My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE 2022 BEZOS ACADEMY Plans 2023-01-09
>
Address Records
>
SMITH AVE
>
3201
>
BEZOS ACADEMY
>
Plans
>
3201 SMITH AVE 2022 BEZOS ACADEMY Plans 2023-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 8:19:40 AM
Creation date
12/15/2022 2:55:50 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BEZOS ACADEMY
Permit
B2205-053
PW2205-024
Year
2022
Notes
TI: (3) CLASSROOM PRESCHOOL ON 1ST FLOOR OF TRANSIT BLDG ; SITE WORK FOR BEZOS ACADEMY
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LA9-01 4 <br />i <br />DEMO RCP KEYNOTES <br />DEMO RCP LEGEND <br />GENERAL RCP DEMO NOTES <br />1 <br />REMOVE CEILING <br />ai <br />DEMO EXISTING CEILING TILE <br />1. <br />DRAWINGS ARE DIAGRAMMATIC IN NATURE. INFORMATION IS PROVIDED <br />TO DESCRIBE GENERAL LOCATIONS, ASPECTS AND AREA OF EXISTING <br />BUILDING ELEMENTS. EXISTING CONDITIONS, DIMENSIONS, MATERIAL <br />�2 <br />REMOVE WINDOW COVERINGS, TYP. <br />0 <br />GWB EXISTING GYP BOARD CEILING TO REMAIN <br />AND QUANTITIES MUST BE VERIFIED BY THE CONTRACTOR. <br />2. <br />DIMENSIONS HAVE BEEN TAKEN FROM THE ORIGINAL CONSTRUCTION <br />DRAWINGS, ARCHITECT HAS NOT PERFORMED ACCURACY CHECK NOR <br />3 <br />REMOVE LIGHT FIXTURES CEILING HVAC TERMINALS AND EXIT <br />DEMO EXISTING LIGHT FIXTURES <br />VERIFIED RELIABILITY OF THE INFORMATION CONTAINED THEREIN. <br />SIGNS., REFER TO ELECTRICAL AND MECHANICAL DRAWINGS <br />DELIVERY OF DRAWINGS IS NOT A SUBSTITUTE FOR CONTRACTORS <br />DUTY TO INVESTIGATE AND ASCERTAIN EXISTING CONDITIONS. <br />4 <br />PARTIAL CEILING DEMOLITION FOR NEW PARTITION WALL <br />'— <br />EXTENT NOT IN SCOPE OF INTERIOR RENOVATION. <br />3. <br />IN AREA TO BE DEMOLISHED, REMOVE EXISTING CONSTRUCTION IN ITS <br />ENTIRETY FROM FLOOR TO UNDERSIDE OF STRUCTURE UNLESS <br />NOTED OTHERWISE. <br />5 <br />CEILING AND LIGHT FIXTURE TO REMAIN <br />REMOVAL (E) CEILINGS <br />4. <br />DEMOLITION WORK SHOWS OPENINGS LARGER THAN 4SF ONLY. <br />CONTRACTOR SHALL COORDINATE WITH MECHANICAL, ELECTRICAL, <br />AND OTHER TRADE FOR SIZE AND LOCATION OF ALL OPENINGS <br />6 <br />OPENING IN SOFFIT TO ALLOW HOOD VENT DUCT WORK TO <br />5. <br />REQUIRED. <br />PATCH AND REPAIR ALL PENETRATIONS MADE DURING CONSTRUCTION <br />GO THROUGH TO LOUVER <br />TO REINSTALL ANY RATED WALLS AND RATED SHEATHING AT ROOFING <br />TO EXTENT OF CURRENT CONDITIONS. <br />6. <br />REFER TO ELECTRICAL DEMO SHEET FOR MORE INFORMATION ON <br />DEMOLITION WORK ON CEILINGS. <br />-7 <br />w,... <br />i <br />1 /8" = 1 Owl <br />1 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.