IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 43 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless <br /> a change,as defined in ARTICLE 6.CHANGES,has occurred and the provisions require a payment <br /> adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br /> Force Account may,by agreement of the parties at any time,be converted to agreed unit prices or lump <br /> sums applicable to the remaining Work. <br /> 9.7. RETAINAGE <br /> Pursuant to RCW Chap. 60.28,a sum of five percent(5%)of the monies earned by the Contractor will be <br /> retained from progress estimates. In addition to protecting the interests of those identified in RCW Chap. <br /> 60.28,such retainage shall be used as a trust fund for the protection of the Owner. <br /> At the option of the Contractor;monies retained under the provisions of RCW 60.28 shall be: <br /> 1. Retained in a fund by the Owner,or <br /> 2. Deposited by the Owner in an escrow(interest-bearing)account in a bank,mutual saving bank,or <br /> savings and loan association(interest on monies so retained shall be paid to the Contractor). <br /> Deposits are to be in the name of the Owner and may not be withdrawn without the Owner's <br /> written authorization. The Owner will issue a check representing the sum of the monies reserved, <br /> payable to the bank or trust company. Such check shall be converted into bonds and securities <br /> chosen by the Contractor as the interest accrues.Bank and Contractor will execute an escrow <br /> agreement in the form provided by Owner. <br /> 3. Released after submission of fully executed retainage bond in the form provided by Owner. <br /> The Contractor shall designate the option desired at the time the Contract is executed. If the Contractor <br /> chooses option 2(deposit in escrow account),Contractor agrees to assume full responsibility to pay all <br /> costs that may accrue from escrow services,brokerage charges or both,and further agrees to assume all <br /> risks in connection with the investment of the retained percentages in securities. The City may also,at its <br /> option,accept a bond in lieu of retainage. <br /> Retainage will be released when all of the following conditions are satisfied: <br /> 1. Sixty(60)days have elapsed following the completion of all Work specified in the Contract;and <br /> 2. The Contractor fulfilled all of all obligations of the Contractor under the Contract, including,but <br /> not limited to,the Contractor's furnishing all documentation required by Contract and law;and <br /> 3. A release has been obtained from the Washington State Department of Revenue;and <br /> 4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the Owner <br /> (RCW 39.12.040);and <br /> 5. A release has been obtained from the Washington State Department of Labor&Industries and the <br /> Washington State Employment Security Department;and <br /> 6. All claims,as provided by law,filed against the retainage have been resolved. In the event claims <br /> are filed and provided the conditions one through five are met,the Contractor will be paid the <br /> retained percentage less an amount sufficient to pay any such claims together with a sum <br /> determined by the Owner sufficient to pay the cost of claims and attorney's fees. <br /> 7. All other conditions required by law are satisfied. <br /> I <br /> I <br /> 00 72 00 - 43 GENERAL CONDITIONS <br />