Laserfiche WebLink
City of Everett 00 72 00 - 10 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> The Owner has the authority to act,do,perform,and make any all decisions and actions authorized by the <br /> Contract Documents, including,but not limited to,Change Orders,progress payments,Contract <br /> decisions,acceptability of the Contractor's Work,and early possession. The Owner has the authority to <br /> accept or reject requests for progress payments that have been submitted by the Contractor and <br /> recommended by the Owner's Representative. The Owner has the authority to make determinations of <br /> the acceptability of the Work. The Owner also has the authority to accept or reject the Owner's <br /> Representative's recommendations regarding retention of defective Work. <br /> 3.2. OWNER'S REPRESENTATIVE <br /> The Owner's Representative shall be satisfied that all the Work is being done in accordance with the <br /> requirements of the Contract. The Contract and Specifications give the Owner's Representative authority <br /> over the administration of the Contract. Whenever it is so provided in this Contract,the decision of the <br /> Owner's Representative shall be final. <br /> The Owner's Representative's decisions will be final on all questions including but not limited to,unless <br /> specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> 7. Suspension(s)of Work. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders from the Owner's <br /> Representative: <br /> 1. The Owner's Representative may use the Owner's resources,other contractors,or other means to <br /> accomplish the Work,and <br /> 2. The Owner will not be obligated to pay the Contractor,and will deduct from the Contractor's <br /> payments,any costs that result when any other means are used to carry out the Contract <br /> requirements or Owner's Representative's orders. <br /> At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms,to carry out the Owner's Representative's orders,or <br /> to correct unsafe conditions of any nature;or <br /> 2. It is in the public interest. <br /> The Owner's Representative and Owner shall have complete access to the Work and to the Site of the <br /> Work and to the places where Work is being prepared or where materials,Equipment,and machinery are <br /> being obtained for the Work. If requested by the Owner's Representative or Owner,the Contractor shall <br /> provide the assistance necessary for obtaining such access,and shall provide information related to the <br /> inspection of construction. Absence of such access or information,as needed,may result in the Owner's <br /> refusal to accept the Work. <br /> The Owner's Representative has the authority to recommend Change Orders,but does not have authority <br /> to approve Change Orders. Proposed Change Orders are subject to review and approval by the Owner. <br /> No proposed Change Order or any change of Contract Sum or Contract Time is effective or binding upon <br /> the Owner unless and until the Mayor or his or her designee signs it,as authorized by City Council or by <br /> ordinance. <br /> 00 72 00 - 10 GENERAL CONDITIONS <br />