|
(a:
<br />INT. DOOR HEAD
<br />3"=1 `-0"
<br />f€i?+►Z�7I I
<br />7I11111i11ltl
<br />i
<br />I
<br />DOOR AND TRIM------Jj
<br />a
<br />WALL TYPE AS SCHEDULED
<br />STEEL RUNNER
<br />BUILDING STANDARD FRAME
<br />DOOR SILENCERS
<br />OR SMOKE SEAL
<br />DOOR AS SCHEDULED
<br />WALL TYPE AS SCHEDULED
<br />20 GA, STEEL STUD
<br />BUILDING STANDARD FRAME
<br />DOOR SILENCERS
<br />OR SMOKE SEAL
<br />DOOR AS SCHEDULED
<br />#
<br />FLOOR FINISH MATL
<br />SAME ON BOTH
<br />SIDES OF OPENING
<br />OR EPDXY PAINT
<br />AND CONCRETE SLAB
<br />CONCRETE SLAB OR
<br />EXPDXY FLOOR PAINT
<br />DOOR
<br />TRANSITION STRIP
<br />RESILIENT SHEET FLOORING
<br />DOOR, ANII FRAME SCHEDULE:
<br />DOOR, SCHEDULE NOTES � I
<br />__- ___ 11 I - __ -1-1- - ___ ______ __ - -1 - ____ ____ ___ __ - ___ - - ___ 1____1__1______1_ 1 ______ -I N E LSON
<br />DOOR HARDWARE NOTES
<br />TYPE A: EXTERIOR ENTRANCE TYPE LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR
<br />SWEEP
<br />TYPE B: OFFICE TYPE LOCKSET
<br />TYPE C: OFFICE TYPE LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR SWEEP
<br />TYPE D: PUSH/PULL, CLOSER
<br />TYPE E: PASSAGE SET
<br />TYPE F. PASSAGE SET, CLOSER
<br />TYPE G: STOREROOM LOCKSET, CLOSER
<br />TYPE H: STOREROOM LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR SWEEP
<br />TYPE I: PRIVACY WITH 'IN USE' INDICATOR
<br />TYPE K: CARD READER WITH KEY OVERRIDE, FAIL SAFE, UNLOCKED ON PRIVATE OR FREE SIDE OF DOOR
<br />TO ALLOW FOR FREE EGRESS, CLOSER
<br />TYPE L: STOREROOM LOCK ON ACTIVE 'LEAF, DUMMY LEVER ON INACTIVE LEAF, MANUAL FLUSH BOLTS
<br />AT TOP AND BOTTOM
<br />TYPE M: EXISTING EXTERIOR DOOR ENTRANCE TYPE LOCKSET. CLEAN AND ADJUST EXISTING HINGES
<br />AND CLOSER, ADJUST CLOSER TO CURRENT ACCESSIBILITY REQUIREMENTS (ANSI 117.1,
<br />SECTION 404), NEW WEATHERSTRIPPING
<br />TYPE N: DUMMY LEVERS AND ROLLER CATCHES ON BOTH LEAFS
<br />TYPE 0: MECHANICAL KEYPAD LOCK
<br />DOOR SUPPLIER SHOP DRAWINGS ARE REQUIRED FOR OWNER/ ARCHITECT REVIEW PRIOR TO MANUFACTURE
<br />TO CONFIRM CONFIGURATION AND HARDWARE
<br />I
<br />DOORH,
<br />D041,
<br />DOOR
<br />1 y .l, a..+ E . i
<br />u" 7 ! i
<br />HEIGHT :
<br />NUMBER
<br />ROOM NAME
<br />S.
<br />TVPE ,
<br />z._
<br />_
<br />i k, P R, A i
<br />' l'"`
<br />�,�.+L.
<br />' -F is
<br />�n� �11,1�
<br />(" , #„+'
<br />_'P'`1 s
<br />�
<br />;�
<br />T 3 -" C'
<br />��E
<br />1�9
<br />°�.:La
<br />p v
<br />4: _..�i..<,a..
<br />...
<br />{
<br />a..a ..... ,.,,
<br />(..: ,, .....{
<br />,..,
<br />i'1, ._pt,. a�
<br />i 3H.'�,?J s
<br />,�
<br />_a t�; ,..
<br />u�
<br />I S
<br />1 1 1
<br />-'
<br />'�
<br />'*.�'-� .'}.1 -3"`fi
<br />2� Ie.
<br />.a fret
<br />3t
<br />v .s,
<br />�.^v,
<br />l.+; ll u" iT
<br />...
<br />, •c. n.
