My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE 2022 BEZOS ACADEMY Plans 2023-01-09
>
Address Records
>
SMITH AVE
>
3201
>
BEZOS ACADEMY
>
Plans
>
3201 SMITH AVE 2022 BEZOS ACADEMY Plans 2023-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 8:19:40 AM
Creation date
12/15/2022 2:55:50 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BEZOS ACADEMY
Permit
B2205-053
PW2205-024
Year
2022
Notes
TI: (3) CLASSROOM PRESCHOOL ON 1ST FLOOR OF TRANSIT BLDG ; SITE WORK FOR BEZOS ACADEMY
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A9.01 4 <br />DEMO RCP KEYNOTES <br />O REMOVE CEILING <br />2❑ REMOVE WINDOW COVERINGS, TYP. <br />REMOVE LIGHT FIXTURES CEILING HVAC TERMINALS AND EXIT <br />SIGNS., REFER TO ELECTRICAL AND MECHANICAL DRAWINGS <br />4❑ PARTIAL CEILING DEMOLITION FOR NEW PARTITION WALL <br />❑5 CEILING AND LIGHT FIXTURE TO REMAIN <br />OPENING IN SOFFIT TO ALLOW HOOD VENT DUCT WORK TO <br />GO THROUGH TO LOUVER <br />f <br />r \ 1 <br />,F, <br />n <br />qtj <br />1 /8" = 1'-011 <br />DEMO EXISTING CEILING TILE <br />GWB EXISTING GYP BOARD CEILING TO REMAIN <br />DEMO EXISTING LIGHT FIXTURES <br />C EXTENT NOT IN SCOPE OF INTERIOR RENOVATION. <br />REMOVAL (E) CEILINGS <br />1. DRAWINGS ARE DIAGRAMMATIC IN NATURE. INFORMATION IS PROVIDED <br />TO DESCRIBE GENERAL LOCATIONS, ASPECTS AND AREA OF EXISTING <br />BUILDING ELEMENTS. EXISTING CONDITIONS, DIMENSIONS, MATERIAL <br />AND QUANTITIES MUST BE VERIFIED BY THE CONTRACTOR. <br />2. DIMENSIONS HAVE BEEN TAKEN FROM THE ORIGINAL CONSTRUCTION <br />DRAWINGS, ARCHITECT HAS NOT PERFORMED ACCURACY CHECK NOR <br />VERIFIED RELIABILITY OF THE INFORMATION CONTAINED THEREIN. <br />DELIVERY OF DRAWINGS IS NOT A SUBSTITUTE FOR CONTRACTORS <br />DUTY TO INVESTIGATE AND ASCERTAIN EXISTING CONDITIONS. <br />3. IN AREA TO BE DEMOLISHED, REMOVE EXISTING CONSTRUCTION IN ITS <br />ENTIRETY FROM FLOOR TO UNDERSIDE OF STRUCTURE UNLESS <br />NOTED OTHERWISE. <br />4. DEMOLITION WORK SHOWS OPENINGS LARGER THAN 4SF ONLY. <br />CONTRACTOR SHALL COORDINATE WITH MECHANICAL, ELECTRICAL, <br />AND OTHER TRADE FOR SIZE AND LOCATION OF ALL OPENINGS <br />REQUIRED. <br />5. PATCH AND REPAIR ALL PENETRATIONS MADE DURING CONSTRUCTION <br />TO REINSTALL ANY RATED WALLS AND RATED SHEATHING AT ROOFING <br />TO EXTENT OF CURRENT CONDITIONS. <br />6. REFER TO ELECTRICAL DEMO SHEET FOR MORE INFORMATION ON <br />DEMOLITION WORK ON CEILINGS. <br />in <br />,5 <br />0` 2' 4- 81 <br />w <br />a <br />t <br />bassetti <br />architects <br />71 Columbia Street, Suite 500 <br />Seattle, Washington 98104 <br />T (206) 340 9500 <br />www.basseftiarch.com <br />MECHANICAL ENGINEER <br />FSi <br />1001 Alaskan Way, Suite 200 <br />Seattle WA 98104 <br />T (206) 385 6124 <br />ELECTRICAL ENGINEER <br />Hargis <br />1201 Third Avenue, Suite 600 <br />Seattle WA 98101 <br />T (206) 436 0457 <br />FOOD SERVICE <br />JLR Design Group <br />557 Roy St. Suite 175-A <br />Seattle, WA 98109 <br />T (206) 625 0070 <br />ONE INCH <br />AT FULL SIZE <br />This document has been digitally signed <br />5428 <br />iITECT <br />> <br />RCII <br />VDANIEL MILES <br />STATE OF WASHINGTON <br />05/12/2022 3:04:31 <br />PM <br />REVISIONS DATE <br />Owner <br />BEZOS ACADEMY <br />EVERETT TRANSIT <br />STATION <br />3291 SMITH AVE. <br />EVERETT WA 98201 <br />JOB NO: 2018 <br />ISSUE DATE: 05/12/22 <br />Jurisdiction Stamp Area <br />r Pf <br />
The URL can be used to link to this page
Your browser does not support the video tag.