|
GYP-1, TYP NOTE. SIM W/ (E) SIDING. NOTE: SIM @ VARIOUS (N)
<br />(E) MATL COMBINATIONS,
<br />SPa1, T�/l P;_ ®1 14f- ACl A n IA�
<br />6"
<br />-
<br />PLY FURRING (I
<br />I
<br />GYP-1 OR (E) GYP I I I TRIM-2, PNT-6; HOLD BACK 41
<br />0
<br />4,®
<br />PLY-2 OR (E) PLY CONT INSECT I III II TO ALLOW DRAINAGE
<br />SCREEN @ BASE OF I BASE OF SIDING, INSTALL
<br />A
<br />SPA TO SID-1 3/3" PLY FURRING I L — _ — — — — ) BENT PA RADIUS IN
<br />LIEU OF TRIM®2
<br />HEAD W/ (E) VINYL (E) VINYL RE/RE INT CORNER
<br />(E) GYP TO ACCOM WORK
<br />SAM®1
<br />A SADDLE BRICK 6
<br />GYP-1 OR (E) GYP
<br />_ - PLY-2 OR (E) PLY GYP-1, VENT-1; BLKG A
<br />TYP (E) VINYL SOFFIT TO PNT®6 NEEDED,
<br />TYP
<br />REMAIN INSTALLED (E) WRB, PEEL
<br />TOP FLOOR BACK TO ,
<br />I
<br />I
<br />2 LAYERS OF WRB; SET IN ACCOM WORK
<br />CONT BEAD OF SLNT-5 @ HEAD 2 LAYERS — ' FILLET SLNTm2 —SP®1, TYP;
<br />SID-1 O/ 3/3" PLY FURRING
<br />OF WRB AS --------____ PNT®6 1 112,9
<br />41' 411
<br />611
<br />2,1 EXTEND 1"
<br />/12-
<br />EDGE OF BEYOND SID
<br />(E) CONC
<br />x
<br />s
<br />NEEDED TRIM®3, RIP TO FIT, PNT®6 v/p 3. HvKl/_ 1-LAl'*4(3r_Z5 Ul- lKANZjlllUNlVlLlALZj,5HALL
<br />GYP-1 OR (E) GYP ' ACT AS CLEATS. (E) BRICK, RE/RE
<br />PLY-2 OR (E) PLY SAM=1 SLNT�2 Pl �� i AS REQ'D TO
<br />SOFFIT TO REMAIN HEAD TRIM-2; PNT®6 4. REF 12/A5.1 FOR CONCEPTUAL DESIGN @ FLAT ACCOM WORK
<br />C W/O SIDING SET IN SLNT-3 10
<br />® EDGE OF � SEAM LAPPED JOINTS; S, USE SLNT=3, UN®.
<br />NOTES, NOTE: REF B/A5.2 FOR SID-1 TO TRIM-2. E) CNC HEMMED AGAINST (E) MT 1i
<br />( 5. SLOPE ALL HORIZ FLANGES TO DRAIN, TYP. BRICK; REF A5.2
<br />EXPOSED EDGES 3E/A5.2
<br />1. REFER TO SHEETS A2.1 e A3.4 FOR TYP LOCATIONS. NOTE. DETAIL NOT TAGGED; USE 6D OR HEMMED EXPOSED
<br />6E/A5.2 @ SOFFITS; CONTRACTOR TO VIF. EDGES WHERE 1/211 END DAM, EXTEND 6. SET ALL MTL FLASHINGS IN SLNT®3 CONC 1 BR SLNT-3;
<br />2. VINYL SOFFIT TO REMAIN INSTALLED TOP FLOOR ONLY. , TYP.