<br />^.ft Y: °...-
<br />-. t; ...' '
<br />�,b
<br />�
<br />`l ._.... .., .,1 �..?'iw.?d.. i # 3 3�0'�, �l s 3. Sµl E.�F.E +..` { $f,i? rt-2 1�.;tS 9>'F.t}�
<br />t
<br />�f_F _
<br />��
<br />� _
<br />f. ,
<br />—
<br />—
<br />a!V t
<br />� ¢4,
<br />��! �
<br />? , �
<br />360 �
<br />A
<br />,.�-t cs
<br />?.....v
<br />i . ,.9"'i -..„� ` is
<br />_!
<br />-,s {i
<br />5��.
<br />'i ',x e-
<br />._.s k,°
<br />i `;
<br />_
<br />-
<br />ld
<br />r ;.j-'. p-
<br />7� fi,;i
<br />; ^
<br />S A`6 1
<br />-�i s r s
<br />"t
<br />+.L.,.s 3 t' XTS a 1.N µ;.pi, .`-i'a, DOORS
<br />'J
<br />...
<br />x.
<br />i"�t=}'o:.9Y�
<br />�:
<br />!' 3'i
<br />.�A1141a 4
<br />Fxi'�. ,,'I
<br />5�.'�,
<br />&D
<br />R,APIUD ROLL
<br />-?0 'A\
<br />... ..il''
<br />'t,
<br />a,.
<br />"3rl '-1`:.
<br />i..s!!'�,S' S
<br />..
<br />_.
<br />1
<br />�
<br />�>;if:,'��,,
<br />d.
<br />��� -p ' l r`Y ""j'i LNG .,� .. t•s`•:.
<br />,. _,
<br />.S.
<br />,I'if
<br />....,
<br />...c '?
<br />�.
<br />i��.`��
<br />a
<br />,.�
<br />,.'tai,
<br />,...
<br />;er,
<br />rlU'51 `�_.,
<br />°wa)' N. ACC. s.A', at.: ROLL N�.�'r.�-s # ..: �! s `-""""r e `4 `P
<br />}'i.i �. 1+, �i �.,.,'a
<br />1 �..3L
<br />....
<br />,..'.-9rs
<br />..
<br />y± l•, t+
<br />tm a ,
<br />...
<br />�L4'.. y,.,,
<br />"'3
<br />_
<br />.. S-I
<br />F lb..+ � e5'3�
<br />�3Er`i'! 3 �...J
<br />�,�
<br />,a %: �_F�t
<br />� S
<br />,:-3 S'3';';f",
<br />R"sz i. s.`ER
<br />DYNIArs, .Tt PAPz,C) ROLL 100t.ef t Vr/ i.;A7_.',`( d.. '''a-.i4a.i d..:,
<br />..7
<br />3 �
<br />RAPID � OUL
<br />..
<br />FLOOR
<br />,,�, g
<br />'"._r->
<br />E
<br />v.- „..f ;°
<br />f.-,
<br />,.,
<br />;'"
<br />'i.'
<br />�'
<br />.i . is
<br />,:'�
<br />} ..<,.-..
<br />e i. ., .,,,.,
<br />pp
<br />.,
<br />3^
<br />'j
<br />•'� '��'-r
<br />n? 2>
<br />7 .i
<br />a�' �'� '... -' d� i l ! , 9 i5 "2: ,.,�
<br />.� , ..,.,.� 7:. :-s.s..,. s,_ �... _ L..:O , e , ,.., , ,_. x..... d . r x ..s . ,'- ,..._, -., 0C)R-7
<br />,J. S,
<br />'wT
<br />..
<br />'" ,.
<br />.. ,
<br />02 .,,., �.s...,„S.
<br />_
<br />m.
<br />,.�
<br />A'� N` �
<br />_d.
<br />.'{' NI
<br />o AI,, SY ;
<br />i.9f3"ild.,'..
<br />".), ...
<br />_- 71 ...,.!'i a, ; L , ;
<br />3 r,;, 5 ':; }"'1 e fSET ""� itt'! - "x 'i
<br />. s`...,�:'.,.
<br />4.ny`g-t'`�. IJ�:
<br />,... 1,:;{
<br />.ai. i�S a.,
<br />r,,_
<br />Ma, _ . 1 . �
<br />F
<br />-t 99�
<br />di _ja..�3r
<br />�dl�a�
<br />q H
<br />d�t�'i
<br />..
<br />».
<br />�y
<br />8
<br />P ?, fl,.�?T
<br />I
<br />d-��Yj
<br />_
<br />3�...i
<br />Y JA �
<br />�.>,.�
<br />$
<br />� .r'S 1 �.s EXIST 3.,laa d. a. ,.- i33 � �..r a,�.'�,.�
<br />.,
<br />_
<br />V
<br />i, . J
<br />io.
