILL REQUIRE FASCIAS, SOFFITS AND <br />THAN1 FC, MINIMUM AT ANY POINT OF 0.1 FC MEASURED ALONG THE PATH OF <br />OTHER TRANSITIONS IN CEILING HEIGHT SHALL BE REVIEWED WITH THE <br />EGRESS AT FLOOR LEVEL. <br />ARCHITECT PRIOR TO PROCEEDING. CONTRACTOR TO PROVIDE COMPLETE <br />3. EACH ROOM SHALL COMPLY WITH THE PROVISIONS OF C405.2 INTERIOR <br />LIGHTING CONTROLS. EACH AREA ENCLOSED BY <br />INTERNALLY ILLUMINATED EXIT SIGNAGE W/ BATTERY BACKUP <br />EXI T dEXI V <br />COORDINATION DRAWINGS FOR THE ARCHITECT AND ENGINEER'S REVIEW. <br />WALLS OR FLOOR -TO -CEILING <br />17 PER IBC SECTION 1013, CONFIRM OPERATION FOR EXISTING. <br />5. NEW FIRE, LIFE, SAFETY SYSTEM AS REQUIRED PER NEW WALL LAYOUT AND <br />PARTITIONS SHALL HAVE AT LEAST ONE MANUAL CONTROL FOR THE LIGHTING <br />ADD WHERE NOT EXISTING. ARROW = DIRECTION INDICATOR, <br />CURRENT CODE. ENGINEERING AND INSTALLATION BY BUILDING <br />SERVING THAT AREA. THE REQUIRED CONTROLS SHALL BE LOCATED WITHIN THE <br />IF REQUIRED <br />RECOMMENDED SUB -CONTRACTOR, <br />AREA SERVED BY THE CONTROLS OR BE A REMOTE SWITCH THAT IDENTIFIES <br />1X4 SURFACE MOUNTED LED 'LIGHT FIXTURE W/ WRAP AROUND <br />6. PROVIDE SMOKE DETECTORS THROUGHOUT TENANT AREAS IN ACCORDANCE <br />THE LIGHTS SERVED AND INDICATES THEIR STATUS. <br />ACRYLIC LENS IP54 <br />WITH LOCAL CODES AND MANUFACTURER'S RECOMMENDATIONS. <br />7. ALL CEILING MOUNTED DEVICES SHALL BE WHITE TO MATCH RAL COLOR. <br />C405.2.2.2 LIGHT REDUCTION CONTROLS. LIGHT REDUCTION CONTROLS NEED <br />& PROVIDE BLOCKING ABOVE CEILING REQUIRED FOR ALL CEILING MOUNTED <br />NOT BE PROVIDED IN THE FOLLOWING AREAS AND SPACES: <br />NEW 2X4 LAY -IN LED LIGHT FIXTURE, CLEAN ROOM LIGHT FITTING <br />EQUIPMENT. PROVIDE ADDITIONAL SUPPORT FOR LIGHT FIXTURES AS <br />1. AREAS THAT ARE CONTROLLED BY AN OCCUPANT -SENSING DEVICE. <br />IP65 <br />RECOMMENDED BY FIXTURE MANUFACTURER, <br />2. CORRIDORS, EQUIPMENT ROOMS, STOREROOMS, RESTROOMS, PUBLIC <br />9. LOCATE ANY CONTROLS THAT NEED ACCESSING OVER CEILING TILE AREAS. <br />LOBBIES, ELECTRICAL OR MECHANICAL ROOMS. <br />HATCH INDICATES "NIGHT LIGHT" FOR EGRESS ILLUMINATION <br />NOT PLACE ANY ABOVE GYPSUM BOARD CEILINGS, UNLESS APPROVED BY <br />3. DAYLIGHT SPACES COMPLYING WITH SECTION C405.2.2.3.2. <br />NOT LESS THAN 1 FC PER IBC SECTION 1008.2.1 WITH <br />ARCHITECT. <br />EMERGENCY POWER PER 1008.3.3 <br />10. PROVIDE CEILING ACCESS REQUIRED FOR EQUIPMENT AND SYSTEM <br />C405.2.2. AUTOMATIC