Laserfiche WebLink
WIN <br />too <br />SOFF__IT COLOR <br />0=2 'how <br />`F <br />COLOR <br />r ar1 110 U ILI 1. <br />RAILINGS <br />.COLOR <br />TO MATCH <br />,R <br />- -- -- - — <br />_ <br />2. REF METALFLASHING SCHEDULE ON I/A0.1 FOR METAL FLASHING COLORS & FINISHES. <br />REF SECTION 07 60 00 - FLASHING & SHEET METAL FOR SPECIFIED PRE -FINISHED METAL <br />MISCELLANEOUS <br />3. PRE -PRIMED & GALVANIZED METAL FLASHINGSD To I <br />SHALL BE PAINTED TO MATCH SIDING COLOR, UNO & IN METAL FLASHING SCHEDULE <br />NOTES. <br />4. PAINT ALL EXPOSED SEALANTS TO MATCH ADJACENT MATERIALS, Uhl® IN SEALANT <br />SCHEDULE, <br />PAINT SCHEDULE & NOTES <br />SEALANT <br />TYRE COLOR <br />APPLICATION <br />LOCATION <br />PRIMER <br />PAINTED <br />VISIBLE <br />SLNT_1 NIA <br />BACKER ROD & <br />INTEGRAL W/ FF-1 <br />HONE <br />NO <br />NO <br />SEALANT JOINT <br />SYSTEM c( r,_, ALL DOORS <br />BACKER ROD & <br />IVIISC BACKER ROD & <br />VERIFY <br />YES <br />YES <br />SEALANT JOINT <br />SEALANT JOINTS <br />ALL WD TRIM SET IN <br />SLNT-2 TBD <br />SET IN SEALANT <br />SEALANT @ BUTT <br />VERIFY <br />NO <br />NO <br />JOINTS <br />FILLET <br />ALL EXPOSED FILLET <br />VERIFY <br />YES <br />YES <br />SEALANT JOINT <br />SEALANT JOINTS <br />METAL TO <br />MISC METAL TO METAL <br />NONE <br />NO <br />NO <br />METAL <br />LAP SEAMS <br />ALL METAL FLASHINGS <br />SET IN SEALANT <br />SET IN SEALANT O/ <br />VERIFY <br />NO <br />NO <br />METAL ACCESSORIES <br />ALL FLAT LAPPED <br />SL NT-3 <br />METAL TO <br />SEAMED JOINTS c <br />NONE <br />NO <br />NO <br />TBD <br />METAL ( CONC <br />CONC <br />PRIMER P <br />REQUIRED <br />METAL TO <br />ON <br />CONC - SET IN <br />MTL-4 SET IN SEALANT <br />CONCRETE; <br />NO <br />NO <br />CONC OR BRICK <br />SEALANT <br />MASK OFF <br />PRIOR TO <br />PRIMING <br />ALL FILLET SEALANT <br />TBD BYARCH <br />FILLET <br />JOINTS AS AN <br />VERIFY <br />YES <br />YES <br />SEALANT JOINT <br />INTEGRAL PART OF <br />MEM-1 <br />ALL METAL TO METAL <br />LAP SEAiV1S <br />TBD BY MFR <br />METAL TO <br />ASSOCIATED AS <br />VERIFY <br />NO <br />NO <br />METAL <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />METAL & FLEXIBLE <br />SLNT-4 <br />FLASHINGS SET IN <br />TBD BY �11FR <br />SET IN SEAL ANT <br />SEALANT WHERE <br />VERIFY <br />NO <br />NO <br />INSTALLED AS <br />INTEGRAL PART OF <br />MEM-1 SYSTEM <br />MEM-1 TERMINATION <br />SEALANT JOINT; WI & <br />TBD BYARCH <br />BACKER ROD & <br />W/O SAND <br />VERIFY <br />NO <br />YES <br />SEALANT JOINT <br />BROADCAST PER <br />DETAILS <br />SLNT-5 NIA <br />SET IN SEALANT <br />INTEGRAL l\// WRB & <br />VERIFY <br />NO <br />NO <br />SAM-1 INSTALLATIONS <br />1. SEALANT <br />SCHEDULE IS A GUIDELINE FOR COMMON SEALANTINSTALLATIONS <br />RESPECT TO FINISHED MATERIALS, COLORS & PRODUCTS. NOT ALL SEALANT <br />INSTALLATIONS RFOR ON THE SCHEDULE. <br />,I.F1111■ <br />■ ; . _ a■ �. R '�. Se - - r <br />PAINT6. l ACCORDANCE -' PAINT EXPOSED <br />ALL LOCATIONS WHEN INSTALLED AS X PART OF, OR ADJACENT TO, MATERIALS <br />SCHEDULED TO BE PAINTED. <br />7. A VARIETY OF SLNT-2 & SLNT-3 COLORS MAY BE SELECTED BY ARCH; SELECTED COLOWE-3 <br />ARE DEPENDENT ON ADJACENT MATERIAL COLORS. <br />TYPE <br />ABBREVIATION <br />DESCRIPTION <br />COMMENTS <br />CONCRETE <br />CO ®1 <br />CAST -IN -PLACE CONCRETE <br />COLUMN PLINTHS & SOG REPAIRS <br />MEMBRANE <br />ME-1 <br />POLYDECK 150SC <br />LIQUID APPLIED COATING <br />LANDINGS & Vv1ALKilVAYS <br />SEALANTS <br />SLNT-1 <br />PROSOCO R-GUARD AIRDAM <br />USE IN CONJUNCTION W/ FF-1 <br />SYSTEM <br />L T-2 <br />BASF MASTERSEAL NP150 <br />MISC EXPOSED SEALANT JOINTS <br />THATARE PAINTABLE <br />L T-3 <br />DOWSIL 791 OR 795 <br />REF SEALANT SCHEDULE <br />SL T-4, <br />BASF MASTERSEAL NP-1 <br />SEALANT ASSOCIATED W/ ME-1 <br />INTEGRATION OF METAL &FLEXIBLE <br />FLASHINGS <br />L T-5 <br />FORTIFIBER MOISTOP <br />SEALANT ASSOCIATED W1WR13 & <br />SA-1 <br />FLEXIBLE <br />FLASHING <br />FF®1 <br />LIQUID APPLIED FLEXIBLE <br />FLASHING - RGUARD <br />FASTF LAS H <br />MAIN FLASHING c MAN DOORS <br />FF-2 <br />FORTIFIBER MOISTOP PF <br />FLEXIBLE COUNTER FLASHING (IF <br />NEEDED) <br />FF-3 <br />LIQUID APPLIED FIBER <br />REINFORCED FLEXIBLE <br />FLASHING - RGUARD JOINT & <br />SEAM FILLER <br />SUPPLEMENTAL FLEXIBLE <br />FLASHING W/ FF-1 <br />FF-4 <br />QUICK FLASH FLASHING <br />PANELS <br />@ ALL MISC PENETRATIONS (OR FFm <br />1 ASSEMBLY OPTION) <br />FF-5 <br />FF-6 <br />SA -1 <br />BAMILEX GLASS MESH TAPE <br />TBD BY E -1 MFR <br />FORTIFIBER FORTIFLASH <br />ME-1 DECK TO WALL <br />REINFORCEMENT 6" TO 4" ROLL <br />ME-1 FLAT SEAM <br />REINFORCEMENT; 4" ROLL <br />@ BLDG CORNERS <br />SIDING & <br />PLY®1 <br />1 1/8" T&G AC PLYWOOD <br />@ ALL LANDINGS & WALKWAYS <br />ACCESSORIES <br />PLY-2 <br />MATCH (E) <br />@ WALLS WHERE (E) PLY IS RE/REP <br />I m1 <br />HARD IEPANE L VERT SIDING <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />RB <br />FORTIFIBER SUPER JUMBO <br />TEX 60 MINUTE <br />ALL LOCATIONS WHERE SIDING IS <br />RE/REP <br />YPA <br />5/8" DENSGLASS GOLD <br />STAIR TOWER SOFFIT & SHEATHING <br />RE/REP LOCATIONS <br />P-1 <br />T1 11 SOFFIT PANELS <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />VENT-1 <br />LINEAR SOFFIT VENT STRIP <br />STAIR TOWER SOFFIT RE/REP <br />LOCATIONS <br />TRIM-1 <br />2 X 2 <br />VERT TRIM @a INT CORNERS <br />TRIM-2 <br />5/4 X 12 <br />TRIM @ COLUMNS & WALL ENDS <br />TRIM-3 <br />1 X 2 <br />SOFFIT TRIM <br />L G-1 <br />5/4 X 6 <br />RAILING MOUNT LOCATIONS & MISC <br />PENETRATIONS <br />L - <br />5/4 X 12 <br />STANDPIPE PENETRATIONS <br />REV-1 <br />FCP-VERTICAL <br />VERT REVEAL <br />REV-2 <br />FCP-OUTSIDE CNR <br />OUTSIDE CORNER REVEAL <br />REV® <br />FCP-INSIDE CNR <br />INSIDE CORNER REVEAL <br />V-4. <br />FCP-HOZ TRIM <br />HORN REVEAL <br />REV-5 <br />FCP-J CHANNEL <br />VERT/HORI%J-CHANNEL <br />METALS <br />TL®1 <br />PRE -PRIMED <br />REF METAL FLASHING SCHEDULE <br />TLe2 <br />GALVANIZED <br />REF METAL FLASHING SCHEDULE <br />TL-3 <br />SHASTA WHITE <br />MISC HEAD FLSHINGS <br />TL <br />PARCHMENT <br />BASE METAL FLASHING @ CONC <br />TL95 <br />TBD <br />BASE METAL FLASHING @ BRICK <br />DOORS <br />DOOM®1 <br />STEELC FT L-20 SERIES <br />REPLACEMENT DOOR a@ STAIR <br />TOWER TO HALLWAY <br />LIGHTS <br />LIGHT®1 <br />SEA GULL LIGHTING; 4 ;25-68 <br />SOFFIT MOUNTED LIGHT <br />PAINT <br />T-1 <br />TBD <br />STAIR TOWER BODY COLOR; REF <br />FAINT SCHEDULE <br />P T®2 <br />TBD <br />STAIR TOWER ACCENT COLOR; REF <br />PAINT SCHEDULE <br />P T®3 <br />COLOR TO MATCH TL-3 <br />REF PAINT SCHEDULE <br />PNTA <br />COLOR TO MATCH MTL4 <br />REF PAINT SCHEDULE <br />PNT-5 <br />COLOR TO MATCH TL-5 <br />REF PAINT SCHEDULE <br />PNT-6 <br />TBD <br />STAIR TOWER SOFFIT & TRIM <br />COLOR; REF PAINT SCHEDULE <br />P T-7 <br />TBD; COLOR TO MATCH <br />RAILINGS <br />REF PAINT SCHEDULE <br />P T=E <br />GENERAL FOR "PAINT TO <br />MATCH (E)" <br />AS NEEDED <br />RESPONSIBLE1. MATERIAL SCHEDULE IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS <br />4 R IDENTIFYING ALL aA ^ RIA .. ■ E OF REPAIR. <br />PRODUCTS.SPECIFICATIONS FOR MATERIALS & INSTALLATION INFORMATION FOR SPECIFIC <br />NOTED2. ADDITIONAL PRODUCTS & MATERIALS MAY BE INCLUDED IN SPECIFICATION SECTIONS & <br />NOT -._ <br />710 .-nd Avenue, Suite 400 <br />Seattle, WA 98104 <br />016 REGISTERED <br />ARCHITECT <br />r <br />I <br />LISA CLARK MOE <br />STATE OF WASHINGTON <br />The documents created by the <br />Architect and its Consultants <br />for this project are instruments <br />of the Architect's service, The <br />Architect retains all common <br />law, statutory and other <br />reserved rights, including the <br />copyright, The Architect's <br />documents shall not be used <br />by anyone on any other <br />project, except with the <br />Architect's written permission. <br />f <br />PROJECT #: <br />DRAWN BY: <br />L DIGS, FILS <br />CHECKED BY: <br />MFV <br />9 <br />MNM <br />REVISIONS: <br />10-16©2020 PERMIT SET <br />BLDG DEPT: <br />DATE: <br />SHEET TITLE: <br />umEDULES <br />