My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-58 2022-12-30
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
3003 W CASINO RD BLDG 40-58 2022-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2022 2:14:02 PM
Creation date
12/30/2022 2:12:52 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY OF EVERETT <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Construction Manager(Construction): Mark Gosnold <br /> Construction Manager(Design): Ivan Rybachuk <br /> Project Administrator: Matthew Leon <br /> PROJECT NAME: Spar Paint Work Center <br /> LOCATION (BLDG/FLR/COL): 40-58.01/A4.0 <br /> PROJECT TIMELINE&PERMIT NEED DATE: Foundations (DEMO) Permit Need Date: 7/19/2019 <br /> (Demo Start @ 60%) <br /> Foundation (DEMO) IFC:8/9/19 <br /> Foundation IFC: 9/11/19 <br /> Utility Installation IFC: 9/10/19 <br /> Support Space IFC: 10/16/19 <br /> MAXIMO JOB#: W6244941/CM W/O#23331841 <br /> W5983281/CM W/O#23331832 <br /> CHARGELINE#: 66=1514005=DTLCAP661677X5=CIPLOP8X=X=CD=C600=699 <br /> 66=1514005=DTLCAP661677X5=CIPLOP8Z=X=CD=C600=699 <br /> CONTRACT PRICE OF WORK BEING <br /> PERMITTED: <br /> CONTRACTOR NAME: Hoffman Construction <br /> CONTRACTOR E-MAIL nathan-sharpe@hoffmancorp.com <br /> CONTRACT STATE LISC#: #HOFFMCC164NC <br /> CONTRACTOR CITY OF EVERETT LISC#: #41705 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: The Spar Paint Work Center involves(3) large scopes of work for <br /> (Do not include electrical and mechanical F&AM, which include Paint Booth Foundations(Demo & <br /> scope and costs. Contractors will secure Construction), Paint Booth Utilities, &Work Center Support <br /> these permits) Spaces (Paint Storage, Paint Mix Room, Paint Gun Cleaning, & <br /> Change Rooms). <br /> At this point design is still ongoing as reflected by the IFC design <br /> dates above. However, a request to start demolition for the <br /> foundation construction at 60% DEMO Design has been made <br /> and would include the following scope of work: <br /> This project will use the existing plastic enclosure in the current <br /> Spar Paint footprint to support construction efforts.A plastic <br /> ceiling will be installed to fully enclose the space. <br /> Fans will be installed in the pedestrian doorways along the West <br /> exterior wall of the building to create a negative pressure <br /> environment to help contain dust. <br />
The URL can be used to link to this page
Your browser does not support the video tag.