TIME SWITCH CONTROL DEVICES. AUTOMATIC TIME <br />MAINTENANCE. MATCH ADJACENT CEILING FINISH U.N.O. SYSTEMS AND <br />SWITCH CONTROLS NEED NOT BE IN SPACES CONTROLLED BY OCCUPANCY <br />IMM. <br />EQUIPMENT REQUIRING ACCESS SHALL BE LOCATED AT ACCESSIBLE CEILINGS - <br />SENSORS. <br />INDICATES DIMMABLE FIXTURE <br />ACCESS PANELS NOT SHOWN ON DRAWINGS SHALL NOT BE INSTALLED IN <br />GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL. <br />C405.2.1 OCCUPANCY SENSORS. OCCUPANCY SENSORS SHALL BE INSTALLED IN <br />11. ALL ACCESS PANELS IN GYPSUM BOARD CEILINGS SHALL BE FRAMELESS; <br />ALL CLASSROOMS, CONFERENCE/ MEETING ROOMS, EMPLOYEE LUNCH AND <br />LOCATIONS SHALL BE COORDINATED WITH ARCHITECT. GROUP DEVICES TO <br />BREAK ROOMS, PRIVATE OFFICES, RESTROOMS, WAREHOUSE SPACES, STORAGE <br />MINIMIZE THE NUMBER AND SIZE OF ACCESS PANELS. <br />ROOMS AND JANITORIAL CLOSETS, AND OTHER SPACES 300 SQUARE FEET (28 <br />4 D MULTI DETECTOR WITH SOUNDER <br />12. ALL CONDUITS, BOXES, DUCTS, HVAC UNITS, PIPES, ETC., SHALL BE INSTALLED <br />M2) OR LESS ENCLOSED BY FLOOR -TO- CEILING HEIGHT PARTITIONS. THESE <br />AS HIGH AS POSSIBLE, NOT LOWER THAN 8" ABOVE LINE OF HIGHEST <br />AUTOMATIC CONTROL DEVICES SHALL BE INSTALLED TO AUTOMATICALLY TURN <br />2'X4' SUSPENSION GRID CEILING TILE: EXPOSED 15/16" GRID W/ <br />FINISHED CEILING. <br />OFF LIGHTS WITHIN 30 MINUTES OF ALL OCCUPANTS LEAVING THE SPACE, AND <br />- INTEGRAL GASKET HUNG FROM THE UNDERSIDE OF THE <br />13. THERE SHALL BE NO COMBUSTIBLE MATERIALS IN THE PLENUM SPACE. <br />SHALL EITHER BE MANUAL ON OR SHALL BE CONTROLLED TO AUTOMATICALLY <br />ENGINEERED FLOOR JOIST, SEE SHEET A6.1 FOR DETAILED <br />14. WHEN MULTIPLE SWITCHES OCCUR IN CLOSE PROXIMITY GANG UNDER SINGLE <br />TURN THE LIGHTING ON TO NOT MORE THAN 50 PERCENT POWER. <br />SPECIFICATIONS. <br />SWITCH PLATE. <br />15. FURNISH AND INSTALL NEW THERMOSTATS AS REQUIRED. INSTALL CLOSE TO <br />C405.2.1 OCCUPANCY SENSORS. OCCUPANCY SENSORS SHALL BE INSTALLED IN <br />DOOR OPENINGS, DO NOT INSTALL IN CENTER OF WALL. ARCHITECT AND <br />ALL NEW ROOMS. THESE CONTROLS DEVICES SHALL BE CAPABLE OF <br />CLIENT TO APPROVE ALL LOCATIONS. <br />AUTOMATICALLY REDUCING THE LIGHTING POWER IN RESPONSE TO AVAILABLE <br />ONE LAYER OF 5/8" TYPE X GWB CEILING DIRECTLY ATTACHED TO <br />16. ALL LIGHTS TO BE CONTROLLED BY MOTION SENSOR. PROVIDE OVERRIDE <br />DAYLIGHT BY EITHER ONE OF THE FOLLOWING METHODS: <br />UNDERSIDE