If vibrations and noise are not a concern in that part of the <br /> building,crews will use a conventional concrete breaker to <br /> break up the slab at a reduce cost. <br /> If vibrations and noise are a concern,the concrete will be saw <br /> cut into 3 ft x 3 ft squares and removed in sections.There will <br /> be some concrete breaking needed to break up the cement <br /> treated sub base. <br /> All excavation equipment will be Tier 4 diesel units. <br /> Hoffman will work 1st or 2"d shift as needed to support <br /> manufacturing requirements. <br /> The spoils will be loaded directly into dump trucks that will be <br /> driven through the West Mega door. If trucks are not <br /> acceptable,the material will be removed in 2 yard tippy <br /> dumpsters as is being done in the Spare Blade Gantry work <br /> center at a much higher cost. <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1) site plan, (4)full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.i.haberlack@boeing.com <br /> 2�2 <br />