Laserfiche WebLink
(a: <br />INT. DOOR HEAD <br />3"=1 `-0" <br />f€i?+►Z�7I I <br />7I11111i11ltl <br />i <br />I <br />DOOR AND TRIM------Jj <br />a <br />WALL TYPE AS SCHEDULED <br />STEEL RUNNER <br />BUILDING STANDARD FRAME <br />DOOR SILENCERS <br />OR SMOKE SEAL <br />DOOR AS SCHEDULED <br />WALL TYPE AS SCHEDULED <br />20 GA, STEEL STUD <br />BUILDING STANDARD FRAME <br />DOOR SILENCERS <br />OR SMOKE SEAL <br />DOOR AS SCHEDULED <br /># <br />FLOOR FINISH MATL <br />SAME ON BOTH <br />SIDES OF OPENING <br />OR EPDXY PAINT <br />AND CONCRETE SLAB <br />CONCRETE SLAB OR <br />EXPDXY FLOOR PAINT <br />DOOR <br />TRANSITION STRIP <br />RESILIENT SHEET FLOORING <br />DOOR, ANII FRAME SCHEDULE: <br />DOOR, SCHEDULE NOTES � I <br />__- ___ 11 ­­ I -­ __­ -1-1- - ___ __­____ ­ ­ __ - -1 - ____ ____ ___ __ - ___ - - ___ ­1_­___­1__1_­_____1_ ­­1 _­_____ -I N E LSON <br />DOOR HARDWARE NOTES <br />TYPE A: EXTERIOR ENTRANCE TYPE LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR <br />SWEEP <br />TYPE B: OFFICE TYPE LOCKSET <br />TYPE C: OFFICE TYPE LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR SWEEP <br />TYPE D: PUSH/PULL, CLOSER <br />TYPE E: PASSAGE SET <br />TYPE F. PASSAGE SET, CLOSER <br />TYPE G: STOREROOM LOCKSET, CLOSER <br />TYPE H: STOREROOM LOCKSET, CLOSER, WEATHER STRIPPING, SURFACE APPLIED DOOR SWEEP <br />TYPE I: PRIVACY WITH 'IN USE' INDICATOR <br />TYPE K: CARD READER WITH KEY OVERRIDE, FAIL SAFE, UNLOCKED ON PRIVATE OR FREE SIDE OF DOOR <br />TO ALLOW FOR FREE EGRESS, CLOSER <br />TYPE L: STOREROOM LOCK ON ACTIVE 'LEAF, DUMMY LEVER ON INACTIVE LEAF, MANUAL FLUSH BOLTS <br />AT TOP AND BOTTOM <br />TYPE M: EXISTING EXTERIOR DOOR ENTRANCE TYPE LOCKSET. CLEAN AND ADJUST EXISTING HINGES <br />AND CLOSER, ADJUST CLOSER TO CURRENT ACCESSIBILITY REQUIREMENTS (ANSI 117.1, <br />SECTION 404), NEW WEATHERSTRIPPING <br />TYPE N: DUMMY LEVERS AND ROLLER CATCHES ON BOTH LEAFS <br />TYPE 0: MECHANICAL KEYPAD LOCK <br />DOOR SUPPLIER SHOP DRAWINGS ARE REQUIRED FOR OWNER/ ARCHITECT REVIEW PRIOR TO MANUFACTURE <br />TO CONFIRM CONFIGURATION AND HARDWARE <br />I <br />DOORH, <br />D041, <br />DOOR <br />1 y .l, a..+ E . i <br />u" 7 ! i <br />HEIGHT : <br />NUMBER <br />ROOM NAME <br />S. <br />TVPE , <br />z._ <br />_ <br />i k, P R, A i <br />' l'"` <br />�,�.+L. <br />' -F is <br />�n� �11,1� <br />(" , #„+' <br />_'P'`1 s <br />� <br />;� <br />T 3 -" C' <br />��E <br />1�9 <br />°�.:La <br />p v <br />4: _..�i..<,a.. <br />... <br />{ <br />a..a ..... ,.,, <br />(..: ,, .....{ <br />,.., <br />i'1, ._pt,. a� <br />i 3H.'�,?J s <br />,� <br />_a t�; ,.. <br />u� <br />I S <br />1 1 1 <br />-' <br />'� <br />'*.�'-� .'}.1 -3"`fi <br />2� Ie. <br />.a fret <br />3t <br />v .s, <br />�.^v, <br />l.+; ll u" iT <br />... <br />, •c. n. <br />^.ft Y: °...