OF FLOOR JOISTS, ALL JOINTS TAPED AND SEALED; <br />SWITCH AT ALL CONFERENCE ROOMS <br />1. CONTINUOUS DIMMING USING DIMMING BALLASTS AND <br />FINISHED WITH HYGIENIC PAINT. <br />17. ALL LAMPS SHALL BE IDENTICAL FROM ONE MANUFACTURER IN SAME <br />DAYLIGHT -SENSING AUTOMATIC CONTROLS THAT ARE CAPABLE OF REDUCING <br />TEMPERATURE, UON. <br />THE POWER OF GENERAL LIGHTING IN THE DAYLITE ZONE CONTINUOUSLY TO <br />15. IN EXISTING ALTERED SPACE, REPAIR AND/OR REPLACE COMPONENTS <br />LESS THAN 20 PERCENT OF RATED POWER AT MAXIMUM LIGHT OUTPUT. <br />SWITCH DISCONNECTOR <br />NECESSARY TO INSURE ALL EXISTING AND OR RELOCATED LIGHT FIXTURES <br />2. STEPPED DIMMING USING MULTI -LEVEL SWITCHING AND <br />ARE FUNCTIONING, INCLUDING BUT NOT LIMITED TO LAMPS, BALLASTS, AND <br />DAYLIGHT -SENSING CONTROLS THAT ARE CAPABLE OF REDUCING LIGHTING <br />INDICATES CEILING HEIGHT ABOVE FINISHED FLOOR <br />LENSES, RELAMP ALL EXISTING AND RELOCATED FIXTURES TO REMAIN. <br />POWER AUTOMATICALLY. THE SYSTEM SHALL PROVIDE A MINIMUM OF TWO <br />CONTROL CHANNELS PER ZONE AND BE INSTALLED IN A MANNER SUCH THAT AT <br />LEAST CONTROL <br />RPOWER <br />MULTI DETECTOR <br />CEILING TES <br />T <br />DESIGNNE LIGHTING AND ANOTHER CONTROL TEP IS NO GREATER THAN <br />35 PERCENT OF DESIGN POWER, AND THE SYSTEM IS CAPABLE OF <br />P <br />1. CENTER CEILING GRID IN ROOM OR AREA IN TWO DIRECTIONS, TYPICAL UON. <br />AUTOMATICALLY TURNING THE SYSTEM OFF. <br />(9 PIR/OCCUPANCY SENSOR <br />2. CENTER LIGHT FIXTURES/SPRINKLER HEAD/CEILING ELEMENT IN 24" PORTION <br />C408.2.3 FUNCTIONAL TESTING. TESTING SHALL ENSURE THAT CONTROL HARDWARE AND <br />OF 48" CEILING TILE, TYPICAL UON, <br />3. LOCATE ALL LIGHT FIXTURES, SPEAKERS, LIFE -SAFETY DEVICES AND SIMILAR <br />SOFTWARE ARE CALIBRATED, ADJUSTED, PROGRAMMED AND IN PROPER WORKING <br />CONDITION IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS AND MANUFACTURER'S <br />SUPPLY DIFFUSER - ACTUAL LOCATION TO BE COORDINATED W/ <br />CEILING ELEMENTS, ETC., IN THE CENTER OF CEILING TILE IN BOTH <br />INSTALLATION INSTRUCTIONS. <br />HVAC DESIGN -BUILD <br />DIRECTIONS AND ALIGN WITH ADJACENT FIXTURES, DEVICES OR HEADS IN A <br />NEW HVAC SOLUTION SHALL MEET THE FOLLOWING MINIMUM REQUIREMENT: <br />RUN OR ROW, U.N.O. <br />4. REFER TO ELEVATIONS AND SECTIONS FOR MOUNTING HEIGHTS OF WALL <br />A. NEW MECHANICAL ELEMENTS, INCLUDING BUT NOT LIMITED TO PACKAGED UNITS, <br />SURFACE MOUNTED LIGHT FIXTURES. <br />CONTROLS, DAMPERS, DUCTING, COMMISSIONING; TO FULLY COMPLY WITH THE <br />EXHAUST GRILLE - ACTUAL LOCATION TO BE COORDINATED W/ <br />5. PROVIDE SEISMIC BRACING AT ALL SUSPENDED CEILING SYSTEMS. SUSPENDED <br />PROVISIONS OF WSEC SECTION C403. <br />HVAC DESIGN -BUILD <br />CEILING AND BRACING SHALL MEET THE MINIMUM REQUIREMENTS OF CISCA <br />B. VENTILATION REQUIREMENTS FOR RESTROOMS PER WASHINGTON STATE <br />AND ASCE 7-10 SECTION 13.5.6. AS SUMMARIZED ON SHEET A8.1 <br />MECHANICAL CODE (WAC 51-52) <br />C. ALL OCCUPIED SPACES SHALL BE VENTILATED BY MECHANICAL MEANS IN <br />ACCORDANCE WITH SECTION 403 IN THE 2015 INTERNATIONAL MECHANICAL CODE <br />THE VENTILATION SYSTEM SERVING THE SPACE SHALL BE DESIGNED TO PROVIDE <br />VENTILATION OVER AND ABOVE THAT REQUIRED BY TABLE 403.3.1.1 IN ACCORDANCE <br />WITH ACCEPTED ENGINEERING PRACTICE. <br />NEW EXIT SIGNAGE SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS: <br />A. ALL REQUIRED EXIT SIGNS SHALL HAVE LETTERS SIX INCHES HIGH MINIMUM AND <br />SHALL CONFORM WITH ALL APPLICABLE CODES. <br />THE BUILDING IS FULLY SPRINKLERED. SPRINKLER MODIFICATION FOR NEW LAB TO BE <br />DESIGNED PER NFPA 801 IN ACCORDANCE WITH FHA; THE FIRE PROTECTION CONTRACTOR <br />SHALL PROVIDE FIRE PROTECTION DRAWINGS AS REQUIRED BY THE GOVERNING AUTHORITY. <br />THE FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS TO THE ARCHITECT FOR <br />REVIEW PRIOR TO COMMENCING WITH THE WORK. <br />AREA OF WORK <br />awmaw-MAILL <br />Nelco Architecture, Inc. <br />1200 Fifth Ave. <br />Suite 1300 <br />Seattle, WA 98101 <br />Phone: (206) 408-8500 <br />WWW.NELSONWORLDWIDE.COM <br />Owner/Client Representative: <br />Firm Name: TERRAPOWER <br />Attn: IAN VAN HOUTEN <br />360.739.2364 <br />E-mail: IVANHOUTEN@TERRAPOWER.com <br />Structural Engineer: <br />Firm Name: SHUTLER CONSULTING ENGINEERS <br />Attn: JOHN HEADLAND <br />425.450.4075 <br />JOHNH@SHUTLER.com <br />General Contractor: <br />Firm Name: PATTISON GENERAL CONTRACTOR <br />Attn: ANDY FORTINO <br />T: 206.571.3478 <br />E-mail:ANDYF@PATTISONGC.com <br />CLIENT. <br />1=rrC--%1Po <br />TERRAPOWER <br />15800 •' ' WAY <br />BELLEVUE, WA, •800 <br />3315 SEAWAY BLVD. <br />EVERETT, WA 98203 <br />Description: No: Date: <br />PERMIT SET 05/26/2021 <br />SEAL: <br />CITY STAMP: <br />REFLECTED CEILING <br />Proj. # 20.0001110.001 Reviewed By: PA/PM <br />1 <br />REFLECTED CEILING PLAN 0 2' ' 8` <br />A2.2 1/4"=V-0°V_U <br />3A2-2 <br />