<br />> JJ
<br />..
<br />DOOR TYPES
<br />PER DOOR SCHEDULE
<br />LU
<br />w
<br />J
<br />LO
<br />ill
<br />0
<br />0
<br />LL
<br />L
<br />0
<br />F (FLUSH)
<br />R
<br />PER DOOR SCHEDULE
<br />IrIA
<br />C
<br />HIGH SPEED ROLL -UP DOOR
<br />FRA,ME TYPES
<br />I
<br />U
<br />I
<br />ROOM FINISH SCHEDULE
<br />F LOOR BASE. WALLS CEILING
<br />ROOM ROOM NORTH EAST SOUTH WEST REMARKS
<br /># NAME SUBSTRATE
<br />MATERIAL FINISH FINISH MATERIAL FINISH MATERI ISH MATERIAL FINISH MATERIAL FINISH MATERIAL HEIGHT
<br />101 TECH, ZONE EXIST. SOG R-2 B-2 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB UNDERSIDE OF
<br />FLOOR JOISTS
<br />102 R&D LAB EXIST. SOG R-1 B-1 GWB PT-1/CR-1 GWB PT- I/CR-1 GVVB PT-1/CR-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE
<br />103 LOBBY EXIST. SOG P; 1 B-1 GWB PT-1/CR-1 GWB PT-1/CR-1 GWB PT-1/CP.-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE
<br />104 R&D LAB EXIST. SOG R-1 B-1 GWB PT-I/CR-1 GWB PT-1/CR-1 GWB PT-1/CR-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE
<br />105 TECH. ZONE EXIST. SOG R-2 B-2 GWB GWB GWB — GWB UNDERSIDE OF
<br />PT-1 PT-1 PT-1 PT-1 GWB
<br />FLOOR JOISTS
<br />FINISH g ROOM FINISH GENERAL .
<br />SPECIFICATIONS:
<br />FLOOR FINISHES: WALL FINISHES® 1, ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS, SCHEDULES, AND 16. NOT USED,
<br />FLOOR FINISH TO BE R-1, UON WALL FINISH TO BE PT-1, UON SPECIFICATIONS ARE NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS U.N.O. THE 1T PROVIDE TRANSITION STRIPS ,AT ALL FLOORING MATERIAL CHANGES, UNLESS
<br />CONTRACTOR AND SUBCONTRACTORS SHALL SUBMIT PRODUCTS AND FINISHES NOTED OTHERWISE PER 6/A6.1. RESILIENT TRANSITION STRIPS TO MATCH BASE
<br />R RESILIENT SHEET FLOORING p� EPDXY PAINT (GENERAL) AS INDICATED IN THE DOCUMENTS, COLOR U.N.O. WHEN PROVIDED, REFER TO PLAN FOR ADDITIONAL DETAIL
<br />1 TO MATCH TAT LAB FLOORING SIKA HYGIENE HD 2. NOTIFY ARCHITECT OF SCHEDULED FINISHES THAT ARE UNAVAILABLE OR LOCATIONS,
<br />DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A SUBSTITUTION 18. WHERE FLOOR FINISH THICKNESS REQUIRES, FLOAT FLOOR SLAB AT FINISH
<br />EPDXY PAINT CR 8" WALL CRASH RAIL 36" AFF CAN BE SELECTED WITHOUT JEOPARDIZING THE CONSTRUCTION SCHEDULE, TRANSITION AREAS A MINIMUM OF 2'-0" OR TO A ACHIEVE A MAXIMUM SLOPE
<br />ItACROV'YN, TBD S. REFER TO THE MATERIAL SCHEDULE FOR MANUFACTURER, PRODUCT/STYLE OF 1:20 (WHICHEVER IS GREATER) TO ACHIEVE A UNIFORM AND FLUSH
<br />NAME, COLOR SPECIFICATION. TRANSITION BETWEEN FINAL FINISHED SURFACES.
