My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 MERRILL CREEK PKY BLDG 7 2020 Plans 2022-12-16
>
Address Records
>
MERRILL CREEK PKY
>
1707
>
Plans
>
1707 MERRILL CREEK PKY BLDG 7 2020 Plans 2022-12-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 10:25:20 AM
Creation date
12/16/2022 10:23:04 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1707
Unit
BLDG 7
Permit
B2011-010
Year
2020
Notes
REFRAMING SELECT STAIR TOWERS, LANDINGS, STRIP AND RECLAD OF
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,ABBREVIATION <br />COLOR <br />MATERIAL DESCRIPTION <br />PNT-1 <br />STAIR TOWER <br />ALL SURFACES FROM (E) SIDING UP TO STAIR TOWER COLUMNS, <br />BODYCOLOR <br />INCLUDING BUT NOT LIMITED TO SID-1, REVEALS, <br />TRIMr BLOCKING STAIR TOWER <br />WALLSSTAIR <br />.R <br />LL SURFACESOF <br />ACCENTCOLOR <br />NCLUDING BUT NOT LIMITED TO SID-1, REVEALS, FLASHINGS, WD <br />RIM BLOCKING @ STAIR TOWER <br />TO MATCH <br />TOUCH UP PAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />MTL-3 <br />FLASHINGSCOLOR <br />METAL <br />PNT-4 <br />COLOR TO MATCH <br />'TOUCH UP PAINT FOR ALL EXPOSED GALVANIZED & PRE -PRIMED <br />- _ <br />µ_ <br />METAL ADJ TO <br />r- 1 'y <br />IL <br />I• __ - - <br />METAL2. REF a NG SCHEDULE ON 1/A0.1 FOR METAL FLASHING -FINISHES. <br />COLORS.REF SECTION 07 60 00 - FLASHING & SHEET METAL FOR SPECIFIED PRE -FINISHED METAL <br />3. MISCELLANEOUS PRE -PRIMED & GALVANIZED METAL FLASHINGS ADJACENT TO SIDINJ <br />SHALL BE 1FLASHING <br />4, <br />R <br />*AINT ALL EXPOSED SEALANTS TO MATCH ADJACENT MATERIALS, UNO IN SEALANT <br />LOA <br />SEALANT <br />TYPE COLOR <br />APPLICATION <br />LOCATION <br />PRIMER <br />PAINTED <br />VISIBLE <br />BACKER ROD & <br />INTEGRAL \All FF-1 <br />SLNT-1 N/A <br />NONE <br />NO <br />NO <br />SEALANT JOINT <br />SYSTEM @ ALL DOORS <br />PACKER ROD & <br />MISC BACKER ROD & <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />ALL WD TRIM SET IN <br />SLNT-2 TBD <br />SET IN SEALANT <br />SEALANT @ BUTT <br />VERIFY <br />NO <br />NO <br />JOINTS <br />FILLET ALL EXPOSED FILLET <br />SEALANT JOINT <br />SEALANT JOINTS <br />VERIFY <br />YES <br />YES <br />METAL TO <br />iVIISC METAL TO METAL <br />METAL <br />LAP SEAMS <br />NONE <br />NO <br />NO <br />ALL METAL FLASHINGS <br />SET IN SEALANT <br />SET IN SEALANT O/ <br />VERIFY <br />NO <br />NO <br />METAL ACCESSORIES <br />ALL FLAT LAPPED <br />SLNT. , <br />METAL TO <br />SEAMED JOINTS @ <br />NONE <br />NO <br />NO <br />TBD <br />METAL COLIC <br />CONS <br />PRIMER P <br />REQUIRED <br />C � C �SE�IN <br />MTL-4 SET IN SEALANT <br />CONCRETE; <br />NO <br />NO <br />CONS OR BRICK <br />SEALANT <br />MASK OFF <br />PRIOR TO <br />PRINTING <br />ALL FILLET SEALANT <br />FILLET <br />JOINTS AS AN <br />TBD BY ARCH <br />SEALANT JOINT <br />INTEGRAL PART OF <br />VERIFY <br />YES <br />YES <br />MEM-1 <br />ALL METAL TO METAL <br />LAP SEAMS <br />TBD BYMFR <br />METAL TO <br />ASSOCIATED AS <br />VERIFY <br />NO <br />NO <br />METAL <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />SLNT-4 <br />METAL & FLEXIBLE <br />FLASHINGS SET IN <br />TBD BY MFR <br />SET IN SEALANT <br />SEALANT WHERE <br />VERIFY <br />NO <br />NO <br />INSTALLED AS <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />MEM-1 TERMINATION <br />SEALANT JOINT; W/ & <br />TBD BYARCH <br />BACKER ROD & <br />W/O SAND <br />VERIFY <br />NO <br />YES <br />SEALANT JOINT <br />BROADCAST PER <br />DETAILS <br />SLNT-5 N/A <br />SET IN SEALANT <br />INTEGRAL \All \AiRB & <br />VERIFY <br />NO <br />NO <br />SAM-1 INSTALLATIONS <br />111111111 [did 1". <br />_ - r <br />6. PAINT SEALANTS IN ACCORDANCE W/ SEALANT SCHEDULE; PAINT EXPOSED SLNT-2 @ <br />ALL LOCATIONS WHEN INSTALLED AS A PART OF, OR ADJACENT TO, MATERIALS <br />SCHEDULED TO BE PAINTED. <br />OF } _ COLORS F. SELECTED BY ARCH; SELECTED COLORS <br />ARE <br />DEPENDENT ON ADJACENTMATERIAL <br />zoo 9-4.111M <br />TYPE <br />ABBREVIATION <br />DESCRIPTION <br />COMMENTS <br />CONCRETE <br />CONCA <br />CAST -IN -PLACE CONCRETE <br />COLUMN PLINTHS & SOG REPAIRS <br />MEMBRANE <br />-1 <br />POLYDECK 150SC <br />LIQUID APPLIED COATING @ <br />LANDINGS & WALKWAYS <br />SEALANTS <br />SLNT-1 <br />PROSOCO R-GUARD AIRDAM <br />USE IN CONJUNCTION W/ FF-1 <br />SYSTEM <br />SL T-2 <br />BASF MASTERSEAL NP150 <br />MISC EXPOSED SEALANT JOINTS <br />THATARE PAINTABLE <br />SL T-3 <br />DOWSIL 791 OR 795 <br />REF SEALANT SCHEDULE <br />SL T-4 <br />BASF MASTERSEAL NP-1 <br />SEALANT ASSOCIATED W/ -1 @ <br />INTEGRATION OF METAL & FLEXIBLE <br />FLASHINGS <br />SLNT-5 <br />FORTIFIBER MOISTOP <br />SEALANT ASSOCIATED W/WRB & <br />SAMA <br />FLEXIBLE <br />FF-1 <br />LIQUI® APPLIED FLEXIBLE <br />MAIN FLASHING @ MAN DOORS <br />FLASHING <br />FLASHING - RGUARD <br />FASTFLASH <br />F-2 <br />FORTIFIBER MOISTOP PF <br />FLEXIBLE COUNTER FLASHING (IF <br />NEEDED) <br />FF-3 <br />LIQUID APPLIED FIBER <br />SUPPLEMENTAL FLEXIBLE <br />REINFORCED FLEXIBLE <br />FLASHING W/ FF-1 <br />FLASHING - RGUARD JOINT & <br />SEAM FILLER <br />FF64 <br />QUICK FLASH FLASHING <br />@ ALL MISC PENETRATIONS (OR FF- <br />PANELS <br />1 ASSEMBLYOPTION) <br />FF-5 <br />BAMILEX GLASS MESH TAPE <br />-1 DECK TO WALL <br />REINFORCEMENT 6" TO 4" ROLL <br />FF-6 <br />TBD BY -1 MFR <br />ME -1 FLAT SEAM <br />REINFORCEMENT; 4" ROLL <br />SA -1 <br />FORTIFIBER FORTIFLASH <br />@ BLDG CORNERS , <br />SIDING & <br />PLY-1 <br />1 1/8" T&G AC PLYWOOD <br />@ ALL LANDINGS & WALKWAYS <br />ACCESSORIES <br />PLY-2 <br />MATCH (E) <br />@ WALLS WHERE (E) PLY IS RE/REP <br />SI A <br />HARDIEPANEL VERT SIDING <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />WRB <br />FORTIFIBER SUPER JUMBO <br />ALL LOCATIONS WHERE SIDING IS <br />TEX 60 MINUTE <br />RE/REP <br />YPA <br />5/8" DENSGLASS GOLD <br />STAIR TOWER SOFFIT & SHEATHING <br />RE/REP LOCATIONS <br />SPA <br />T1 11 SOFFIT PANELS <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />VENT-1 <br />LINEAR SOFFIT VENT STRIP <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />TRIM-1 <br />2 X 2 <br />VERT TRIM @ INTCORNERS <br />TRIM-2 <br />5/4 X 12 <br />TRIM @ COLUMNS & WALL ENDS <br />TRIM-3 <br />1 X 2 <br />SOFFITTRIM <br />LIB -1 <br />5/4 X 6 <br />RAILING MOUNT LOCATIONS & MISC <br />PENETRATIONS <br />LIB -2 <br />5/4 X 12 <br />STANDPIPE PENETRATIONS <br />EVA <br />FCP-VERTICAL <br />VERT REVEAL <br />REV-2 <br />FCP-OUTSIDE CNR <br />OUTSIDE CORNER REVEAL <br />REV-3 <br />FCP-INSIDE CNR <br />INSIDE CORNER REVEAL <br />REV-4 <br />FCP-HOZ TRIM <br />HORN REVEAL <br />REV® <br />FCP-J CHANNEL <br />VERT/HORN J-CHANNEL <br />METALS <br />II <br />PRE -PRIMED <br />REF METAL FLASHING SCHEDULE <br />TL-2 <br />GALVANIZED <br />REF METAL FLASHING SCHEDULE <br />TL-3 <br />SHASTA WHITE <br />MISC HEAD FLSHINGS <br />TL=4 <br />PARCHMENT <br />BASE METAL FLASHING @ CONIC <br />MTL-5 <br />TBD <br />BASE METAL FLASHING @ BRICK <br />DOORS <br />DOOR-1 <br />STEELS FT L-20 SERIES <br />REPLACEMENT DOOR @ STAIR <br />TOWER TO HALLWAY <br />LIGHTS <br />-- <br />LIGHT-1 <br />SEA GULL LIGHTING, 4325-68 <br />SOFFIT MOUNTED LIGHT <br />IN <br />P T-1 <br />TBD <br />STAIR TOWER BODY COLOR; REF <br />PAINT SCHEDULE <br />P T-2 <br />TBD <br />STAIR TOWER ACCENT COLOR; REF <br />PAINT SCHEDULE <br />P T-3 <br />COLOR TO MATCH TL-3 <br />REF PAINT SCHEDULE <br />PNT4 <br />COLOR TO MATCH MTL4 <br />REF PAINT SCHEDULE <br />P T <br />COLOR TO MATCH MTL-5 <br />REF PAINT SCHEDULE <br />PNT-6 <br />TBD <br />STAIR TOWER SOFFIT & TRIM <br />_ <br />COLOR; REF PAINT SCHEDULE <br />P T-7 <br />TBD; COLOR TO MATCH <br />REF PAINT SCHEDULE <br />RAILINGS <br />PNT® E <br />GENERAL FOR "PAINT TO <br />AS NEEDED <br />MATCH (E)" <br />1. MATERIAL SCHEDULE IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS <br />RESPONSIBLE FOR IDENTIFYING ALL MATERIALS REPAIR. REFER <br />SPECIFICATIONSl R`: 1 L INSTALLATION INFORMATIONrf SPECIFIC <br />2. ADDITIONAL PRODUCTS & MATERIALS MAY BE INCLUDED IN SPECIFICATION SECTIONS & <br />NOT NOTED HERE. <br />5 <br />IF <br />MOT <br />C� '311 } <br />i <br />S <br />zg 5 5 `.,., <br />Avenue, <br />Seatt el WA 98104 <br />9016 REGISTERED <br />ARCHITECT <br />� C .' <br />LISA CLARK MOE <br />STATE OF WASHINGTON <br />The documents created by the <br />Architect and its Consultants <br />for this project are instruments <br />of the Architect's service. The <br />Architect retains all common <br />law, statutory and other <br />reserved rights, including the <br />copyright. The Architect's <br />documents shall not be used <br />by anyone on any other <br />project, except with the <br />Architect's written permission. <br />PROJECT #_ <br />DRAWN BY: <br />CHECKED BY: <br />REVISIONS: <br />BLDG DEPT: <br />DATE: <br />SHEET TITLE <br />i <br />!` y <br />fllll� � <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.