My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11031 19TH AVE SE 2020 Plans 2023-01-05
>
Address Records
>
19TH AVE SE
>
11031
>
Plans
>
11031 19TH AVE SE 2020 Plans 2023-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 7:51:54 AM
Creation date
12/15/2022 4:32:46 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11031
Permit
B2004-031
Year
2020
Notes
INSTALL (2) ELECTRICAL VEHICLE CHARGING STATIONS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EROSION CONTROL NOTEA <br />1. STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE TREATED SO THE SEDIMENT <br />RUN—OFF WILL NOT CONTAMINATE SURROUNDING AREAS OR ENTER NEARBY STREAMS. <br />STOCK PILE LOCATIONS SHALL DE COORDINATED WITH THE ENGINEER PRIOR TO <br />GRADING ACTIVITIES. EROSION & SEDIMENT CONTROL PRACTICE SMALL BE INSTALLED <br />PRIOR TO STOCKPILE OPERATIONS. <br />. CONSTRUCT SILT BARRIERS BEFORE BEGINNING GRADING OPERATIONS. <br />3. MULCH AND SEED ALL DISTURBED AREAS AS SOON AS POSSIBLE AFTER FINAL <br />GRADING IS COMPLETED (WITHIN 15 DAYS OF ACHIEVED FINAL GRADES) UNLESS <br />OTHERWISE INDICATED. CONTRACTOR SMALL TAKE WHATEVER MEANS NECESSARY TO <br />ESTABLISH PERMANENT SOIL STABILIZATION. STEEP SLOPES (GREATER THAN 3: 1) <br />SHALL BE STABILIZED WITHIN e DAYS OF FINAL GRADING, <br />4. PROVIDE TEMPORARY CONSTRUCTION ACCESS(ES) AT THE POINT(S) WHERE <br />CONSTRUCTION VEHICLES EXIT THE CONSTRUCTION AREA, MAINTAIN PUBLIC <br />ROADWAYS FREE OF TRACKED MUD AND DIRT. <br />5m DO NOT DISTURB VEGETATION OR REMOVE TREES EXCEPT WHEN NECESSARY FOR <br />GRADING PURPOSES. <br />ELECTRICAL TES: <br />1. ALL ELECTRICAL <br />l AND . ACTIVITIES PERFORMED ON —SITE SH <br />-- rye DONE <br />IN ACCORDANCE <br />rr : WITH NATIONALELECTRIC I1 _ (NEC) STANDARDS BEING ENFORCED <br />BY ALL APPLICABLE JURISDICTIONAL REQUIREMENTS AT THE TIME OF <br />CONSTRUCTION. <br />2. UTILITY EQUIPMENT INSTALLATIONS AND PREP . COORDINATED <br />O <br />THE APPROPRIATE UTILITY ENGINEER AT TIME OF <br />NSTRUCTION MEETING TO <br />ENSURE ACCURACY OF INSTALLATIONS * <br />3. CONDUIT <br />DETERMINED ON SITE BASED FIELD CONDITIONS <br />i <br />PLEASANTON, 94588 <br />J <br />®Associates, <br />4 <br />05/20/2020 <br />CD100s-CITY COIUMEN f`S <br />SAL <br />3 <br />02/06/2020 <br />CD100s <br />GCC <br />2 <br />10/10/2019 <br />CD100s <br />GCC <br />1 <br />08/1912019 <br />CD90s <br />SDD <br />REV <br />DATE <br />DESCRIPTION <br />BY <br />ISSUE DATE <br />05/2112020 <br />ISSUED FOR <br />REVIEW <br />r <br />`G/s�ell <br />°6NA U <br />EXPIRES: <br />IT IS A VIOLATION OF LAW FOR ANY PERSON, <br />UNLESS THEY ARE ACTING UNDER THE DIRECTION <br />OF A LICENSED PROFESSIONAL <br />ENGINEER, TO ALTER THIS DOCUMENT. <br />SHEET TITLE <br />r <br />,; Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.