My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 42 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> When a Supplier of services is compensated through invoice,but acts in the manner of Subcontractor,as <br /> described in 9.6.6.For Contractor Markup of Subcontractors Work of this provision,then markup for <br /> that invoice shall be according to 9.6.6.For Contractor Markup of Subcontractors Work. <br /> 9.6.5. For Mobilization. <br /> Force Account mobilization is defined as the preparatory work performed by the Contractor including <br /> procurement,loading and transportation of tools and equipment,and personal travel time,when such <br /> travel time is a contractual obligation of the Contractor or a customary payment for the Contractor to all <br /> employees. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. Owner will pay for mobilization for off-site preparatory work for <br /> Force Account items provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity,if desired. <br /> Any costs experienced during mobilization activities for labor,equipment,materials or services shall be 111 <br /> listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. I <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors,by lower- <br /> tier Subcontractors or Suppliers,or through invoice by firm(s)acting in the manner of a Subcontractor, <br /> the Contractor will be allowed an additional markup,from the table below,applied to the costs computed <br /> for Work done by each Subcontractor through 9.6.1, 9.6.2, 9.6.3,and 9.6.4,to compensate for all <br /> administrative costs,including project Overhead,general company Overhead,profit,bonding,insurance, <br /> Business&Occupation tax,and any other costs incurred. <br /> A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br /> or more of the following characteristics: <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall project, I <br /> including extensive coordination,interpretation of Drawings,interaction with the Owner or <br /> management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled,operated and maintained by the firm. Operators of rented I <br /> equipment are supervised directly by the firm's representative. There is a little interaction <br /> between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. <br /> Markups on Work Performed by Subcontractor(s): I <br /> On amounts paid for Work performed <br /> by each Subcontractor on each <br /> Force Account and calculated Up to$25,0000 12% <br /> through 9.6.1-4 <br /> On amounts greater than $25,000 up to$100,000 10% <br /> On amounts greater than $100,000 7% 1 <br /> The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br /> Account item established. <br /> The payments provided above shall be full payment for all Work done on a Force Account basis. The <br /> calculated payment shall cover all expenses of every nature,kind and description,including those listed <br /> above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br /> shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br /> Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br /> Account shall be computed by the Owner's Representative and the result shall be final as provided in 3.2 <br /> OWNER'S REPRESENTATIVE. <br /> 00 72 00 - 42 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.