- <br />-. t; ...' ' <br />�,b <br />� <br />`l ._.... .., .,1 �..?'iw.?d.. i # 3 3�0'�, �l s 3. Sµl E.�F.E +..` { $f,i? rt-2 1�.;tS 9>'F.t}� <br />t <br />�f_F _ <br />�� <br />� _ <br />f. , <br />— <br />— <br />a!V t <br />� ¢4, <br />��! � <br />? , � <br />360 � <br />A <br />,.�-t cs <br />?.....v <br />i . ,.9"'i -..„� ` is <br />_! <br />-,s {i <br />5��. <br />'i ',x e- <br />._.s k,° <br />i `; <br />_ <br />- <br />ld <br />r ;.j-'. p- <br />7� fi,;i <br />; ^ <br />S A`6 1 <br />-�i s r s <br />"t <br />+.L.,.s 3 t' XTS a 1.N µ;.pi, .`-i'a, DOORS <br />'J <br />... <br />x. <br />i"�t=}'o:.9Y� <br />�: <br />!' 3'i <br />.�A1141a 4 <br />Fxi'�. ,,'I <br />5�.'�, <br />&D <br />R,APIUD ROLL <br />-?0 'A\ <br />... ..il'' <br />'t, <br />a,. <br />"3rl '-1`:. <br />i..s!!'�,S' S <br />.. <br />_. <br />1 <br />� <br />�>;if:,'��,, <br />d. <br />��� -p ' l r`Y ""j'i LNG .,� .. t•s`•:. <br />,. _, <br />.S. <br />,I'if <br />...., <br />...c '? <br />�. <br />i��.`�� <br />a <br />,.� <br />,.'tai, <br />,... <br />;er, <br />rlU'51 `�_., <br />°wa)' N. ACC. s.A', at.: ROLL N�.�'r.�-s # ..: �! s `-""""r e `4 `P <br />}'i.i �. 1+, �i �.,.,'a <br />1 �..3L <br />.... <br />,..'.-9rs <br />.. <br />y± l•, t+ <br />tm a , <br />... <br />�L4'.. y,.,, <br />"'3 <br />_ <br />.. S-I <br />F lb..+ � e5'3� <br />�3Er`i'! 3 �...J <br />�,� <br />,a %: �_F�t <br />� S <br />,:-3 S'3';';f", <br />R"sz i. s.`ER <br />DYNIArs, .Tt PAPz,C) ROLL 100t.ef t Vr/ i.;A7_.',`( d.. '''a-.i4a.i d..:, <br />..7 <br />3 � <br />RAPID � OUL <br />.. <br />FLOOR <br />,,�, g <br />'"._r-> <br />E <br />v.- „..f ;° <br />f.-, <br />,., <br />;'" <br />'i.' <br />�' <br />.i . is <br />,:'� <br />} ..<,.-.. <br />e i. ., .,,,., <br />pp <br />., <br />3^ <br />'j <br />•'� '��'-r <br />n? 2> <br />7 .i <br />a�' �'� '... -' d� i l ! , 9 i5 "2: ,.,� <br />.� , ..,.,.� 7:. :-s.s..,. s,_ �... _ L..:O , e , ,.., , ,_. x..... d . r x ..s . ,'- ,..._, -., 0C)R-7 <br />,J. S, <br />'wT <br />.. <br />'" ,. <br />.. , <br />02 .,,., �.s...,„S. <br />_ <br />m. <br />,.� <br />A'� N` � <br />_d. <br />.'{' NI <br />o AI,, SY ; <br />i.9f3"ild.,'.. <br />".), ... <br />_- 71 ...,.!'i a, ; L , ; <br />3 r,;, 5 ':; }"'1 e fSET ""� itt'! - "x 'i <br />. s`...,�:'.,. <br />4.ny`g-t'`�. IJ�: <br />,... 1,:;{ <br />.ai. i�S a., <br />r,,_ <br />Ma, _ . 1 . � <br />F <br />-t 99� <br />di _ja..�3r <br />�dl�a� <br />q H <br />d�t�'i <br />.. <br />». <br />�y <br />8 <br />P ?, fl,.�?T <br />I <br />d-��Yj <br />_ <br />3�...i <br />Y JA � <br />�.>,.� <br />$ <br />� .r'S 1 �.s EXIST 3.,laa d. a. ,.- i33 � �..r a,�.'�,.