<br />4. INSTALL ALL FINISH MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S 19. ACCESS PANELS, VISIBLE COVES OR ENCASEMENTS, VISIBLE ELECTRICAL
<br />WALLBASE: RECOMMENDED SPECIFICATIONS, SURFACE PREPARATION, ADHESIVES AND PANELS, ETC. TO SHALL BE PAINTED TO MATCH ADJACENT SURFACES,
<br />BACKINGS: INCLUDING WALLCOVERINGS, COATINGS, FLOORING MATERIALS, 20. ALL INTERIOR WALL & CEILING FINISHES AND TRIM IN R&D LAB TO SHALL BE
<br />VI/ALL BASE TO BE B-1, UON LAMINATES, ETC. AS PER NFPA 801.5.5:
<br />B INTEGRAL COVE BASE, 6" MILLWOPI FINISHES. 5. PREPARE ALL SURFACES TO RECEIVE NEW FINISH SCHEDULED, TYPICAL FLOOR FINISH SHALL BE CLASS I IN ACCORDANCE WITH ASTM E648 (FLOOR
<br />ET PLASTIC LAMINATE (BASE &/OR UPPER) THROUGHOUT. CONCRETE SLAB TO RECEIVE NEW SEAL WHERE SAW -CUT AND RADIANT PANEL CRITICAL RADIANT FLUX OF NOT LESS THAN 0,45 W/CM2)
<br />TBD PATCHED. CEILING AND WALL FINISH SHALL BE CLASS A IN ACCORDANCE WITH ASTM
<br />6, ALL WALLS (EXISTING AND NEW) TO BE PT'-1, UON. E84 (FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE
<br />LAY ON PVC 7. VINYL BASE, B-1 THROUGHOUT, LION. BASE SHALL RUN CONTINUOUSLY, DEVELOPMENT INDEX OF NOT MORE THAN 450).
<br />2 1
<br />PL PLASTIC LAMINATE (COUNTERTOP) 8, SEE REFLECTED CEILING PLANS FOR CEILING FINISHES, CEILING TILE AND GRID
<br />RICHLITE, COLOR TBD SPECIFICATIONS,
<br />2 90 ALL GWB SURFACES TO BE SMOOTH FINISH AND RECEEVE TWO COATS OF EPDXY
<br />PAINT WITH EGGSHELL FINISH.
<br />10, GWB SURFACES TO RECEIVE LEVEL 4 FINISH PRIOR TO PAINTING, UNO, REFER
<br />ALTERNATE TRESPA TOPL83 TO FINISH LEGEND FOR EXCEPTIONS.
<br />LABORATORY FURNITURE 11. ALL PAINT MATERIALS, PREPARATION AND WORKMANSHIP SHALL CONFORM TO
<br />REQUIREMENTS OF THE LATEST EDITION OF THE ARCHITECTURAL PAINTING
<br />SPECIFICATION MANUAL BY THE MASTER PAINTERS INSTITUTE, THE PAINTING
<br />SUBCONTRACTOR SHALL ENSURE THAT ALL PAINTS COMPLY WITH THE
<br />CEILING PRODU S- MUNICIPAL & STATE CODES AND BUILDING REGULATIONS FOR LOW VOC
<br />ARMSTRONG CLEAN ROOM ACT EMISSIONS,
<br />11 REFER TO DOOR SCHEDULE SHEET A6,1 FOR DOOR AND DOOR FRAME FINISHES,
<br />13. WHERE INTERIOR DOOR AND DOOR FRAMES ARE TO BE PAINTED, COLOR TO
<br />MAT CH 1 ADJACENT WALL SURFACES,
<br />14, PLASTIC LAMINATE, PL-1 AT ALL EXPOSED SURFACES OF BASE AND UPPER
<br />CABINETS, UON, PLASTIC LAMINATE PL-2 AT ALL COUNTERTOPS AND
<br />BACKSPLASHES, 'UON.
<br />15. REFER TO THIS SHEET FOR FINISH LEGEND & SCHEDULE,
<br />eb Architecture, Inc.
<br />1200 Fifth Ave.
<br />SuIIte 1300
<br />Seattle, WA 98101
<br />Phone: (206) 408-8500
<br />WWW.NELSONWORLDWIDE.COMi
<br />Owner/Client Representative,
<br />Firm Name: TERRAPOWER
<br />Attn: !AN VAN HOUTEN
<br />360.739.2364
<br />E-mail: IVANHOUTEN@TERRAPOWER.com
<br />Structural Engineer -
<br />Firm Name: SHUTLER CONSULTING ENGINEERS
<br />Attn: JGHN HEADLAND
<br />425.450,4075
<br />3ONNH@SHUTLER.com
<br />General Contractor°
<br />Firm Name: PATTISON GENERAL CONTRACTOR
<br />Attm ANDY FORTINO
<br />T: 206.5710 3478
<br />E-mail:AN DYF@ PAiTISONGC,com
<br />CLIENT:
<br />ra Pow,,
<br />,
<br />3315 SEAWAY BLVD.
<br />EVER , WA 98203
<br />Description: No: Date:
<br />PERMI-f SET 05/26/2.021
<br />SEAL:
<br />6 TEREED6
<br />ARUPFIfT OT I
<br />M G, L.A
<br />ATE AFF', �b TIN
<br />CITY STAMP:
<br />#20,0001110.001 Reviewed By: PA/PM
<br />
|