IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 30 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 1 <br /> If the Contract Documents, laws,ordinances,or any public regulatory authority requires parts of the Work <br /> to be specially inspected,tested,or approved,the Contractor shall give the Owner's Representative <br /> adequate prior written Notice of the availability of the subject Work for examination,which Notice shall <br /> be not less than two(2)working days. <br /> Inspection and quality control tests performed on Work by the Contractor by the Owner's Representative <br /> shall not relieve the Contractor of its responsibility for errors or lack of quality therein and shall not be <br /> regarded as an assumption of risks or liability by the Owner's Representative for the Contractor's <br /> compliance with these Contract Documents. Contractor remains responsible and liable for all errors, <br /> defects or a lack of quality not discovered by inspection or observation. <br /> If parts of the Work are covered prior to inspection or observation,the cost of exposing the Work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the Work is <br /> found to be in compliance with the Contract. <br /> 8.6.2. Samples of Materials <br /> The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br /> require laboratory examination or special testing,as requested by the Owner's Representative. Such <br /> Samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the Work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence of a <br /> specific test requirement,the Owner's Representative will determine the appropriate standard test to be <br /> used. <br /> 8.6.3. Certification <br /> In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests,the Contractor shall provide properly authenticated documents, <br /> certificates,or other proof satisfactory to the Owner's Representative that the materials and Equipment <br /> comply with the Contract requirements. These documents,certifications,and proofs shall include <br /> performance characteristics,construction materials, and physical or chemical characteristics of materials. <br /> The Contractor shall pay all associated costs of such certification. <br /> 8.6.4. Inspection at Point of Manufacturing <br /> The Contractor shall be responsible and reimburse the Owner for the costs of inspections occurring <br /> outside of Whatcom, Skagit,Island, Snohomish,King,Pierce and Thurston counties if(a)inspection and <br /> testing of materials or Equipment in the vicinity of the Work by the Owner is not practicable,(b) the <br /> Contractor requests the Owner to inspect and test material or Equipment at the point of manufacture,or <br /> (c)the Specifications require that inspection,testing or witnessing of tests take place at the point of <br /> manufacture. Costs to be paid or reimbursed by the Contractor include,but are not limited to,travel, <br /> subsistence,labor and lodging expenses of the Owner's inspector. <br /> 8.6.5. Testing and Commissioning of Completed Work <br /> Testing and commissioning of all mechanical,electrical,and instrumentation systems and completed <br /> portions of the Work,functioning as a completed system and the complete Project,functioning as a <br /> completed facility,shall be done in accordance with the Specifications. 111 <br /> 8.6.6. Storage of Materials and Equipment <br /> Contractor shall store materials and Equipment so as to insure the preservation of their quality and fitness <br /> for the Work. Stored Equipment and materials shall be located so as to facilitate inspection. The <br /> Contractor shall be responsible for damages, loss or casualty occurring to materials and Equipment until <br /> Final Acceptance. 1 <br /> I <br /> 00 72 00 - 30 GENERAL CONDITIONS <br />