My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 007200 - 9 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 2.3.3.4 Unknown Utilities <br /> ' When a utility interferes with the Work and is either(1)not identified on the Drawings or(2)located in a <br /> position significantly different from that specified on the Drawings,Contractor shall follow the <br /> procedures of ARTICLE 11.DIFFERING SITE CONDITIONS. Interference with the Work is <br /> ' deemed as a utility that crosses or projects into the plane of the Work at an elevation between the top and <br /> bottom of the Work. If it is necessary to remove,relocate,or temporarily maintain the utility,that work <br /> shall be included in a Change Order. The utility owner has the option of doing such work or permitting <br /> ' the work to be performed by the Contractor. In either case,the cost of the work incurred by or charged to <br /> the Contractor will be included in a Change Order. <br /> 2.4. SUBMITTALS <br /> Where required by the Contract Documents,the Contractor shall submit information which will enable <br /> the Owner's Representative to advise the Owner whether the Contractor's proposed materials,Equipment <br /> or methods of work are in general conformance to the design concept and in compliance with the <br /> ' Drawings and Specifications,such as catalog cuts and shop,working or detail drawings. In its <br /> Submittals,the Contractor shall expressly and explicitly notify the Owner's Representative of any and all <br /> deviations from the Specifications.Without express and explicit Notice of a deviation from the Contract <br /> ' requirements,approval of a Submittal does not relieve Contractor from complying with Contract <br /> requirements.The Owner's approval of a Submittal does not constitute a waiver of the Contract <br /> requirements. The Owner or Owner's Representative shall respond to a Submittal within thirty(30)days <br /> of receipt. The Owner or Owner's Representative may extend this time for good cause by notifying the <br /> Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials,Equipment,or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> ' responsible for Delays,inefficiencies,or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review,comment,and <br /> correction. Contractor's failure to submit required information in sufficient time for review,comment <br /> and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br /> or Contract Time arising out of,or related to, such a Submittal. Contractor acknowledges and agrees that <br /> it may not rely upon receiving the Owner's response to a Submittal in less than thirty(30)days,unless the <br /> Owner explicitly changes this section by a signed Change Order. Requests for information or <br /> clarification from the Contractor to the Owner shall be treated as a Submittal. <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> ' The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> 3. OWNER <br /> 3.1. GENERAL <br /> ' The Owner,and the Owner's Representative, shall have the authority to act as the sole judge of the Work, <br /> Equipment and materials with respect to both quantity and quality as set forth in the Contract. It is <br /> expressly stipulated that the Drawings,Specifications and other Contract Documents set forth the <br /> ' requirements as to the nature of the completed Work and do not purport to control the method of <br /> performing Work except in those instances where the nature of the completed Work is dependent on the <br /> method of performance. <br /> 00 72 00 - 9 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.