IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 11 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> To detail and illustrate the Work,the Owner's Representative may furnish to the Contractor additional <br /> ' Drawings and explanations consistent with the original Drawings. The Contractor shall perform the Work <br /> according to these additional Drawings and explanations. <br /> The Owner's Representative may appoint assistants and inspectors to assist in determining that the Work <br /> ' and materials meet the Contract requirements.Assistants and inspectors have the authority to reject <br /> defective material and suspend Work that is being done improperly,subject to the final decisions of the <br /> Owner's Representative or,when appropriate,the Owner. <br /> ' Assistants and inspectors are not authorized to accept work,to accept materials,to issue instructions,or to <br /> give advice that is contrary to the Contract.Work done or material furnished which does not meet the <br /> Contract requirements shall be at the Contractor's risk and shall not be a basis for a Contract Claim even <br /> if the Owner's Representative,inspectors or assistants purport to change the Contract. <br /> Assistants and inspectors may advise the Contractor of faulty Work or materials or infringements of the <br /> terms of the Contract;however,failure of the Owner's Representative or the assistants or inspectors to <br /> ' advise the Contractor does not constitute acceptance or approval. <br /> The Contractor shall submit supplemental working or detail drawings as required for the performance of <br /> the Work pursuant to 2.4. SUBMITTALS.Except as noted,all drawings and other Submittals shall be <br /> delivered directly to the Owner's Representative. The drawings shall be on sheets measuring 22 by 34 <br /> inches, 11 by 17 inches,on sheets with dimensions in multiples of 8 1 /2 by 11 inches,or other size <br /> approved by the Owner consistent with the Work to be detailed. Contractor shall provide drawings far <br /> ' enough in advance of ordering or installation to allow for review by the Owner's Representative or other <br /> agencies and possible resubmittal and further review after resubmittal. After a plan or drawing has been <br /> reviewed and returned to the Contractor,all changes proposed by the Contractor may be submitted to the <br /> Owner's Representative for review and comment. <br /> ' The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not impose <br /> any responsibility upon the Owner,nor does it relieve the Contractor of any responsibility for the <br /> accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all risk and all <br /> costs of any Work delays caused by resubmittal or correction of Submittals. The Contractor shall allow <br /> sufficient time for Owner's review of Submittals and possible corrections by the Contractor so as not to <br /> ' delay the Work. <br /> The Contractor's Bid price shall include all costs of all Submittals, including,but not limited to,working, <br /> detail and shop drawings. <br /> 4. CONTRACTOR <br /> 4.1. CONTRACTOR'S REPRESENTATIVE <br /> The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matters relating to this Contract. This <br /> ' person shall have authority to carry out the provisions of the Contract and to supply materials,Equipment, <br /> tools and labor without delay for the performance of the Work. <br /> I <br /> 00 72 00 - 11 GENERAL CONDITIONS <br />