Laserfiche WebLink
I <br /> City of Everett 00 72 00 - 29 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 8.2. PRODUCT DATA <br /> When specified,the Contractor shall provide data required for inspecting,testing,operating,or <br /> maintaining parts of the Work. Unless otherwise specified,such data shall be provided at the time the <br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall <br /> include,unless otherwise specified,such items as shop drawings,erection drawings,reinforcing steel <br /> schedules,testing and adjusting instructions,operations manuals,maintenance procedures,parts lists,and <br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability <br /> determined by the Owner in its sole discretion. <br /> 8.3. QUALITY <br /> Where detailed Specifications of materials,Equipment,or construction Work are not set forth,the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work,from firms of established good <br /> reputations,and shall follow standard practices to perform construction Work of good quality in a <br /> workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the <br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and <br /> conform to applicable building codes in effect when the Work is performed. <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> When material or Equipment is specified by reference to patents,brand names,or catalog numbers,the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer <br /> substitutions of products it considers to be equal to that specified,but the Owner is not obliged or required <br /> to consider or accept such offered substitution. <br /> 8.5. REQUESTS FOR SUBSTITUTION <br /> The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's offers of <br /> substitution shall be made in writing to the Owner's Representative and shall include sufficient data to <br /> enable the Owner's Representative to assess the acceptability of the material or Equipment for the <br /> particular application and requirements. The Owner and Owner's Representative are not required or <br /> obligated to consider or review a request for substitution and may, in their sole discretion and option, <br /> consider or review such requests. <br /> If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve the <br /> Contractor from responsibility for the efficiency, quality,and performance of the substitute material or <br /> Equipment,in the same manner and degree as the material and Equipment originally specified. Any cost <br /> differential associated with a substitution shall be reflected in the offer. If the Owner approves the <br /> substitution,the Contract Documents shall be modified by a Change Order modifying the Contract Sum <br /> in the amount of the cost differential. <br /> 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> 8.6.1. Inspection <br /> The burden of proving the constructed Work complies with the Contract Documents shall be on the <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements,the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the Work. The <br /> Contractor shall grant the Owner's Representative access to the Work and Work Site,and to places where <br /> Work is being prepared,or where materials,Equipment,or machinery are being obtained for Work. The <br /> Contractor shall provide information requested by the Owner's Representative in connection with <br /> inspection work. <br /> 00 72 00 - 29 GENERAL CONDITIONS <br />