My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 52 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 1 <br /> 13. DISPUTES <br /> 13.1 RESOLUTION ' <br /> When a Dispute occurs during a Contract,the Contractor shall pursue resolution through the Owner's <br /> Representative. The Contractor shall follow the procedure stated in 12.CONTRACT CLAIMS herein <br /> and 5.2.2.2 Extensions of Contract Time for issues regarding the schedule and Contract Time. Timely <br /> and adequate Notice is a condition precedent to a Contract Claim. Timely and complete submission of a <br /> Contract Claim is a condition precedent to any entitlement by the Contractor to an adjustment of Contract <br /> Sum or Contract Time. Unless waived by the Owner,mediation is a condition precedent to the filing of <br /> any lawsuit,action or proceeding that seeks to recover on a Contract Claim,whether in whole or in part. <br /> 13.2 CONTINUING THE WORK I <br /> Contractor shall carry on the Work and adhere to the schedule during all disputes or disagreements with <br /> Owner.No Work shall be delayed or postponed pending resolution of Disputes or disagreements,except <br /> as permitted by paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. I <br /> 14. TIME LIMITATIONS AND JURISDICTION <br /> The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when they arise. <br /> The parties intend that all Claims and Disputes be resolved quickly and expeditiously and desire to avoid <br /> claims and Disputes that relate back to events or Work occurring months before. The parties desire to <br /> avoid litigation and the costs and expense of Claims and Disputes at the end of the Project. <br /> Any Contract Claim for adjustment of Contract Sum or Contract Time,or any Dispute or Contract Claim <br /> of any kind whatsoever,must be submitted,if at all,to the Owner or Owner's Representative no later than <br /> thirty(30)days after Notice was first required to be given by the Contractor as provided in ARTICLE <br /> 10.NOTICE TO OWNER. Failure to submit a Contract Claim within the thirty(30)days of the date <br /> Notice was required pursuant to ARTICLE 10.NOTICE TO OWNER constitutes a complete waiver of <br /> and bar to the Contract Claim,and Contractor is estopped from later asserting a Contract Claim or seeking <br /> any relief or remedy relating to the Dispute for which it failed to submit a Claim. <br /> Contractor may not sue,cross-claim,claim,or bring any action of any kind whatsoever against the Owner <br /> on any Contract Claim or Dispute after the expiration of one hundred eighty(180)days from Physical <br /> Completion. <br /> Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring prior to <br /> Substantial Completion shall be deemed to have accrued in any and all events not later than such date of111 <br /> Substantial Completion. <br /> 15. LIABILITY AND INSURANCE I <br /> 15.1 GENERAL <br /> Contractor bears all risk of loss,casualty or damage to installed Work prior to Final Acceptance, I <br /> irrespective of whether the Owner has taken possession of the Project in whole or in part and <br /> notwithstanding the existence or availability of insurance or the insurance coverages required by the <br /> Contract Documents. I <br /> I <br /> I <br /> 00 72 00 - 52 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.