� <br />., <br />_ <br />V <br />i, . J <br />io. <br />> JJ <br />.. <br />DOOR TYPES <br />PER DOOR SCHEDULE <br />LU <br />w <br />J <br />LO <br />ill <br />0 <br />0 <br />LL <br />L <br />0 <br />F (FLUSH) <br />R <br />PER DOOR SCHEDULE <br />IrIA <br />C <br />HIGH SPEED ROLL -UP DOOR <br />FRA,ME TYPES <br />I <br />U <br />I <br />ROOM FINISH SCHEDULE <br />F LOOR BASE. WALLS CEILING <br />ROOM ROOM NORTH EAST SOUTH WEST REMARKS <br /># NAME SUBSTRATE <br />MATERIAL FINISH FINISH MATERIAL FINISH MATERI ISH MATERIAL FINISH MATERIAL FINISH MATERIAL HEIGHT <br />101 TECH, ZONE EXIST. SOG R-2 B-2 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB UNDERSIDE OF <br />FLOOR JOISTS <br />102 R&D LAB EXIST. SOG R-1 B-1 GWB PT-1/CR-1 GWB PT- I/CR-1 GVVB PT-1/CR-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE <br />103 LOBBY EXIST. SOG P; 1 B-1 GWB PT-1/CR-1 GWB PT-1/CR-1 GWB PT-1/CP.-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE <br />104 R&D LAB EXIST. SOG R-1 B-1 GWB PT-I/CR-1 GWB PT-1/CR-1 GWB PT-1/CR-1 GWB PT-1/CR-1 ACP ±9'-6" AFF CLASS A /CLASS I FINISHES; INTEGRAL COVE BASE <br />105 TECH. ZONE EXIST. SOG R-2 B-2 GWB GWB GWB — GWB UNDERSIDE OF <br />PT-1 PT-1 PT-1 PT-1 GWB <br />FLOOR JOISTS <br />FINISH g ROOM FINISH GENERAL . <br />SPECIFICATIONS: <br />FLOOR FINISHES: WALL FINISHES® 1, ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS, SCHEDULES, AND 16. NOT USED, <br />FLOOR FINISH TO BE R-1, UON WALL FINISH TO BE PT-1, UON SPECIFICATIONS ARE NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS U.N.O. THE 1T PROVIDE TRANSITION STRIPS ,AT ALL FLOORING MATERIAL CHANGES, UNLESS <br />CONTRACTOR AND SUBCONTRACTORS SHALL SUBMIT PRODUCTS AND FINISHES NOTED OTHERWISE PER 6/A6.1. RESILIENT TRANSITION STRIPS TO MATCH BASE <br />R RESILIENT SHEET FLOORING p� EPDXY PAINT (GENERAL) AS INDICATED IN THE DOCUMENTS, COLOR U.N.O. WHEN PROVIDED, REFER TO PLAN FOR ADDITIONAL DETAIL <br />1 TO MATCH TAT LAB FLOORING SIKA HYGIENE HD 2. NOTIFY ARCHITECT OF SCHEDULED FINISHES THAT ARE UNAVAILABLE OR LOCATIONS, <br />DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A SUBSTITUTION 18. WHERE FLOOR FINISH THICKNESS REQUIRES, FLOAT FLOOR SLAB AT FINISH <br />EPDXY PAINT CR 8" WALL CRASH RAIL 36" AFF CAN BE SELECTED WITHOUT JEOPARDIZING THE CONSTRUCTION SCHEDULE, TRANSITION AREAS A MINIMUM OF 2'-0" OR TO A ACHIEVE A MAXIMUM SLOPE <br />ItACROV'YN, TBD S. REFER TO THE MATERIAL SCHEDULE FOR MANUFACTURER, PRODUCT/STYLE OF 1:20 (WHICHEVER IS GREATER) TO ACHIEVE A UNIFORM AND FLUSH <br />NAME, COLOR SPECIFICATION. TRANSITION BETWEEN FINAL FINISHED SURFACES. <br />4. INSTALL ALL FINISH MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S 19. ACCESS PANELS, VISIBLE COVES OR ENCASEMENTS, VISIBLE ELECTRICAL <br />WALLBASE: RECOMMENDED SPECIFICATIONS, SURFACE PREPARATION, ADHESIVES AND PANELS, ETC. TO SHALL BE PAINTED TO MATCH ADJACENT SURFACES, <br />BACKINGS: INCLUDING WALLCOVERINGS, COATINGS, FLOORING MATERIALS, 20. ALL INTERIOR WALL & CEILING FINISHES AND TRIM IN R&D LAB TO SHALL BE <br />VI/ALL BASE TO BE B-1, UON LAMINATES, ETC. AS PER NFPA 801.5.5: <br />B INTEGRAL COVE BASE, 6" MILLWOPI FINISHES. 