Laserfiche WebLink
I <br /> City of Everett 00 72 00 - 48 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> hereby certifies that the Contract Claim for an adjustment to the Contract Sum and/or <br /> Contract Time, if any,made herein for Work on this Contract is a true and complete <br /> statement of the factual basis of the Contract Claim and all actual costs incurred and time 111 <br /> _ sought,and is fully documented and supported under the Contract between the parties. <br /> Date /s/ I <br /> Subscribed and sworn before me this day of <br /> Notary Public I <br /> My Commission Expires: <br /> 12.3 FALSE OR OMITTED INFORMATION I <br /> The Contractor waives each Contract Claim for which it presents material information that it knows,or in <br /> the exercise of reasonable care should know,is false,or omits or fails to disclose material information <br /> relating to such Contract Claim. In such case,Contractor shall reimburse the Owner for any and all fees <br /> and expenses incurred in investigating any such Contract Claim. <br /> 12.4 REMEDIES <br /> 12.4.1 General <br /> If a Contract Claim has merit in whole or in part,then Contractor's sole remedies shall be those provided <br /> in this subsection. Contractor must timely and strictly comply with the requirements of 10.NOTICE TO <br /> OWNER, 11.DIFFERING SITE CONDITIONS, 12. CONTRACT CLAIMS and all other General <br /> Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br /> 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of <br /> the Contract Claim. <br /> 12.4.2 Extra Work <br /> 12.4.2.1 Adjustment of Contract Sum , <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work,the adjustment shall <br /> be calculated and paid as provided in 9.5.ADJUSTMENT OF CONTRACT SUM. This amount <br /> includes jobsite and home office Overheads for such Work, including any schedule delays relating to such <br /> Work. Therefore,no compensation in addition to that provided in 9.6.FORCE ACCOUNT shall be <br /> paid for such things as extended Overhead or other costs or damages. <br /> 12.4.2.2 Extension of Contract Time <br /> Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br /> Extensions of Contract Time. <br /> 12.4.3 Delays <br /> 12.4.3. Owner Caused Delay Unrelated to Extra Work <br /> 12.4.3.1.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the <br /> Owner that does not relate to Extra Work,Contractor shall only be compensated for the items below, <br /> less all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: <br /> 1. Documented,incurred cost of nonproductive field supervision or labor extended because of the <br /> Delay; <br /> 2. Documented,incurred cost of home office supervision to attend jobsite meetings; <br /> 3. Documented,incurred cost of temporary facilities or equipment rental extended because of the <br /> Delay; i <br /> 00 72 00 - 48 GENERAL CONDITIONS <br />