My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 47 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 6. Identification of any documents and the substance of any oral communications that support the <br /> Contract Claim. <br /> 7. Copies of any identified documents that support the Contract Claim,other than Owner documents <br /> and documents previously furnished to the Owner by the Contractor. Standard industry manuals <br /> 1 may be incorporated by reference. <br /> 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time(including days and dates)sought. <br /> b. The specific reasons the Contractor believes an extension of Contract Time should be <br /> granted,including,but not limited to,compliance with the requirements of 5.2.2.2 <br /> Extensions of Contract Time;and <br /> c. The specific provisions of the Contract Documents under which it is sought. <br /> 9. If Contractor seeks an increase in the Contract Sum,the exact amount sought and a breakdown of <br /> that amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a Contract Claim is <br /> made or in the absence of actual cost,the rates established by the AGC/WSDOT Equipment <br /> Rental Agreement that was in effect when the work was performed. In no case shall the <br /> amounts sought or paid for each piece of equipment exceed the rates established by the <br /> Equipment Rental Agreement even if the actual cost for such equipment is higher. The <br /> Owner may audit the Contractor's cost records to determine actual equipment cost. The <br /> following information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", Tractor <br /> Crawler ROPS &Dozer Included Diesel) <br /> ii. The hours of use or standby;and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job Overhead. <br /> v. Overhead(general and administrative). <br /> vi. Subcontractor's contract claims (in the same level of detail as specified herein is <br /> required for all Subcontractor's contract claims);and <br /> vii. Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the following <br /> language: <br /> Under the penalty of law for perjury or falsification,the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> I <br /> 00 72 00 - 47 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.