5. PREPARE ALL SURFACES TO RECEIVE NEW FINISH SCHEDULED, TYPICAL FLOOR FINISH SHALL BE CLASS I IN ACCORDANCE WITH ASTM E648 (FLOOR <br />ET PLASTIC LAMINATE (BASE &/OR UPPER) THROUGHOUT. CONCRETE SLAB TO RECEIVE NEW SEAL WHERE SAW -CUT AND RADIANT PANEL CRITICAL RADIANT FLUX OF NOT LESS THAN 0,45 W/CM2) <br />TBD PATCHED. CEILING AND WALL FINISH SHALL BE CLASS A IN ACCORDANCE WITH ASTM <br />6, ALL WALLS (EXISTING AND NEW) TO BE PT'-1, UON. E84 (FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE <br />LAY ON PVC 7. VINYL BASE, B-1 THROUGHOUT, LION. BASE SHALL RUN CONTINUOUSLY, DEVELOPMENT INDEX OF NOT MORE THAN 450). <br />2 1 <br />PL PLASTIC LAMINATE (COUNTERTOP) 8, SEE REFLECTED CEILING PLANS FOR CEILING FINISHES, CEILING TILE AND GRID <br />RICHLITE, COLOR TBD SPECIFICATIONS, <br />2 90 ALL GWB SURFACES TO BE SMOOTH FINISH AND RECEEVE TWO COATS OF EPDXY <br />PAINT WITH EGGSHELL FINISH. <br />10, GWB SURFACES TO RECEIVE LEVEL 4 FINISH PRIOR TO PAINTING, UNO, REFER <br />ALTERNATE TRESPA TOPL83 TO FINISH LEGEND FOR EXCEPTIONS. <br />LABORATORY FURNITURE 11. ALL PAINT MATERIALS, PREPARATION AND WORKMANSHIP SHALL CONFORM TO <br />REQUIREMENTS OF THE LATEST EDITION OF THE ARCHITECTURAL PAINTING <br />SPECIFICATION MANUAL BY THE MASTER PAINTERS INSTITUTE, THE PAINTING <br />SUBCONTRACTOR SHALL ENSURE THAT ALL PAINTS COMPLY WITH THE <br />CEILING PRODU S- MUNICIPAL & STATE CODES AND BUILDING REGULATIONS FOR LOW VOC <br />ARMSTRONG CLEAN ROOM ACT EMISSIONS, <br />11 REFER TO DOOR SCHEDULE SHEET A6,1 FOR DOOR AND DOOR FRAME FINISHES, <br />13. WHERE INTERIOR DOOR AND DOOR FRAMES ARE TO BE PAINTED, COLOR TO <br />MAT CH 1 ADJACENT WALL SURFACES, <br />14, PLASTIC LAMINATE, PL-1 AT ALL EXPOSED SURFACES OF BASE AND UPPER <br />CABINETS, UON, PLASTIC LAMINATE PL-2 AT ALL COUNTERTOPS AND <br />BACKSPLASHES, 'UON. <br />15. REFER TO THIS SHEET FOR FINISH LEGEND & SCHEDULE, <br />eb Architecture, Inc. <br />1200 Fifth Ave. <br />SuIIte 1300 <br />Seattle, WA 98101 <br />Phone: (206) 408-8500 <br />WWW.NELSONWORLDWIDE.COMi <br />Owner/Client Representative, <br />Firm Name: TERRAPOWER <br />Attn: !AN VAN HOUTEN <br />360.739.2364 <br />E-mail: IVANHOUTEN@TERRAPOWER.com <br />Structural Engineer - <br />Firm Name: SHUTLER CONSULTING ENGINEERS <br />Attn: JGHN HEADLAND <br />425.450,4075 <br />3ONNH@SHUTLER.com <br />General Contractor° <br />Firm Name: PATTISON GENERAL CONTRACTOR <br />Attm ANDY FORTINO <br />T: 206.5710 3478 <br />E-mail:AN DYF@ PAiTISONGC,com <br />CLIENT: <br />ra Pow,, <br />, <br />3315 SEAWAY BLVD. <br />EVER , WA 98203 <br />Description: No: Date: <br />PERMI-f SET 05/26/2.021 <br />SEAL: <br />6 TEREED6 <br />ARUPFIfT OT I <br />M G, L.A <br />ATE AFF', �b TIN <br />CITY STAMP: <br />#20,0001110.001 Reviewed By: PA/PM <br />