<br />@ WRB OCCURS, TYP EXTEND TO TOP 9A
<br />GYPm1, VENT-1 ; BLKG AS OF MTL #10 END A5.1
<br />3. DETAIL 6B/A5.2 SHOWS TYPICAL SOFFIT TRANSITION @ TOP GYP-1 OR (E) I TYP PNTa6 NEEDED, NOTE: REF 10/A5.2 FOR ITEM ALL EXPOSED EDGES,
<br />GYP II TYP INSTALLATION ONS, DAM W/ WEEP NOTE: CONC
<br />FLOOR OF STAIR TOWER; VARYING COMBINATIONS OF SID-1, BASE OF ID®1
<br />SP=1, TRIM-2, (E) SIDING (E) SOFFITS OCCUR, REFER TO PLY-2 OR (E) I & (E) SIDING, SID-1, WRB MTL #2 NOT SHOWN FOUNDATION,
<br />nP Au _q AA r- r) P. PiAr, 9 POP \/APlr)l I-q KAATPPIAI TPAKl_gl ir)ni.q- o' — — —' SADDLE an GRADE END SADDLE FOR CLARITY. SID 1 ®/ 3/3°' BASE METAL
<br />311 n 1 1-011
<br />SID_FCP_TR_SE_001
<br />2 LAYERS OF WRB
<br />SID®1 O/ 3/3" PLY
<br />FURRING, TYP
<br />GYP-1 OR (E)
<br />CONT INSECT SCREEN
<br />GYP, TYP
<br />' II I BASE OF 3/3" PLY
<br />PLY-2 OR (E)
<br />I I FURRING
<br />PLY, TYP
<br />II ' ii 1 W/ END DAMS
<br />WRB ISOLATION
<br />SET IN SLNT®2
<br />II
<br />SHEET
<br />- /RE WALL ACCESSORY
<br />FFA TYP
<br />BR & SLNT®2
<br />NOTE: USE DETAIL
<br />BLKG®1 OR BLKG-2 TBD
<br />FOR ALL TYP
<br />`�° ON SITE FOR SPECIFIC
<br />PENETRATIONS
<br />II USE, TYP; SKIM TO
<br />UNLESS DIRECTED
<br />y ACCOM DEPTH OF SID-1
<br />OTHERWISE BY
<br />FILLET SLNT-2 CONT
<br />ARCH.@
<br />II
<br />JAMBS & SILL
<br />REV®5 @ JAMBS SILL
<br />NOTES REF 16B/A5.2
<br />FOR TYP AXON.
<br />2 LAYERS OF WRB; LAP
<br />WRB UNDER FF-4
<br />SECTION
<br />SCALE VARIES
<br />NOTE; REF 16A/A5.2
<br />FOR TYP SECTION.
<br />FF-4, PROPERLY
<br />LAPPED O/ WRB BELOW
<br />UNDER WRB ABOVE
<br />1 2 LAYERS OF WRB
<br />WEATHER -LAPPED
<br />UNDER BASE OF FF64
<br />SID_FCP_PE_SE_001
<br />NO SCALE
<br />(E) WRB, LEAVE LONG TO TIE INTO (N)
<br />(E) BRICK, RE/RE AS RE'D TO ACCOM WORK, TYP
<br />III NOTE. REF 3E/A5.2
<br />FOR AXON OF MTL #10
<br />II ABOVE.
<br />SAMa1
<br />`I
<br />BR & SLNT-3, EXTENT TO TOP OF BRICK
<br />CAP W/ WEEP @ BASE OF SID-1
<br />I
<br />REV-5
<br />2 LAYERS OF WRB
<br />I SID-1 W/ 3/3" PLY FURRING STRIPS
<br />311 1 1-011
<br />A5.2 MISCELLANEOUS DETAILS
<br />NO SCALE
<br />SID_FLA_BA AX_002
<br />I
<br />REV-2; REF 2/A5.1
<br />it i I'll Fr.;
<br />k
<br />I S
<br />I �y IN
<br />INI#t
<br />SID_GEN_MU_PL_001
<br />I
<br />I
<br />REV-3,
<br />REF 3/A5.1
<br />I
<br />BUMP -OUT
<br />SELECT GROUND
<br />FLOOR COLUMNS,
<br />COORD W/ ARCH
<br />DURING
<br />CONSTRUCTION
<br />W/SIDING PLY FURRING & REVEALS
<br />NOT SHOWN
<br />FOR CLARITY.
<br />1®1 /2" 1'=0"
<br />NOTES;
<br />A5.2 MISCELLANEOUS DETAILS
<br />SID-1 O/ 3/3" _REV95
<br />PLY FURRING
<br />9016 REGISTERED
<br />/
<br />�
<br />ARCHITECT
<br />LISA CL ARK MOE
<br />STATE OF WASHINGTON
<br />SLNT-2 REVISIONS:
<br />BUTT JOINT s 10-16-2020 PERMIT SET
<br />II (N) O (E)
<br />FRAMING AS BLDGDEPT:
<br />II REQ'D PER
<br />STRUCT
<br />I)
<br />i
<br />II TRIM-2, PNT-6
<br />_ SAM-1 @
<br />CORNERS, TYP --
<br />DATE:
<br />PLY-2 OR 6-2020
<br />SLNT-2 -1
<br />(E) PLY BUTT JOINT
<br />SHEET TITLE:
<br />2 LAYERS OF (E) VINYL SIDING RE/RETYPICAL SIDING
<br />WRB, TIE INTO (E) TO ACCOM WORK @ INT
<br />WRB AS REQ'D OF STAIR TOWER & BASE DETAILS
<br />NOTE: SIM @ BRICK END @ GROUND FLOOR
<br />BELOW SID-1; INSTALL MTL #17, SET IN SLNT-3.
<br />BUILDING TYPE:
<br />C @JAMB W/ (E} SIDING
<br />SHEET #:
<br />
|